| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC Work order issued | |
| 2 | L2₹8.1 L+₹14,736.80 (1.84%)Rejected-Finance | L2 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | R.RAJARAM CONTRACTOR L1 | Sri Poomalaiyappa Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts etc., complete as per standard specification for foundations SS 20 A | 77 | M3 | 185 ₹14,245 Lowest | 195 ₹15,015 |
| 2.00 | Supply delivery and filling of River sand in layer of not more than cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidental charges etc. complete as per standard specification. | 5.1 | M3 | 397 ₹2,024.7 Lowest | 400 ₹2,040 |
| 3.00 | Cement concrete of mix 1:4:8 (One cement , Four sandand Eight ggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification. | 8 | M3 | 5,627 ₹45,016 Lowest | 5,627 ₹45,016 Lowest |
| 4.00 | Supply and Fabrication of steel and placing in position RTS steel grills for RCC works as per design given including cost of steel and GI binding wire in floors etc, complete complying with standard specification. | 3,200 | Kgs | 89.8 ₹2,87,360 Lowest | 89.8 ₹2,87,360 Lowest |
| 5.00 | Providing Centering, for PCC & RCC work including cost and labour charges Strutting by using sheets and angles strutting arrangements for the sides and Drain walls,Deck slab etc, and otherl abour charges etc. completeup tor 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. Without Strutting | 252 | M2 | 460 ₹1,15,920 Lowest | 460 ₹1,15,920 Lowest |
| 6.00 | With Strutting | 31.5 | M2 | 919 ₹28,948.5 Lowest | 919 ₹28,948.5 Lowest |
| 7.00 | Reinforced cement concrete 1:1 1/2:3 ( One cement one point five sand and three aggregates) mix using 20mm ISS gauge Hard granite broken stone jelly including cost and conveyance of all materials to site including labour charges for concrete mixing for laying, watering curing property but excluding cost and labour for steel fabrication and centering form work etc. complying with standard specifications. | 35.5 | M3 | 8,607 ₹3,05,548.5 Lowest | 9,000 ₹3,19,500 |
Tender Value
₹9.6 L
EMD Value
₹9,600
Closing Date
2 Sept 2025, 3:00 pmClosed
Executive Officer
Sethiyathope TP
Construction of Drain at Sub register office street in sethiyathope TP
2025_DTP_596308_1
136/2025
Open Tender
Civil Works
Works
90 days
Sethiyathope
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹9,600
17 Sept 2025
22 Aug 2025
2 Sept 2025
22 Aug 2025
2 Sept 2025
22 Aug 2025
22 Aug 2025 - 2 Sept 2025
Amount
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts etc., complete as per standard specification for foundations SS 20 A
Supply delivery and filling of River sand in layer of not more than cm thick including watering with all layers and consolidation complying with standard specification including cost and conveyance of sand at site and all labour charges and all other incidental charges etc. complete as per standard specification.
Cement concrete of mix 1:4:8 (One cement , Four sandand Eight ggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including labour charges, transporting and placing in position including labour for mixing compacting, finishing and curing etc., complete as per standard specification.
Supply and Fabrication of steel and placing in position RTS steel grills for RCC works as per design given including cost of steel and GI binding wire in floors etc, complete complying with standard specification.
Providing Centering, for PCC & RCC work including cost and labour charges Strutting by using sheets and angles strutting arrangements for the sides and Drain walls,Deck slab etc, and otherl abour charges etc. completeup tor 3m height and removing the same after the specification period as directed by the departmental officer etc complete as per standard specification. Without Strutting
With Strutting
Reinforced cement concrete 1:1 1/2:3 ( One cement one point five sand and three aggregates) mix using 20mm ISS gauge Hard granite broken stone jelly including cost and conveyance of all materials to site including labour charges for concrete mixing for laying, watering curing property but excluding cost and labour for steel fabrication and centering form work etc. complying with standard specifications.
Sri Poomalaiyappa Construction (BID ID -1443709)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_712614.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .