Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹91.2 LAdmitted-Finance | -21.99% | ₹91.2 L | L1 | Admitted-Finance |
| 2 | L2₹92.4 L+₹1.2 L (1.36%)Admitted-Finance | -20.93% | ₹92.4 L+₹1.2 L (1.36%) | L2 | Admitted-Finance |
| 3 | L3₹93.5 L+₹2.3 L (2.53%)Admitted-Finance 171 BARAHI MOHALLA MAYA WALI GALI HAPUR HAPUR UTTAR PRADESH 245101 | HAPUR | UTTAR PRADESH | 245101 | -20.02% | ₹93.5 L+₹2.3 L (2.53%) | L3 | Admitted-Finance |
| 4 | L4₹93.5 L+₹2.3 L (2.55%)Admitted-Finance | -20.00% | ₹93.5 L+₹2.3 L (2.55%) | L4 | Admitted-Finance |
| 5 | L5₹93.5 L+₹2.3 L (2.56%)Admitted-Finance AT DHANAUTI MATH DHANAUTI SIWAN | SIWAN | BIHAR | 841226 | -19.99% | ₹93.5 L+₹2.3 L (2.56%) | L5 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
24 Jan 2024, 3:00 pmClosed
Engineer-in-Chief RWD PATNA
Vishweshawaraiya Bhawan 5th floor,Rural Works Department, Bailey Road Patna-800015
MR-N/23-24 Chapra-2/11
2023_ECBIH_130295_1
MR-N/23-24 Chapra-2/11
Open Tender
CIVIL
Percentage
270 days
Chapra
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
EE RWD Works Division,Chapra-2
₹2.3 L
26 Jul 2024
5 Jan 2024
24 Jan 2024
5 Jan 2024
24 Jan 2024
5 Jan 2024
eProcurement System for Pradhan Mantri Gram Sadak Yojana (PMGSY) Created By: Anand Prakash Created Date/Time: 26-Jul-2024 01:51 PM Tender Title: MR-N/23-24 Chapra-2/11 Tender ID: 2023_ECBIH_130295_1
Tender Inviting Authority: Engg-in Chief RWD Patna
Name of Work: MR-N-23-24 - CHAPRA-2 -11
Contract No: Civil Works/
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 Shambhu Kumar Singh (GSTN-10ATEPS7950C1ZW) BID ID -566630 11688190.56 -1.93 11462608.48 One Crore Fourteen Lakh Sixty Two Thousand Six Hundred and Eight
2.00 Rambabu Kumar (GSTN-10AUUPK5408N1ZA) BID ID -567869 11688190.56 0.00 11688190.56 One Crore Sixteen Lakh Eighty Eight Thousand One Hundred and Ninty
3.00 MANOJ THAKUR (GSTN-10AGMPT7533P1ZS) BID ID -567922 11688190.56 -17.17 9681328.24 Ninty Six Lakh Eighty One Thousand Three Hundred and Twenty Eight
4.00 PANKAJ KUMAR(GSTN-NA)--566018 11688190.56 -20.02 9348214.81 Ninty Three Lakh Fourty Eight Thousand Two Hundred and Fourteen
5.00 PALAK INFRATEL PRIVATE LIMITED(GSTN-NA)--567375 11688190.56 -21.99 9117957.46 Ninty One Lakh Seventeen Thousand Nine Hundred and Fifty Seven
6.00 Jitendra Singh(GSTN-NA)--569394 11688190.56 -19.99 9351721.27 Ninty Three Lakh Fifty One Thousand Seven Hundred and Twenty One
7.00 Hmk Infratech Private Limited(GSTN-NA)--567697 11688190.56 -20.00 9350552.45 Ninty Three Lakh Fifty Thousand Five Hundred and Fifty Two
8.00 Arnavi Construction(GSTN-NA)--569649 11688190.56 -20.93 9241852.28 Ninty Two Lakh Fourty One Thousand Eight Hundred and Fifty Two
9.00 RAKESH KUMAR YADAV(GSTN-NA)--568047 11688190.56 -.50 11629749.61 One Crore Sixteen Lakh Twenty Nine Thousand Seven Hundred and Fourty Nine
Lowest Amount Quoted BY: PALAK INFRATEL PRIVATE LIMITED(9117957.46)
BOQ Summary Details Tender Title: MR-N/23-24 Chapra-2/11 Tender ID: 2023_ECBIH_130295_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 PALAK INFRATEL PRIVATE LIMITED 9117957.46 L1
2 Arnavi Construction 9241852.28 L2
3 PANKAJ KUMAR 9348214.81 L3
4 Hmk Infratech Private Limited 9350552.45 L4
5 Jitendra Singh 9351721.27 L5
6 MANOJ THAKUR 9681328.24 L6
7 Shambhu Kumar Singh 11462608.48 L7
8 RAKESH KUMAR YADAV 11629749.61 L8
9 Rambabu Kumar 11688190.56 L9
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_205572.xls
BOQ • 0.31 MB
mbdNEW.pdf
Tender Documents • 9.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .