Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹17.8 L+₹1.5 L (9.41%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹18.4 L+₹2.1 L (13.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹20.8 L+₹4.5 L (27.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹25.1 L+₹8.8 L (54.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹28.2 L
EMD Value
₹84,510
Closing Date
12 Oct 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONST OF HELIPAD AT JUMAGUND
2026_RDPR_327182_12
NIT NO 129 OF 2026-27 ADF CDF GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
EXECUTIVE ENGINEER REW KUPWARA
₹84,510
14 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
6 Oct 2026 - 6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavtion for foundatiom of tranches | 328.99 | CUM | 479.3 | ₹1,57,684.91 |
| 2 | P/Laying of dry stone soiling duely hand packed | 120.98 | CUM | 1,000 | ₹1,20,980 |
| 3 | Providing and Laying of cement concrete 1:4:8 MIX | 21.58 | CUM | 5,202.9 | ₹1,12,278.58 |
| 4 | Providing and Laying of cement concrete 1:3:6 MIX | 75 | CUM | 5,733.6 | ₹4,30,020 |
| 5 | PULM | 18.75 | CUM | 1,000 | ₹18,750 |
| 6 | CENTERING AND SHUTTERING INCL REMOVAL OF F WORK | 209.1 | SQM | 628.95 | ₹1,31,513.45 |
| 7 | Reinfrced cement concrete work in walls(any thickness )incl attached pilaster ,buttress,plinth nd string courses,fillets columns, pillars,piers, abutments,posts, nd struts upto floor five level incl curring but exculiding cost of shuttering reinforcement 1:1:5:3 mix | 70.75 | cum | 7,788.4 | ₹5,51,029.3 |
| 8 | Steel reinforcement for rcc rcc work incl cutting,,straightening,cutting bending ,placing, in position nd all binding all complete upto plinth level TMT BARS | 9,551 | KG | 123 | ₹11,74,773 |
| 9 | Carriage of material OF STONE AGGREGATES average lead OF 25 km | 148.92 | CUM | 344.49 | ₹51,301.45 |
| 10 | Carriage of material OF FINE AGGREGATES average lead OF 35 km | 76.97 | CUM | 575.54 | ₹44,299.31 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_1106906.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .