Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC 18 M S NORTH EAST ENTERPRISE SIJUBARI HATIGAON GUWAHATI ASSAM 781038 | KAMRUP METRO | ASSAM | 781038 | ₹1.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹1.3 Cr+₹443.30 (<0.01%)Rejected-AOC | ₹1.3 Cr+₹443.30 (<0.01%) | L2 | Rejected-AOC Not Awarded |
| 3 | L3₹1.3 Cr+₹3,735.98 (0.03%)Rejected-AOC | ₹1.3 Cr+₹3,735.98 (0.03%) | L3 | Rejected-AOC Not Awarded |
| Sl No | Description | Qty | Unit | NORTH EAST ENTERPRISE L1 | S. D. Enterprise L2 | Akhil Kumar Jain L3 |
|---|---|---|---|---|---|---|
| 1.00Civil Works | ||||||
| 2.00 | 5.22.5 - Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Mild steel and Medium Tensile steel bars. | 13,892.42 | Kg | 91.7 ₹12,73,934.91 | 91.6 ₹12,72,545.67 Lowest | 92 ₹12,78,102.64 |
| 3.00 | 5.9. : Centering and shuttering including strutting, propping etc. and removal of form for : 5.9.6 : Columns, Pillars, Piers, Abutments, Posts and Struts | 307.2 | sqm | 828.4 ₹2,54,484.48 Lowest | 828.5 ₹2,54,515.2 | 829 ₹2,54,668.8 |
| 4.00 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone
aggregate 20 mm nominal size) | 149.2 | cum | 10,490.7 ₹15,65,212.44 | 10,490.6 ₹15,65,197.52 Lowest | 10,491 ₹15,65,257.2 |
| 5.00 | 5.9. : Centering and shuttering including strutting, propping etc. and removal of form for : 5.9.3 : Suspended floors, roofs, landings, balconies and access platform | 647.22 | sqm | 789.6 ₹5,11,044.91 | 789.5 ₹5,10,980.19 Lowest | 790 ₹5,11,303.8 |
| 6.00 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs
having slope up to 15° landings, balconies, shelves, chajjas, lintels,
bands, plain window sills, staircases and spiral stair cases above plinth
level up to floor five level, excluding the cost of centering, shuttering,
finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse
sand(zone-III) derived from natural sources : 3 graded stone aggregate
20 mm nominal size derived from natural sources). | 1 | cum | 91.7 ₹91.7 | 91.6 ₹91.6 Lowest | 92 ₹92 |
| 7.00 | 6.13.2 : Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level.
6.13.2 Cement mortar 1:4 (1 cement :4 coarse sand) | 749.95 | sqm | 1,048.6 ₹7,86,397.57 Lowest | 1,048.7 ₹7,86,472.57 | 1,050 ₹7,87,447.5 |
| 8.00 | 9.1 Providing wood work in frames of doors, windows, clerestory windows
and other frames, wrought framed and fixed in position with hold fast
lugs or with dash fasteners of required dia & length (hold fast lugs or
dash fastener shall be paid for separately). | 2.1 | cum | 1,08,186.1 ₹2,27,190.81 | 1,08,186.1 ₹2,27,190.81 | 1,08,186 ₹2,27,190.6 Lowest |
| 9.00 | 13.5.1: 15 mm cement plaster on the rough side of single or half brick wall of mix :1:4 (1 cement: 4 coarse sand) | 874.95 | sqm | 349.9 ₹3,06,145.01 Lowest | 349.9 ₹3,06,145.01 Lowest | 350 ₹3,06,232.5 |
| 10.00 | 13.4 12 mm cement plaster of mix :
13.4.1 1:4 (1 cement: 4 coarse sand) | 1,389.88 | sqm | 303.7 ₹4,22,106.56 Lowest | 303.7 ₹4,22,106.56 Lowest | 304 ₹4,22,523.52 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
9 Apr 2024, 3:00 pmClosed
Managing Director
Managing Director at APTDCLtd. Ganeshguri, Guwahati - 05
Construction of working Womens Hostel at Nalbari under the Department of Women and child Development, Assam
2024_WPTBC_37467_1
PTDC/Engg/2023-24/198
Open Tender
Civil Works
Item Rate
270 days
Beltola
Please refer tender document
3 documents required · 3 mandatory
₹2,650
Yes
₹2.6 L
Yes
31 Oct 2025
30 Mar 2024
10 Apr 2024
30 Mar 2024
9 Apr 2024
30 Mar 2024
30 Mar 2024 - 31 Mar 2024
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .