Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.1 L
EMD Value
₹5,140
Closing Date
13 Aug 2020, 4:00 pmClosed
Executive Engineer RnB Division Kulgam
Executive Engineer RnB Division Kulgam
Construction of 1x3 Mtr span culvert in Km 2nd on Redwani Tengen road
2020_PWDJK_101718_2
38/2020-21/RnB/Kul/2188-2208 dated 29-07-2020
Open Tender
Civil Works
Item Rate
25 days
Kulgam
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Executive Engineer RnB Division Kulgam
₹5,140
14 Aug 2020
4 Aug 2020
14 Aug 2020
4 Aug 2020
13 Aug 2020
4 Aug 2020
Amount
Earth work in excavation by mechnical means in foundation trenches, drains pipes and cables etc (not exceeding 1.5 Mtr, in width or 10 Sqm on plan) incld. dressing of sides and ramming of bottoms, lift, upto 1.5 Mtr. Incld. getting out excavated soil and disposal of surplus soil as directed within a lead of 50 Mtr. (In All Kinds of soil ) incld: all carriages leads lifts etc complete. incld: dewatering of foundation trenches/diverting of nallah incld: making of ring bund during execution of work complete
Providing/Laying stone soling Nallah hand packed on level in foundation trenches including loading,unloading and stacking incld: all carriages etc complete.
P/L in position cement conc: of grade excld: the cost of Centering and shuttering. All work upto plinth level. 1:4:8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 20 mm nom: size (crushed). Incld: all carriages complete (OPC Khrew, Ultra - Tech/Ambuja)
Providing/Laying in position reinforced cement conc of specified grade work excld. the Cost of centering , shuttering, finishing, and reinforcement in1:1.5:3 (1¨Cement: 1.5 Course sand: 3 graded stone agg: 20mm size (Crushed) including all carriages etc complete (OPC Khrew, Ultra - Tech/Ambuja)
Upto Plinth Level
P/L in position cement conc: of specified grade excld: the cost of Centering and shuttering. All work upto plinth level.1:2:4 (1 Cement:2 coarse sand: 4 graded stone aggregate 20 mm nom: size (crushed).including all carriages etc complete. (OPC Khrew, Ultra - Tech/Ambuja)
Reinforcement for RCC work incld. Straightening, cutting bending, placing, in position and binding all complete thermo mechanically treated bars.incld: all carriages complete (SAIL/Himalya Platenium)
Centring and shuttering Using ply board incld: strutting , propping etc and removal of form work as directed by Engineer Incharge
Foundation footings ,bases of columns, for mass conc
Wall (Walls any Thickness)
Suspended floors
Edge of Slab
Supplying/filing of RBM filling incld: compaction with vibrator incld all carriages (
M/S HILL TOP ENGINEERS CONSTRUCTION FIRM
BISMILLAH CONSTRUCTION COMPANY
G. K. ENGINEERS CONSTRUCTION FIRM
M/S NEW TAJ CONSTRUCTIONS
M/S ALFALAH CONSTRUCTION COMPANY
stage.html
html • 0.03 MB
finance_193607.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .