Loading…
Loading…
Tender Value
₹17.6 Cr
EMD Value
₹35.1 L
Closing Date
29 Jun 2026, 6:00 pmDue today
Similar tender results from the same govt authority in the past 3 years.
The Add. Chief Engineer PWD Zone Jodhpur II HQ-Bar
The Add. Chief Engineer PWD Zone Jodhpur II HQ-Barmer
Widening of Road NH-68 to Industrial Area DHARAMPURA
2026_CEPWD_566819_1
ACE PWD BMR NIT 01/2026-27
Open Tender
Civil Works
330 days
BARMER
Please refer tender Documents
7 documents required · 7 mandatory
₹5,000
The Executive Engineer PWD Dn. Barmer
₹35.1 L
Yes
The Add. Chief Engineer PWD Zone Jodhpur II HQ-Bar
11 Jun 2026
11 Jun 2026
30 Jun 2026
11 Jun 2026
29 Jun 2026
11 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of reference bench mark (1 No.), working bench mark (4 Nos.) and near all drainage structures and bridges (as per direction of Engineer-in- charge), reference pillar/ burgees @ 50m interval on both side of formation width including marking of centre line, setting out curves, recording of levels, white washing and lettering etc. complete as per MoRTH specifications cl. | 17.5 | Km. | 46,958 | ₹8,21,765 |
| 2 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202 By Mechanical Means Bituminous Courses | 2,496.75 | cum | 69 | ₹1,72,275.75 |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 11.24 | Hect | 10,374 | ₹1,16,603.76 |
| 4 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 1,03,777.09 | Cum | 25 | ₹25,94,427.25 |
| 5 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 15,575.84 | Cum | 45 | ₹7,00,912.8 |
| 6 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 66,003.44 | Cum | 44 | ₹29,04,151.36 |
| 7 | Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | 41,103.95 | Cum | 33 | ₹13,56,430.35 |
| 8 | Granular Sub-Base with Close Graded Material (Table:- 400-1) Plant Mix Method Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means
with a lead of 1 Km. For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri
Ganganagar For Grading-I Material Extra rate for carriage of mixed material additional lead from in item
4.2 and 4.6 Beyond 20th Km | 15,517.62 | Cum | 776.4 | ₹1,20,47,880.17 |
| 9 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km. For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri
Ganganagar Extra rate for carriage of mixed material additional lead from in item
4.2 and 4.6 Beyond 20th Km | 29,027.34 | Cum | 1,047.4 | ₹3,04,03,235.92 |
| 10 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,
complete as per MoRTH Specification Clause 401 For Grading III Material For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri
Ganganagar For Grading III Material | 12,825 | Cum | 407 | ₹52,19,775 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tendernotice_2.pdf
PDF • 0.40 MB
Tendernotice_3.pdf
PDF • 1.71 MB
Tendernotice_4.pdf
PDF • 8.73 MB
Tendernotice_5.pdf
PDF • 3.20 MB
PQ_DHARM.pdf
Tender Documents • 0.54 MB
BOQ_1008380.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid