Tender Value
₹12.4 L
EMD Value
₹24,701
Closing Date
11 Feb 2026, 5:00 pmClosed
AMA
ZILA PANCHAYAT UNNAO
109. GRAM BARDAHA MEIN OPEN GYM KA NIRMAN KARYA
2026_UPPRD_1110532_1
112/SA.NI/Z.P.UNN/2025-26/109
Open Tender
Civil Works
90 days
ZILA PANCHAYAT UNNAO
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
AMA
₹24,701
10 Mar 2026
30 Jan 2026
13 Feb 2026
30 Jan 2026
11 Feb 2026
30 Jan 2026
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead up to 50 m as per Technical Specification Clause 302.3.
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 M-10 (1:3:6)
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications clauses 600, 1202 & 1203 (1:4)
R.C.C. Work with approved coarse sand and 2 cm (3/4") guage approved stone ballast in proportion 1:1 1/2:3 in lighter beams excluding supply of reinforcement and its binding but including its fixing and winding the same with 24 B.W.G.G.I binding wire and including neccessary centering and shutteing etc. and also including supply of all materials, labour and T&P etc required for proper completion of the work binding wire cost being included in the item.
R.C.C. Work with approved coarse sand and 2 cm (3/4") guage approved stone ballast in proportion 1:1 1/2:3 in lighter beams excluding supply of reinforcement and its binding but including its fixing and winding the same with 24 B.W.G.G.I binding wire and including neccessary centering and shutteing etc. and also including supply of all materials, labour and T&P etc required for proper completion of the work binding wire cost being included in the item.
Supplying, fitting, and placing M.S bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Plastering with Cenent mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification clauses 613.4 & 1204.
Finishing walls with water proof cement paint of approved make and quality on new work with coats to give an even shade, including supply of all materials, labour and T&P etc all complete.
Painting and varnishing on iron work of small areas incuding all complete for proper completion of work etc
Providing and fixing of MS gate including all complete
Installation of GYM Items as per detail attached
Supply & Fixing Of Inauguration Stone.
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.04 MB
BOQ_2050864.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid