Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
17 Aug 2026, 2:45 pm
25 KV Electrification work in connection with Thawe Yard (phase-2) :- A.Provision of 1 stabling lines (700M) B. Provision of 1 running line(750 M) in BSB division of N. E. Railway.
SrDEE-TRD-BSB-2026-27-T09
SrDEE-TRD-BSB-2026-27-T09
Open
Works - General
9 Months
Gopalganj, Bihar
₹0
₹2.8 L
23 Jul 2026
23 Jul 2026
3 Aug 2026
1-Schedule - 1 (SOR Items)
1-Schedule - 2 - Non-Schedule Items (Not available in SOR)
Item Breakup - 1-Schedule - 1 (SOR Items)
SOR Item No.1(a)- Preparation of designs and Per Track drawings for over head equipment KM VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
SOR Item No.8(a) (xii)-Marking/Painting of Each temprature & 'Y' measurement of OHE mast at BWA locations.
SOR Item No.8(b)(i)- Supply without insulater of Each material for termination of Single conductor of Over head equipment or terminating wire.
SOR Item No.8(b)(i)- Erection with insulater of Each material for termination of Single conductor of Over head equipment or terminating wire.
SOR Item No. 9(dz) - Supply of anti-creep with Each cadmium copper catenary wire in polluted area.
SOR Item No. 9(dz) - Erection with insulator of Each anti-creep with cadmium copper catenary wire in polluted area.
SOR Item No.11(a)(i)- Supply without Insulator Each and erection of cut-in (9-Tonne) Insulator.
SOR Item No.11(a)(i)- Erection with Insulator and Each erection of cut-in (9-Tonne) Insulator.
SOR Item No.17 (b)- Extra for special embedment Each of earth electrode.
SOR Item No.31(a)- Transfer of equipment from Each one mast or support to another.(Supply)
SOR Item No.31(a)- Transfer of equipment from Each one mast or support to another.(Erection)
SOR Item No.31(d) - Dismantling of overhead Kilometre equipment.
SOR Item No.31(f)- Splicing & extension of an Each anchored OHE.
SOR Item No.31(gz) - Dismantling of a Section Each Insulator Assembly (Supply)
SOR Item No.31(gz) - Dismantling of a Section Each Insulator Assembly (Erection)
SOR Item No.31(i) - Dismantling of an Isolator
SOR Item No.31(j) - Post/Pedestal Insulator.
SOR Item No.36(a) - Unloading of all type steel MT structure.
SOR Item No.36(b)- Loading of all type steel MT structure.
SOR Item No.37(a) - Unloading of all type of MT Copper & Aluminium conductors.
SOR Item No.37(b) - Loading of all type of Copper MT & Aluminium conductors.
SOR Item No.32.Extra on Erection rate of 8(b) Each (i)for work under power block
SOR Item No.32.Extra on Erection rate of 9(dz) Each for work under power block
SOR Item No.32-Extra on Erection rate of 11(a) Each (i)for work under power block.
SOR Item No.32- Extra on Erection rate of Each 31(a)for work under power block.
SOR Item No.32.Extra on Erection rate of 31(d) Kilometre for work under power block
SOR Item No.32- Extra on Erection rate for 31(f) Each for work under power block.
SOR Item No.32.Extra on Erection rate of 31(gz) Each for work under power block
SOR Item No.32.Extra on Erection rate of 31(i) for Each work under power block
SOR Item No.32.Extra on Erection rate of 31 (j) Each for work under power block Total 157555.00 Item- 2 Section -2 (Concrete) VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY S No. Item Description of Item Unit Qty Rate Amount No
SOR Item No. 2(b)- Concrete for foundation and cum plinth in other than hard and rock soil.(Supply)
SOR Item No. 2(b)- Concrete for foundation and cum plinth in other than hard and rock soil.(Erection) Total 838860.00 Item- 3 Section -3 (Ferrous) S No. Item Description of Item Unit Qty Rate Amount No
SOR item no. 3(b)(i)- Supply of fabricated and MT galvanised structures (O,N & R type portals) with all necessary components other than masts.
SOR item no. 3(b)(i)-Erection of fabricated and MT galvanised structures (O,N & R type portals) with all necessary components other than masts.
SOR item no. 3(b)(ii)-Supply of Structure steel MT (traction masts) fabricated and galvanised of all Type : B - series Mast.
SOR item no. 3(b)(ii)- Erection of Structure steel MT (traction masts) fabricated and galvanised of all Type : B - series Mast.
SOR item no. 3(b)(iii)-Supply of special fabricated MT and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii).
SOR item no. 3(b)(iii)-Erection of special MT fabricated and galvanised steel structures other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii).
SOR item no. 3(c)- Supply only of fabricated steel MT other than masts.
SOR item no. 3(e)(i)- Supply of a Guy Rod Each assembly.
SOR item no. 3(e)(i)- Erection of a Guy Rod Each assembly.
SOR item no. 3(i)- Supply of 25 KV caution board / Each Plates.
SOR item no. 3(i)- Erection of 25 KV caution Each board / Plates.
SOR item no. 4(a)(i)-Supply without insulator of Each single bracket assembly.
SOR item no. 4(a)(i)- Erection with insulator of Each single bracket assembly.
SOR item no. 4(a)(ii)- Extra of 4(a)(i) above, for Each supporting two OHE's (Supply.)
SOR item no. 4(a)(ii)- Extra of 4(a)(i) above, for Each supporting two OHE's (Erection)
SOR item no. 8(a)(v)- Supply of Regulating Each Equipment (3-Pulley type) with counter weight assembly for conventional/ composite OHE.
SOR item no. 8(a)(v)- Erection of Regulating Each Equipment (3-Pulley type) with counter weight assembly for conventional/ composite OHE.
SOR item no. 8(a)(vi) - Supply of Regulating Each Equipment (3-Pulley type) with counter weight assembly for tramway type OHE (Regulated)
SOR item no. 8(a)(vi) - Erection of Regulating Each Equipment (3-Pulley type) with counter weight assembly for tramway type OHE (Regulated)
SOR item no. 8(b)(ii)- Supply without insulator of Each materials for termination of double conductor.
SOR item no. 8(b)(ii)- Erection with insulator of Each materials for termination of double conductor. VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
SOR item no. 16(a)(i)-Supply of structure bond.
SOR item no. 16(a)(i)- Erection of structure bond. Each
SOR item no. 16(b)- Supply of a longitudinal Each bond.
SOR item no. 16(b)- Erection of a longitudinal Each bond.
SOR item no. 16(c)- Supply of a transverse and Each special bond
SOR item no. 16(c)- Erection of a transverse and Each special bond.
SOR item no. 17(a)- Supply of a single earth Each electrode.
SOR item no. 17(a)- Erection of a single earth Each electrode.
SOR item no. 32-Extra on Erection rate of 3(b)(i) MT for work under power block.
SOR item no. 32-Extra on Erection rate of 3(b)(ii) MT for work under power block.
SOR item no. 32-Extra on Erection rate of 3(b)(iii) MT for work under power block.
SOR item no. 32-Extra on Erection rate of 3(e)(i) Each for work under power block.
SOR item no. 32-Extra on Erection rate of 4(a)(i) Each for work under power block.
SOR item no. 32-Extra on Erection rate of 4(a)(ii) Each for work under power block
SOR item no. 32-Extra on Erection rate of 8(a)(v) Each for work under power block.
SOR item no. 32-Extra on Erection rate of 8(a)(vi) Each for work under power block.
SOR item no. 32-Extra on Erection rate of 8(b)(ii) Each for work under power block.
SOR item no. 33(b)-Extra on Erection rate of 3(b) MT (i) for manual steel work.
SOR item no. 33(b)-Extra on Erection rate of 3(b) MT (ii) for manual steel work.
SOR item no. 33(b)-Extra on Erection rate of 3(b) MT (iii) for manual steel work. Total 2901721.50 Item- 4 Section -4 (Non- Ferrous) S No. Item Description of Item Unit Qty Rate Amount No
SOR item no. 5(az)(ii) - Supply of span wire.
SOR item no. 5(az)(ii) - Erection of span wire.
SOR item no. 6(az)-Supply over head equipment Kilometre only.
SOR item no. 6(az)-Erection over head equipment Kilometre only.
SOR item no. 10(az)-Extra on item 6(a) for supply Each of additional fitting at a turn - out, diamond crossing or overlap.
SOR item no. 10(az).-Extra on item 6(a) for Each erection of additional fitting at a turn - out, diamond crossing or overlap.
SOR item no. 12(az).- Supply without insulator of Each a section insulator assembly..
SOR item no. 12(az)- Erection with insulator of a Each section insulator assembly.
SOR item no. 13(a)-Supply without insulator of a Each 25 kv single pole isolator without earth contact assembly. VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
SOR item no. 13(a)- Erection with insulator of a Each 25 kv single pole isolator without earth contact assembly.
SOR item no. 13(d)- Extra for supply of an earth Each contact assembly in an isolator.
SOR item no. 13(d)- Extra for erection of an earth Each contact assembly in an isolator.
SOR item no. 15(a)(i)- Supply of large copper Each jumpers.
SOR item no. 15(a)(i)- Erection of large copper Each jumpers.
SOR item no. 15(a)(ii)- Supply of small copper Each jumpers.
SOR item no. 15(a)(ii)- Erection of small copper Each jumpers.
SOR item no.15(a)(iv)-Supply of a copper jumper Each (5mm dia droper wire).
SOR item no.15(a)(iv)- Erection of a copper Each jumper (5mm dia droper wire).
SOR item no. 15(d)-Supply of materials large Each copper jumper 160 Sq. mm between Aluminium bus and cross feeders
SOR item no. 15(d)- Erection of Large copper Each jumper 160 Sq. mm between Aluminium bus and cross feeders
SOR item no. 26(a)(ii) - Supply of Solid copper Metre bus-bars 18mm.
SOR item no. 26(a)(ii) - Erection of Solid copper Metre bus-bars 18mm.
SOR item no. 26(c)(i) - Supply of solid copper Each bus-bar connectors: Bus terminal (6310)
SOR item no. 26(c)(i) - Erection of solid copper Each bus-bar connectors: Bus terminal (6310)
SOR item no. 26(c)(ii) - Supply of solid copper Each bus-bar connectors: Bus splice (6320)
SOR item no. 26(c)(ii) - Erection of solid copper Each bus-bar connectors: Bus splice (6320)
SOR item no. 26(c)(iii) - Supply of solid copper Each bus-bar connectors: Bus tee joint (6330)
SOR item no. 26(c)(iii) - Erection of solid copper Each bus-bar connectors: Bus tee joint (6330)
SOR item no. 26(c)(iv) - Supply of solid copper Each bus-bar connectors: Bus terminating tee (6351)
SOR item no. 26(c)(iv) - Erection of solid copper Each bus-bar connectors: Bus terminating tee (6351)
SOR item no 32- Extra on Erection rate of 5(az)(ii) Metre for work under power block.
SOR item no 32- Extra on Erection rate of 6(az) Kilometre for work under power block.
SOR item no 32- Extra on Erection rate of 10(az) Each for work under power block.
SOR item no 32- Extra on Erection rate of 12(az) Each for work under power block.
SOR item no 32- Extra on Erection rate of 13(a) Each for work under power block.
SOR item no 32- Extra on Erection rate of 15(a)(i) Each for work under power block.
SOR item no 32- Extra on Erection rate of 15(a) Each (ii) for work under power block
SOR item no 32- Extra on Erection rate of 15(a) Each (iv) for work under power block.
SOR item no 32- Extra on Erection rate of 15(d) Each for work under power block. VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
SOR item no 32- Extra on Erection rate of 26(a) Metre (ii) for work under power block. Total 457371.00 Item- 5 Section 5 (Insulators) S No. Item Description of Item Unit Qty Rate Amount No
SOR item 4(ax)(i)-Supply of Stay Arm Porcelain Each insulator (CD-1050 mm).
SOR item 4(ax)(iv)-Supply of Bracket Porcelain insulator (CD-1050 mm).
SOR item 8(bx)(i)- Supply of Porcelain insulator 9- Each Tonne (CD1050mm)for item 8(b)(i).
SOR item 9(ax)(i) - Supply of 9 Tonne Porcelain Set insulator (CD-1050 mm )
SOR item 11(ax)(i)- Supply of 9-Tonne Porcelain Each (CD-1050 mm)
SOR item 12(ax)(i)- Supply of Porcelain 9-Tonne Set (CD-1050 mm) & Sectioning Insulator
SOR item 13(ax)- Supply of Post & Operating rod Set insulators for item 13 (a). Total 260581.16
Item Breakup - 1-Schedule - 2 - Non-Schedule Items (Not available in SOR)
NS-1-Cutting and masts/portals.
NS-2-Dismantling of released cantilever.
NS-3-Dismantling of Anti-Creep Anchor/BWA
NS-4-Dismantling of existing ATD for modification Each i.e. Eye rod, three pulley and counter weight etc.
NS-5-Dismantling of small parts steel.
NS-6- Construction of traction SWR diagram as Numbers per approved sectioning diagram and ACTM guidelines. The diagram prepared in AUTOCAD and operation rules annexure shall be prepared in Microsoft Word and submitted for approval. After approval, supply 18 set of hard copy of drawing with colouring and operation rules annexure with cover and one tracing, one soft copy in CD shall be submitted. Work shall be done as per scope of work.
NS-7- Fabrication, & supply of traction SWR Numbers diagram boards of size approx 4"x3" or 6"x4" on suitable acrylic/FRP sheets framed in teak wood/metal frame as per approved SWR diagram with colouring as per code of section.
NS-8- Supply of OHE sectioning diagram board of Numbers section.
NS-9- Supply of '' caution clearance to OHE near Numbers by restricted '' size 400x270x2mm as per RDSO specification No. ETI/OHE/33 (8/85) or latest and drawing No. RE/33/436, Rev.C or latest as per scope of work and direction of site-in-charge.
NS-10- Supply of dead section caution board Numbers (power block working limit board) ' size 450x450x2mm, as per RDSO specification No. ETI/OHE/33 (8/85) or latest and as per RDSO drawing No. ETI/OHE/ P/ 7574, Rev.-B or latest as per scope of work and direction of site-incharge. VARANASI DIVISION-ELECTRICAL/NORTH EASTERN RLY
NS-11- Supply of enamel type 'caution unwired Numbers turnout' board size Numbers 10 998.60 9986.00 900x600x2mm as per RDSO specification No. ETI/OHE/33(8/85) or latest & drawing No. ETI/OHE/P/7573, Rev-A or latest as per scope of work and direction of site-in-charge.
NS-12- Supply of Engine stop board size Numbers 900x600x2mm as per RDSO specification No. ETI/OHE/33(8/85) or latest & drawing No. ETI/OHE/P/7572, Rev-B or latest as per scope of work and direction of site-in-charge.
NS-13- Supply of retro reflective sigma board, Numbers size 600x450x2mm as per RDSO Specification No. ETI/OHE/33A (12/97), Rev-8 or latest & drawing No. TI/DRG/OHE/PLTBRD/RDSO/00036/12 or latest as per scope of work and direction of site-in-charge.
NS-14- Provision of Painting & Marking of Numbers implantation, emergency phone socket direction, rail level, Km's number of Structures, OHE height and ATD's temperature marking on ATD structures.
NS-15- Provision of painting of balance weight of Numbers ATD by Aluminium paint (Double Coat) (Rate inclusive of required material cost i.e Paint, brush etc.)
NS-16- Provision of Bond painting &dressing Numbers 1000.00 (Rate inclusive of required material cost i.e Paint, brush etc.)
NS-17- Provision of white washing of Muff (Rate Numbers inclusive of required material cost)
NS-18- Executive Table with Executive Return Numbers unit.
NS-19- In charge Supervisors Table with CPU Numbers Hanger.
NS-20- In charge supervisors -Revolving chair Numbers Mild Black
NS-21- Visitor Chair with Arm.
NS-22- Computer Table.
NS-23- Steel Almirah/Book Case.
Extra on erection rate for NS-1- work under Numbers power block.
Extra on erection rate for NS-2- work under Each power block.
Extra on erection rate for NS-3 work under power Each block.
Extra on erection rate for NS-4 work under power Each block.
Extra on erection rate for NS-5 work under power MT block. Total 491895.63
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocument.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].