Tender Value
₹3.4 Cr
EMD Value
₹3.2 L
Closing Date
24 Dec 2025, 2:00 pmClosed
KZJ-BPQ Proposed Br.No. 6 @ Ch:5606.00m(FCSB) Exg. Main Line Km: 246/19-21 as 1x5.00x3.00m (12 skew) RCC BOX with cast in situ of 34.407m on KK siding lines, precast box of 53.74m on 3rd main line and UP and DN main lines by Air pushing method using RH girder for conveyor belt.
166_N_SC_25_OT~SCR
166_N_SC_25_OT
Open
Works - General
9 Months
Ukhrul, Manipur
₹0
₹3.2 L
24 Dec 2025
28 Nov 2025
10 Dec 2025
A-USSOR 2021 - General Items
B-USSOR 2021 - Concrete Items
C-DSR 2023 General Items
D-USSOR 2021 Cement Items
E-USSOR 2021 Steel Reinforcement Items
Item Breakup - A-USSOR 2021 - General Items
1000.00 or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
2540.00 abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
30.00 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
1200.00 box of all sizes with or without common web section after supporting the track on temporary girders including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Air pushing technique" as per approved drawings/scheme, in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer- in-Charge. Note: (1) The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. (2) The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. (3) Transportation of Temporary Girder to site shall be paid separately under relevant item.. (4) The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
MT- Above 200 km Km
20.00 less than 35 kg each at specified bridge locations.
60.00 Boulders, weighing not less than 35kg each with voids filled with spalls on slopes, laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Specifications (filter media to be paid separately under the relevant item).
20.00 (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in- charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
40.00 return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra.
2000.00 cement polythene bags with Rly. Ballast/moorum/earth/Sand/quarry dust etc. placing the filled bags on the high banks /bridge approaches/nominated place etc. dumping and spreading at the nominated locations to profile under block period with all contractor's labour, tools, plants, loading, unloading, filling, spreading including all lead/lift etc. complete and as directed by the Engineer in charge at site including crossing of track where necessary. Total 6109576.35
Item Breakup - B-USSOR 2021 - Concrete Items
72.00 graded stone aggregate 40 mm nominal size). Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
cum SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
1100.00 machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in-Situ/Pre- cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item.
180.00 batched, machine mixed and machine vibrated Design Mix Cement Concrete, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, of specified grade (cast in-situ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in Drop and curtain wall and alike structures below bed level, complete in all respect as per drawings and technical specifications to the satisfaction of Engineer-in-Charge. Note: Payment for cement, reinforcement and shuttering shall be made extra. Deduct if Plasticiser has not been used in Design Mix Concrete of any grade as per approved mix design or use of 40mm graded stone aggregate in place of 20mm graded stone aggregate in any grade of concrete. Note: Deduction to be made for quantity of concrete.
100.00 aggregate in place of 20mm graded stone aggregate in any grade of concrete. Total 3927629.52
Item Breakup - C-DSR 2023 General Items
Item Breakup - D-USSOR 2021 Cement Items
53 approved brands/makes Total 3635251.98
Item Breakup - E-USSOR 2021 Steel Reinforcement Items
165000.00 Fe-500D or more of approved brands/makes. Total 16214550.00
Item Breakup - F-NS Item
Insertion of temporary girder in place of Each formation involving dismantling of track, removal of ballast and neatly stacking for future use, excavation & installation of CC crib or wooden crib at both ends as per approved design in one or more traffic blocks, excavation for creating space for insertion of girder as required, placement of girder by contractor's Crane, tools & plants, filling of earth/sand filled bags at different stages as required, linking of track and connecting with the approaches, ballasting, boxing and packing approach sleepers to make track fit for 20 kmph to the satisfaction of Engineer in-charge. And removal of temporary girder, crib on both ends and placing temporary girder on crib /cess away from Railway track as directed by engineer at site under traffic block; filling of Railway's earth by ramming, pulling ballast from stack / adjoining track / same track, laying track, linking with approach track and packing of ballast for opening track at 20 SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY kmph speed, boxing & dressing of cess, ballast profiling etc. The work is to be carried out with all contractors, labour, materials, tools, Plant and machinery, etc., including transportation of road crane/machineries to the site of work and making service roads for movement of contractor's machinery to the bridge site along with consumables, fuel, driver batta, insurance, taxes, permit etc. with all lead, lift, loading, unloading including crossing of tracks wherever necessary complete and as directed by the Engineer-in-charge at site with RH /Temporary girder of length above 16.3m and up to 26.80 using Road crane capacity of 150 MT and 200 HP capacity Hitachi. Notes: 1. The CC Cribs as required and Temporary Girder shall be supplied by Railways at available location. 2. Transportation of Temporary Girder and CC cribs to site shall be paid separately under relevant item. 3. The charges for wooden sleepers/blocks required for matting and bearing as per approved design shall be paid extra as per relevant item. 4. In case bridge timber / channel sleepers are required to be laid on girder, the same shall be paid separately under relevant item. 5. If earth is to be brought by contractor from outside, the same will be paid separately 6. The contractor has to keep cranes, trailers, etc., in good working condition and should be in readiness before grant of block. 7. The contractor has to bring cranes at site of work minimum one day in advance and cranes are to be checked for their lifting capacity one day prior to block 8. The work should be carried out under traffic block and power block where applicable. Due to any reasons if traffic block is not granted, no extra payment will be paid. The contractor has to keep his labour, machinery, equipment's etc at the site till the completion of work and as per the instruction of Engineer in charge 9. The contractors are advised to inspect the site for feasibility of deployment of machinery before quoting the rates. 10. Minimum equipment required shall be a). Crawler mounted hydraulic excavator of minimum 200 hp with bucket capacity 2.5 cum, and stone breaker b). Crane of suitable capacity as per requirement at site c. Tripper/ lorry d) gas cutting machine with man power 11. In case blasting is required at site during excavation, the same shall be paid separately under relevant item.
Dismantling of 20.4m RH girder at site MT including loading of all released structural elements, fittings and all loose materials in truck/trailer and re-assembling of 20.4m RH girder including unloading and leading all structural elements within 1 km lead, bolting, riveting or welding as per approved drawing or as directed by Engineer-in- charge. Rate shall include cost of labour, material, tools and plants. NOTE: Payment for transportation of girder to the required site and back will be made seperately under relevant USSOR-2021 item Total 4410937.50
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .