Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr Quoted ₹3.6 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 34936454.15 Only |
| 2 | L2₹3.6 Cr+₹1.8 L (0.49%)Rejected-Finance 37A 99 1 MADHU NAGAR GWALIOR ROAD AGRA | AGRA | ₹3.6 Cr+₹1.8 L (0.49%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹3.9 Cr+₹27.5 L (7.61%)Rejected-Finance GARHI NAGAR SAHI AGRA | AGRA | UTTAR PRADESH | 282001 | ₹3.9 Cr+₹27.5 L (7.61%) | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹4.1 Cr+₹52.3 L (14.5%)Rejected-Finance 7C GOVIND NAGAR MATHURA | MATHURA | ₹4.1 Cr+₹52.3 L (14.5%) | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | Rejected-Technical CHITAVAR JOGI MEETAI HATHRAS | - | - | Rejected-Technical Technical Bid Non responsive |
Tender Value
₹6.0 Cr
EMD Value
₹12.0 L
Closing Date
29 Feb 2024, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Renewal work with General Repair of NH-2 to NH-3 via Dakshini Byepass Road in Distt Agra
2024_CEAGR_901678_1
567/14M-AC/2024 dated 01-02-2024
Open Tender
Civil Works
Item Wise
240 days
Agra
Renewal work
2 documents required · 2 mandatory
₹2,360
₹12.0 L
Yes
Agra
1 May 2024
21 Feb 2024
29 Feb 2024
21 Feb 2024
29 Feb 2024
21 Feb 2024
22 Feb 2024
Amount
Providing and laying of a stress absorbing membrane over a cracked road surface, with crack width below 6 mm after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm crushed stone aggregates @ 0.11 cum per 10 sqm with hydraulic chip spreader, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor @ 0.25 kg. Per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with mechanical control to the required grade, level and alingment, rolling with smooth wheeled bibratory and tendom rollers to achiev the desired compection as per MORTH specifiaction clause 509 complete all respects.(Gr.-II)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transportings to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.(As per MORTH 803.4 complete in all respects including cost of all materials, T&P, labour, cess, cartage for proper completion of work as per direction of Engineer-in-Charges.) ZEBRA CROSSING as per Annexure A, Table:A.4: BM02 of IRC :35-2015
M/S AKSHAT CONSTRUCTION
M/S KAKA CONS
M/s Akash Deep Construction Compnay
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .