| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-Finance | ₹4.4 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹4.4 Cr+₹2.3 L (0.53%)Rejected-Finance | ₹4.4 Cr+₹2.3 L (0.53%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹4.8 Cr+₹42.7 L (9.74%)Rejected-Finance | ₹4.8 Cr+₹42.7 L (9.74%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | MANIKANDAN L1 | M. Vettivelan L3 | I.Kezhson L2 |
|---|---|---|---|---|---|---|
| 1.00Strengthening the road from Pandarakonam to Varuvilai Road in Kattathurai village Panchayat of Thiruvattar panchayat Union (Km 0/0-1/08)R-341 | ||||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 1,296 | Sq.m | 5 ₹6,480 Lowest | 6 ₹7,776 | 5 ₹6,480 Lowest |
| 3.00Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A | ||||||
| 4.00 | Km 0/0-1/0 | 90 | Cum | 110 ₹9,900 | 135 ₹12,150 | 100 ₹9,000 Lowest |
| 5.00 | Km 1/0-1/1 | 7.2 | Cum | 110 ₹792 | 135 ₹972 | 100 ₹720 Lowest |
| 6.00Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools laying spreading, new metal, hand packing to camber, gravel blinding, watering with all leads of good water, rolling and compacting by power roller and finishing to the total thickness with lines grades and cross section as specified in the departmental specification including all charges for all T&P employed and cost of free and other running charges and all other incidental charges etc. complete | ||||||
| 7.00 | Km 0/0-1/10 | 1,080 | Sq.m | 15 ₹16,200 Lowest | 25 ₹27,000 | 20 ₹21,600 |
| 8.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | ||||||
| 9.00 | Km 0/0-1/0 | 348.75 | Cum | 2,000 ₹6,97,500 | 2,100 ₹7,32,375 | 1,900 ₹6,62,625 Lowest |
| 10.00 | Km 1/0-1/1 | 36 | Cum | 2,000 ₹72,000 | 2,100 ₹75,600 | 1,900 ₹68,400 Lowest |
Tender Value
Refer Docs
EMD Value
₹5.0 L
Closing Date
2 Jul 2025, 3:00 pmClosed
Project Director DRDA
DRDA Collectorate Kanniyakumari
Strengthening of 5 Road works in Package No TN-KKM-SASCI-01 in Thiruvattar and Melpuram Blocks under SASCI 2025-26
2025_RDTN_570864_1
A4/1084/2025(SASCI-1) dated 02.06.2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Thiruvatrtar Melpuram Block Areas
As per Technical Bid
3 documents required · 3 mandatory
₹0
₹5.0 L
DRDA Collectorate Kanniyakumari
21 Aug 2025
19 Jun 2025
2 Jul 2025
19 Jun 2025
2 Jul 2025
19 Jun 2025
19 Jun 2025
Amount
Strengthening the road from Pandarakonam to Varuvilai Road in Kattathurai village Panchayat of Thiruvattar panchayat Union (Km 0/0-1/08)R-341
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools laying spreading, new metal, hand packing to camber, gravel blinding, watering with all leads of good water, rolling and compacting by power roller and finishing to the total thickness with lines grades and cross section as specified in the departmental specification including all charges for all T&P employed and cost of free and other running charges and all other incidental charges etc. complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Sub Estimate For Hard bed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of un-reinforced ,dowel jointed at expansion and including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Clacse 150-1.22 M30 (grade )
Sub Estimate For Retainaining wall
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980cum.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Strenthening of Thettai to Chaikode road 0/0-1/0 in Cherukole Village Panchayat-R-108 of Thiruvattar panchayat Union
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools laying spreading, new metal, hand packing to camber, gravel blinding, watering with all leads of good water, rolling and compacting by power roller and finishing to the total thickness with lines grades and cross section as specified in the departmental specification including all charges for all T&P employed and cost of free and other running charges and all other incidental charges etc. complete
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Provision of 15nos Rumble Strips Coverd with Premix bituuminous carpet 15.20mm high at Centrre 250mm wide placed at 1 cm centre at approved at location to controll speed marked with white strips of road marking paint.
Sub Estimate For Hard bed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980cum.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Construction of un-reinforced ,dowel jointed at expansion and including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Clacse 150-1.22 M30 (grade )
Strenthening of Road Anjukandarai to Pechipparai Dam Kothayar LBC Road 1/190-7/0 in Pechipparai Village Panchayat. R-286 of Thiruvattar panchayat Union
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Picking the Existing metalled surface 5cm to 10cm thick and carefully stacking materials useful for refuse including hire charge for tools laying spreading, new metal, hand packing to camber, gravel blinding, watering with all leads of good water, rolling and compacting by power roller and finishing to the total thickness with lines grades and cross section as specified in the departmental specification including all charges for all T&P employed and cost of free and other running charges and all other incidental charges etc. complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50 mm consolidated thick Bituminious mecadam using 0.24cum of 26.50-13.20mm. graded metal and 0.25cum of 13.20-2.36 mm. graded meta and0.23 cum of 2.36 mm below with 53.20kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc
Strengthening of Melpalai Kusavoornadai Edavalikarai road in Devicode Vpt. Km 0/0 - 1/88 R 119 (vpr) , in Melpuram Block Under SASCI 2025-2026
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Carted earth to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Scarifying the Existing Bituminous road surface to a depth of 100mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregate sofgrading as per Table500.4 premixed with bituminous binder, transported to site up to a lead of 1000mlaidovera previously prepared surface with paver finisher to there quired grade, levelandalignmentand rolled to achieve the desired compaction as per Technical Specification Clause 504.(using 8% of plastic waste)
Providing and applying Prime Coat with bitumenemulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spray in primer at the rate of 0.70-1.0kg/sqmusingmechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Provision of 15nos Rumble Strips Coverd with Premix bituuminous carpet 15.20mm high at Centrre 250mm wide placed at 1 cm centre at approved at location to controll speed marked with white strips of road marking paint.
Provision for Retaining wall
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation wit SS 20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Plastering with cement mortar 1:3 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc.
HARD BED
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Strengthening of Mathoorkonam Pallivilai Vellamcode Road in Vellamcode Vpt. Km 0/0-1/275 , Melpuram Block Under SASCI 2025-2026
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Carted earth to compacted thickness including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Scarifying the Existing Bituminous road surface to a depth of 100mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and applying Prime Coat with bitumenemulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spray in primer at the rate of 0.70-1.0kg/sqmusingmechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Provision of 15nos Rumble Strips Coverd with Premix bituuminous carpet 15.20mm high at Centrre 250mm wide placed at 1 cm centre at approved at location to controll speed marked with white strips of road marking paint.
Provision for Hard Bed
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20B
Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from departmental section stores to the actual worksport and handing charges at each and including cost of from work mix concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tolls and plats and all other incidental charges such as balling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer Table I of IS 2116-1980
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth in all places shown by the departmental officers with initial lead and lifts etc. site etc complete complying with standard specification and as directed in sand, silt and loose soil, wet sand and silt not under water light black cotton soil, sandy loam and ordinary soil including excavated earth as per SS20A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
I.Kezhson (BID ID -1384940)
M. Vettivelan (BID ID -1384949)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .