Tender Value
₹2.2 L
EMD Value
₹4,407
Closing Date
26 Aug 2026, 10:00 am2d left
Pradhan
Plungdung Gram Panchayat, Bhutia gaon
Construction of Toilet at Lower Chota Poobong Samaj Ghar , Sansad no-III under 16TH CFC 2025 26 within Plungdung Gram Panchayat
2026_GTA_5019277_1
06/16th CFC(2025-26)/Plungdung G.P Dt 19.08.2026
Open Tender
CIVIL WORKS
Percentage
Chota Poobong, Plungdung
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹4,407
Yes
19 Aug 2026
19 Aug 2026
28 Aug 2026
19 Aug 2026
26 Aug 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .(a) Depth of excavation not exceeding 1.500 mm. | - | Cu.M | 119.27 | - |
| 2 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | - | Sq.M | 50 | - |
| 3 | Cost of stone boulder 150 mm size delivered ans stacked at site. | - | Cu.M | 1,526.4 | - |
| 4 | Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site | - | Cu.M | 4,575.6 | - |
| 5 | Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. | - | Cu.M | 6,370.8 | - |
| 6 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. | - | Cu.M | 7,238.4 | - |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). | - | Sq.M | 400.8 | - |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. | 0.24 | Cu.M | 79,822.8 | ₹19,157.47 |
| 9 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:3) in ground floor. | 1 | Sq.M | 1,074 | ₹1,073.89 |
| 10 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface]. | - | Sq.M | 247.2 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
Tendernotice_2.pdf
PDF • 0.52 MB
NIT62NDCALL.pdf
Tender Documents • 1.50 MB
BOQ_5091351.xls
BOQ • 0.28 MB
SBD2NDCALL.pdf
Additional Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].