| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | ₹9.4 L | L1 | Accepted-AOC Lowest Value |
| 2 | L2₹9.5 LRejected-Finance TIRUVANNAMALAI TAMIL NADU | NAMAKKAL | TAMIL NADU | 621215 | ₹9.5 L | L2 | Rejected-Finance Highest Value |
| Sl No | Description | Qty | Unit | HARI KRISHNAN CONSTRUTION L2 | Thirumalai L1 |
|---|---|---|---|---|---|
| 1.00Construction of Compound wall (93m) in Somanathaputhur Adi Diavidar Kudiyiruppu Burial Ground @ Edapirai Panchayat | |||||
| 1.01Compound wall | |||||
| 1.02 | Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A. | 61.11 | Cu.m | 267 ₹16,316.37 | 255 ₹15,583.05 |
| 1.03 | Sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard speecifications | 6.98 | Cu.m | 2,158 ₹15,062.84 | 2,145 ₹14,972.10 |
| 1.04 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 10.47 | Cu.m | 5,630 ₹58,946.10 | 5,620 ₹58,841.40 |
| 1.05 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 1.38 | mt | 91,960 ₹1.3 L | 91,940 ₹1.3 L |
| 1.06 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | 134.23 | sqm | 550 ₹73,826.50 | 535 ₹71,813.05 |
| 1.07 | Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete. | 20.98 | Cu.m | 9,540 ₹2.0 L | 9,525 ₹2.0 L |
| 1.08 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications. | 17 | Cu.m | 6,280 ₹1.1 L | 6,265 ₹1.1 L |
| 1.09 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 356.19 | sqm | 295 ₹1.1 L | 290 ₹1.0 L |
Tender Value
₹9.6 L
EMD Value
₹9,560
Closing Date
6 Jan 2026, 3:00 pmClosed
Block Development Officer V.P, Polur
Block Development Office, Polur
Construction of Compound wall (93m) in Somanthaputhur Adi Dravidar Kudiyiruppu Burial Ground at Edapirai Panchayat, Polur Block, Tiruvannamalai District
2026_RDTN_638445_1
A19/3721/2025
Open Tender
Civil Works
Block Development Office, Polur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,560
20 Jan 2026
2 Jan 2026
6 Jan 2026
2 Jan 2026
6 Jan 2026
2 Jan 2026
Amount
Construction of Compound wall (93m) in Somanathaputhur Adi Diavidar Kudiyiruppu Burial Ground @ Edapirai Panchayat
Compound wall
Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A.
Sand and filling in to the basement including cost and conveyance to the site and all labour charges for filling as per standard speecifications
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Reinforced cement concrete 1:1 1/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Painting two coat using readymixed emulsion paint of approved quality and colour over priming coat (New) including cost and all labour charges etc. Complete
Provision for Grill Gate
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
HARI KRISHNAN CONSTRUTION (BID ID -1553979)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Tenderdocument.pdf
Tender Documents • 1.20 MB
BOQ_764090.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid