Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹85.1 LAccepted-AOC 9 BOMBAY MUTUAL ANNEX BLDG CAWASJI PATEL STREET FORT MUMBAI MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | ₹85.1 L | 1 | Accepted-AOC Lowest Responsive |
| 2 | 2₹86.0 LRejected-AOC 112 LBS 400 086 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | ₹86.0 L | 2 | Rejected-AOC Second Lowest |
| 3 | 3₹87.5 LRejected-AOC | ₹87.5 L | 3 | Rejected-AOC Third Lowest |
| Sl No | Description | Qty | Unit | Vijay Engineering And Machinery Company. | RAJESH MACHINERY CORPORATION | ARW INFRA PROJECTS PRIVATE LIMITED |
|---|---|---|---|---|---|---|
| 1.00Supply, Installation, Testing and Commissioning of complete set of rotating assembly for KBL make horizontal split casing pump of model 24UPH3 at M-IIIA Pumping Station, Panjrapur. | ||||||
| 1.01 | SITC of corocoated complete set of rotating assembly at M-3 A Pumping Station, Panjrapur as per technical specifications & scope of work | 1 | Job | 59,98,500 ₹70.8 L | 61,69,000 ₹72.8 L | 60,60,500 ₹71.5 L |
| 1.02 | Corocoating of available spare pump casing M-3 A Pumping Station, Panjrapur as per technical specifications & scope of work | 1 | Job | 12,11,794 ₹14.3 L | 12,46,250 ₹14.7 L | 12,24,000 ₹14.4 L |
| 2.01 | Buyback of Old Rotating Assembly of
24 UPH3, KBL make Pump at M-3 A Pumping Station, Panjrapur as per technical specifications & scope of work | 1 | Job | 1,75,000 ₹1.8 L | 1,75,000 ₹1.8 L | 1,75,000 ₹1.8 L |
Tender Value
Refer Docs
EMD Value
₹88,000
Closing Date
20 Nov 2025, 4:00 pmClosed
DyHE MnE MIIIA PP
Dy.Hydraulic Engineer MnE M-3 A,P.P. Administrative Building, 2nd Floor, Panjrapur Water Treatment Plant, Post Vadpa, Taluka Bhiwandi, District Thane. PIN 421302.
Supply Installation Testing and Commissioning of complete set of rotating assembly for KBL make horizontal split casing pump of model 24UPH3 at M3A Pumping Station Panjrapur
2025_MCGM_1234234_1
DyHE(MnE)/M3A/4449/PP dtd 24.10.2025
Open Tender
Pumps/Motors
180 days
M3A Pumping Station Panjrapur
Successfully completion of SITC OR Supply of minimium capacity of 80 MLD Complete Rotating Assembly OR Pump
3 documents required · 3 mandatory
₹17,134
₹88,000
HE,BMC,Engineering Hub,Worli Naka
12 Jun 2026
30 Oct 2025
21 Nov 2025
30 Oct 2025
20 Nov 2025
30 Oct 2025
13 Nov 2025
Supply, Installation, Testing and Commissioning of complete set of rotating assembly for KBL make horizontal split casing pump of model 24UPH3 at M-IIIA Pumping Station, Panjrapur.
SITC of corocoated complete set of rotating assembly at M-3 A Pumping Station, Panjrapur as per technical specifications & scope of work
Corocoating of available spare pump casing M-3 A Pumping Station, Panjrapur as per technical specifications & scope of work
Buyback of Old Rotating Assembly of 24 UPH3, KBL make Pump at M-3 A Pumping Station, Panjrapur as per technical specifications & scope of work
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
41SBD.pdf
Tender Documents • 1.90 MB
BOQ_2129949.xls
BOQ • 0.06 MB
Download all tender documents and submit your bid