Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹11.7 Laccepted-finance | accepted-finance |
Tender Value
₹11.8 L
EMD Value
₹29,600
Closing Date
25 Mar 2026, 9:30 pmClosed
Directorate of Municipal Administration
S C HUNASIMARAD
AT WARD NO 22 Construction Of RCC Drain from Bagawan house to behind of Kataraki house
DMA/2025-26/BR/WORK_INDENT56543
DMA/2025-26/BR/WORK_INDENT56543
Open
Bridges/Culverts
Electronic Documents, First(One Cover)
DMA Town Municipal Council Gajendragad
₹500
₹29,600
25 Mar 2026
18 Mar 2026
25 Mar 2026
AT WARD NO 22 Construction Of RCC Drain from Bagawan house to behind of Kataraki house
Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/ Soft rock & depth not exceeding 300mm as per d...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work (SCHEDULE OF RATES FOR ROAD AND BRIDGE WORKS 2023 - 2024 PUBLIC WORKS DEPARTMENT GOVER...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and ...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Addendum I Percentage Additionalities for Formwork Centering Scaffolding Page No 111 Sl No 4 Percentage on finished rate of concrete Item NO5
Addendum I Percentage Additionalities for Formwork,Centering & Scaffolding Page No 111 Sl No 4 Percentage on finished rate of concrete Itam No 5
Addendum I Percentage Additionalities for Formwork,Centering & Scaffolding Page No 111 Sl No 4 Percentage on finished rate of concrete Itam No 5
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw-1 56543.docx
Tender Document • 2.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .