| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹22.2 L+₹1.2 L (5.74%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹23.4 L+₹2.4 L (11.5%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹23.5 L+₹2.5 L (11.7%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹23.5 L+₹2.5 L (11.8%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | RAJKUMARI L2 | PREM NATH YADAV L10 | SURESH CHANDRA CONTRACTOR L4 | Rakesh kumar L7 | S R CONTRACTORS L5 | M/S A V R BUILDERS L6 | ASHOK KUMAR SINGH L9 | M/s CHANDRA PAL SINGH L3 | M/S SAVERA BUILDCON L1 | SHIVA ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in foundation in dry soil including lift up to 1.50m and lead up to 30m including back filling watering and ramming of excvated earth in to the structure and the sides of foundation trenches or into the plingth with removal and disposal disposal of surplus earth as directed by engineer in charge up to 30 meter lead from the foundation | 27 | CUM | 50 ₹1,350 Lowest | 80 ₹2,160 | 50 ₹1,350 Lowest | 90 ₹2,430 | 80 ₹2,160 | 70 ₹1,890 | 90 ₹2,430 | 50 ₹1,350 Lowest | 68.8 ₹1,857.6 | 100 ₹2,700 |
| 2.00 | Uprooting jhund and moonj disposal away from site | 300 | SQM | 20 ₹6,000 | 5 ₹1,500 Lowest | 20 ₹6,000 | 5 ₹1,500 Lowest | 20 ₹6,000 | 25 ₹7,500 | 32 ₹9,600 | 5 ₹1,500 Lowest | 24.08 ₹7,224 | 35 ₹10,500 |
| 3.00 | Cleaning thick bushes and thorney jungle without uprooting | 600 | SQM | 3 ₹1,800 | 4 ₹2,400 | 2 ₹1,200 | 8 ₹4,800 | 2 ₹1,200 | 3.25 ₹1,950 | 3.5 ₹2,100 | 0.4 ₹240 Lowest | 3.02 ₹1,812 | 4.4 ₹2,640 |
| 4.00 | Providing and Laying C C 1 3 6 in foundation and floor including cost of material labour and T and P | 10.7 | CUM | 4,700 ₹50,290 | 5,926 ₹63,408.2 | 5,000 ₹53,500 | 4,000 ₹42,800 Lowest | 4,500 ₹48,150 | 4,250 ₹45,475 | 5,500 ₹58,850 | 4,200 ₹44,940 | 4,200 ₹44,940 | 5,877.7 ₹62,891.39 |
| 5.00 | RCC precast Boundary compound wall sub prestressed precast boundary wall installation M 25 grade concrete compound wall pillar size 150mm x 150mm with 7 nos 3mm HTC wire and M 25 grade concrete panel size 300mm x 45mm x 2100mm with 4 nos 3 mm HTC Wire and 2 side same finishing M 25 Grade concrete including all materials labour transportation etc | 107 | SQM | 950 ₹1,01,650 | 1,000 ₹1,07,000 | 900 ₹96,300 | 900 ₹96,300 | 950 ₹1,01,650 | 900 ₹96,300 | 900 ₹96,300 | 850 ₹90,950 | 750 ₹80,250 Lowest | 800 ₹85,600 |
| 6.00 | Dismentling brick work or stone work and cement concrete in cement mortar and includind stacking of material with in a distance of 60M as per direction of Engineer in charge | 45 | CUM | 350 ₹15,750 | 400 ₹18,000 | 500 ₹22,500 | 500 ₹22,500 | 590 ₹26,550 | 400 ₹18,000 | 500 ₹22,500 | 300 ₹13,500 Lowest | 356 ₹16,020 | 518 ₹23,310 |
| 7.00 | Ist Class brick work in 1 4 CM including all cost of material labour and Tand P etc complete | 59 | CUM | 4,750 ₹2,80,250 | 5,600 ₹3,30,400 | 5,000 ₹2,95,000 | 5,900 ₹3,48,100 | 5,500 ₹3,24,500 | 4,200 ₹2,47,800 Lowest | 4,700 ₹2,77,300 | 5,200 ₹3,06,800 | 4,200 ₹2,47,800 Lowest | 5,000 ₹2,95,000 |
| 8.00 | Centering and shuttering of of RCC work including all cost of material labour and Tand P | 440 | SQM | 400 ₹1,76,000 | 700 ₹3,08,000 | 300 ₹1,32,000 Lowest | 350 ₹1,54,000 | 500 ₹2,20,000 | 600 ₹2,64,000 | 700 ₹3,08,000 | 350 ₹1,54,000 | 553 ₹2,43,320 | 600 ₹2,64,000 |
| 9.00 | Steel reonforcement including bending Binding Cutting Placing of reinforcement Material Labour and Tand P | 7.1 | MT | 64,000 ₹4,54,400 | 75,332.65 ₹5,34,861.82 | 75,000 ₹5,32,500 | 66,000 ₹4,68,600 | 65,000 ₹4,61,500 | 67,000 ₹4,75,700 | 65,000 ₹4,61,500 | 70,000 ₹4,97,000 | 52,000 ₹3,69,200 Lowest | 62,000 ₹4,40,200 |
| 10.00 | RCC 1 1.5 3 in slab and abutment including all material Labour and T and P etc complete | 82 | CUM | 5,800 ₹4,75,600 | 6,991.15 ₹5,73,274.3 | 6,000 ₹4,92,000 | 6,500 ₹5,33,000 | 6,400 ₹5,24,800 | 5,500 ₹4,51,000 | 7,000 ₹5,74,000 | 6,700 ₹5,49,400 | 5,300 ₹4,34,600 Lowest | 6,500 ₹5,33,000 |
Tender Value
₹30.2 L
EMD Value
₹60,400
Closing Date
10 Sept 2025, 2:00 pmClosed
EE ADGC ALIGARH
EE ADGC ALIGARH
RESTORATION WORK OF BELDAR ROOM AND JILEDARI SIX NARORA ON ANUPSHAHR BRANCH
2025_UPIDC_1070366_13
3542 dt 23.08.2025
Open Tender
Civil Works
Item Rate
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹60,400
19 Nov 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .