Tender Value
₹8.3 Cr
EMD Value
₹5.6 L
Closing Date
6 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
DYCECJUC
16 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less, where V= Advertised value of the tender in crores of Rupees, N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-I, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Detailed instructions as per clause 2.3 of tender document.
The tenderer must have successfully completed or substantially completed any of the following (From Govt. Organisation) during last 07 (seven) years, ending last day of the month previous to the one in which tender is invited. Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
Other detailed instructions as per clasue 2.3 of Standard Tender Document
Technical Eligibility Criteria: Similar nature of Work: Any Civil Engineering work involving "earth Work or Blanketing or subgrade in Railway Embankment or Highway Construction or Run way /Taxiway system of Airport or in Dam or Canal and CC/RCC work in any structure copy of letter of similar nature of work. The tenderer must have successfully completed or substantially completed any of the following during last 07 (seven) years, ending last day of the month previous to the one in which tender is invited, Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender.
46 conditions · 5 needing a document upload
Tenderers are compulsorily required to upload certificate as per Annexure - M (A) as the case may be, as stipulated in 2.2.6 of "General Tender Conditions and instruction to tenderers" without which the offer will be considered incomplete and will be rejected summarily (Ref: RB letter No. 2022/CE-I/CT/GCC- 2022/Policy dated 13.12.2022)
The tenderers must necessarily upload/submit the legal documents, pertaining to the constitution of their Concern as applicable, along with the tender, as enumerate in clause 2.4 of special tender condition and instruction to tenderers of tender document.
Tenderer shall certify that they are not black listed or debarred by Railways or any other Ministry/ Department/PSU (Public Sector undertaking) of the Govt. of India/State Govt. from participation in tender/contract on the date of opening of bid either in their individual capacity or as a member of the JV firm in which they were/are members.
T e n d e r e r upload ANNEXURE-Q regarding Employment/Partnership etc. of Retired Railway Employees without which tender will be summarily rejected. Note: This Annexure-Q is to be given by each member of JV.
Tenderer should Submit bank details i.e. Name of the Bank along with Bank Branch Code, Account Number, IFSC Code as per Annexure-J (Real Time Gross Saving (RTGS)/National Electronic Fund Transfer (NEFT) (Model Mandate Form)) of tender document
The tenderer confirms the option of taking payment through LC arrangement. The tenderer affirms having read over and agreed to the terms and conditions of the LC option.
Requisite Bid Security: (A) ONLINE mode - CASH - No Documentary Proof required (B) ONLINE MODE - BG - BG Scanned copy to be uploaded with Tender Documents. Note for (B):- The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderer shall visit the site of work and acquaint himself/themselves with the conditions of work viz. approach roads and accessibility, nature of soil/rock, availability of materials, electric power, water for work and drinking purposes, site for labour camps, stores, godowns, extent of lead/lift in work, availability of skilled and unskilled labour etc. that may be encountered in the course of execution of work. In short, he/they should familiarize himself/themselves fully with the conditions obtaining at site and FURNISH A CERTIFICATE TO THIS EFFECT, in the Proforma appended as Annexure-C of Tender Document.
Tenderers are compulsorily required to fill up/submit requisite details in prescribed Performa of Annexure C to G,I,J and Annexure-L as per tender document without which the offer may be considered as incomplete and be liable to be rejected.
The tenderer's may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderer s shall have no claim s on this account.
The tenderers shall quote the rates of one single % age "Above/Below/At par" on the total amount comprising basic value of USSOR - 2021 plus escalation (Schedule "A") and (Schedule "D" P.way items), entire Schedule of DSR - 2021 plus escalation (Schedule "B") and one single % age "Above / Below / At par" over entire schedule of Non schedule Items (Schedule "C" & "E") in the attached Schedule of Items, Rates and Quantities . Every possible fluctuation, in the rate of labour, material and general commodities, and other possibilities of each and every kind which may affect the rates, should be considered and kept in view before quoting the rates and no claim on this account shall be entertained by the Railway under any circumstances except the price escalation payable as per price variation clause, if any, provided separately in the tender documents.
TAXES
The contractor shall be governed by the Taxes applicable at the place of actual execution of work as per clause 23.0 of Special Tender Conditions and instruction to tenderers
If on verification of credentials, at the evaluation stage, it is found that the tenderer has submitted forged/fake documents in support of his offer, his Earnest Money Deposit shall be forfeited besides banning of business for a period of upto five year.
IF THE TENDERER S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATE S CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES, BANNING OF BUSINESS FOR A PERIOD OF UPTO FIVE YEAR.
The contractors operations and proceedings in connection with the works shall at all times be conducted during the continuance of contract in accordance with the laws, ordinance, rules and regulations for the time being in force and t h e contractor s h a ll further observe a n d comply with t h e bye-laws and regulations of the Govt. of India, State Govt. and of Municipal other authorities having jurisdiction in connection with the works or site over operations such as these are carried out by the contractor/s and shall give all notice required by such bye-laws and regulations. The Hospital and medical regulations in force for the time being shall also be complied with by the contractor/s and his workmen.
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
Contractor shall at all times keep the railway administration indemnified against all penalties that may be imposed by the Govt. of India or State Govt. for infringements or any of the clauses of the mines act and rules made there under in respect of quarries from which the ballast for these works is procured.
Care for submission of offer
Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the rates he enters in the tender forms are adequate and all inclusive to accord with the provisions in Clause-37 of the Standard General Conditions of Contract for the completion of works to the entire satisfaction of the Engineer.
Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/Integrated Goods and Services Tax Act, 2017(IGST)/Union Territory Goods and Services Tax Act, 2017(UTGST)- respective state's State Goods and Services Tax Act (SGST) also, as notified by Central-State Govt & as amended from time to time and applicable taxes before bidding. Tenderer's will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately after the award of contract, without which no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the railway shall deduct the applicable GST from his/their bills under reverse charge mechanism (RCM) and deposit the same to the concerned authority.
As per Income Tax Act, Tax will be deducted for sums paid for carrying out the work under this contract. In case of supply contract for ballast, deduction of 2% (Two percent) Income tax will be made for the sums paid for labour portion only (i.e., loading, unloading, stacking, measurement and laying etc.). 1% labour cess shall be deducted from each RA bill to be deposited with concerned labour Commissioner/State Govt.
Construction of one no. minor Bridge i.e. Br.No.1A with provision of twin RCC Box of internal size (4.60Mx2.10 M) by Box Pushing technique and other balance works of Ludhiana Yard remodelling i.e. extension of high level passenger platform, drainage work, CC, footpath, hydrant works, discharge wells and other misc. civil and Pway works in connection with Ludhiana -Mullanpur doubling in Ferozepur division over Northern Railway.
1-W-2025-26-5-DyCE-C-JUC
1-W-2025-26-5-DyCE-C-JUC
Open
Works - General
12 Months
Kapurthala, Punjab
₹0
₹5.6 L
6 Mar 2026
9 Feb 2026
222 items across 26 schedules · ₹8,58,43,031.59 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in filling in embankment, guide bunds, around buried type abutments, bridge gaps, trolley refuges, platforms with contractor's own earth conforming Soil Quality Class SQ1/SQ2/SQ3, after preparation of foundations as applicable, benching in existing banks wherever required, spreading in layers with motor grader, bringing the moisture content OMC, mechanical compaction to specified density and dressing of bank to final profile as per RDSO Specifications: RDSO/2020/GE: IRS-0004 with latest correction slips. Note: 1) Foundation preparation, Benching including additional earthwork on account of this, wherever required, shall be paid extra under relevant schedule item for benching. Payment for Earthwork under this item shall be made based on the cross section measurements calculated (i) with original ground profile of existing bank based initial ground levels before doing benching and (ii) final profile of the bank worked with final levels as per prevailing guidelines. | etc. to to 2) on out | — | — | — | |
| 1 | Using Soil Class SQ2 | cum | 4650.00 | 352 | 16,36,800 |
| Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay barricade. Barricades shall be maintained through out the execution of the work shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: 60% payment shall be made on provision of barricading at work-site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall the property of the Contractor. | on and (1) be | — | — | — | |
| 2 | With 3 horizontal bamboo / balli members of minimum 50mm dia. spaced equally | RM | 325.00 | 214.12 | 69,589 |
| 3 | Shoring with 'Z' section MS sheet piles side by side in all kinds of soil mechanically manually as per approved drawing with contractor's own arrangement complete all respects and removal of sheet piles after completion of the work as directed engineer in-charge Note: Payment will made as per actual driven length of pile. | Sqm or in by be | 415.00 | 1,036.39 | 4,30,101.85 |
| 4 | Supplying & laying of drainage composite for use behind abutments, wing walls, return walls and Retaining walls Geocomposite drain (Vertical) as per RDSO Specification No. RDSO/2018/GE:IRS-0006 latest version with all material, labour, equipment, tools and plants, lead, lift complete in all respects as per direction of Engineer-in-Charge. | Sqm etc. the | 135.00 | 626.86 | 84,626.1 |
| Schedule total | ₹22,21,116.95 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
BRIDGE-1A-31-1-26-PDF-61_1.pdf
SpecialConditionsBr.1AandrelatedCivilWorks.pdf
StandardTenderDocumentBr.no.1-A_1.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .