Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹31.3 LAccepted-Finance | ₹31.3 L | 1 | Accepted-Finance being 1st lowest |
| 2 | 2₹33.5 L+₹2.2 L (7.04%)Rejected-Finance | ₹33.5 L+₹2.2 L (7.04%) | 2 | Rejected-Finance being 2nd lowest |
| 3 | 3₹34.9 L+₹3.6 L (11.3%)Rejected-Finance | ₹34.9 L+₹3.6 L (11.3%) | 3 | Rejected-Finance being 3rd lowest |
| 4 | 4₹36.1 L+₹4.8 L (15.2%)Rejected-Finance | ₹36.1 L+₹4.8 L (15.2%) | 4 | Rejected-Finance being 4th lowest |
| 5 | 5₹41.0 L+₹9.7 L (30.9%)Rejected-Finance | ₹41.0 L+₹9.7 L (30.9%) | 5 | Rejected-Finance being 5th lowest |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
6 Apr 2026, 4:00 pmClosed
Executive Engineer Irr Division Udhampur
Executive Engineer Irr Division Udhampur
Permanent restoration Flood sector of damages infrastructure in District Udhampur
2026_IFC_306741_2
E NIT No 22 of 2025-26 dt 25-03-2026
Open Tender
Civil Works - Others
Percentage
120 days
udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Irr Division Udhampur
₹1 L
17 Apr 2026
25 Mar 2026
7 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
25 Mar 2026 - 6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1BINISUNG NALLAH [AT SPOTS] | |||||
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | - | Cum | - | - |
| 1.02 | Hand-packing stones in wire-crates; excluding cost of crates and stones | - | Cum | - | - |
| 1.03 | Supply of stone including loading, unloading and stacking at site excluding carriage | - | Cum | - | - |
| 1.04 | carraige of stone from nearby nallah to site of work for an average distance of 400Mtr by H.L | - | Cum | - | - |
| 1.05 | Providing & Supplly of B.A wire crate at site of size 6x1.5x1.5m, 4"x4" mesh size including loading, unloading, stacking and carraige complete | - | No | - | - |
| 2KASHIRA NALLAH [AT SPOTS] | |||||
| 2.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge | - | Cum | - | - |
| 2.02 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 2.03 | Dumping and Supply of stone including loading, unloading and stacking at site excluding carriage | - | Cum | - | - |
stage.html
html • 0.06 MB
technical_995781.pdf
techsummary_995781.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_995781.xls
BOQ • 0.44 MB
Addendum.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .