| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Gurukirpa Contractor L1 |
|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the areacleared. | 50,000 | per sqm | 2 ₹1 L |
| 2.00 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in
Soft/Loose soil | 963.08 | per cum | 98 ₹94,381.84 |
| 3.00 | Hard soil mixed with Kankar / boulders, Morrum | 255.25 | per cum | 102 ₹26,035.50 |
| 4.00 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required | 1,218.33 | per cum | 9 ₹10,964.97 |
| 5.00 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for
Bed | 100 | per sqm | 11 ₹1,100 |
| 6.00 | Side Slope | 570.97 | per sqm | 14 ₹7,993.58 |
| 7.00 | Canal lining with hydraulic compressed pre-cast slab of cement concrete M15 tiles of size 300 x 150 x 40 mm laid over 12 mm (av.) thick subgrade cement plaster in CM (1:6) , 16 mm thick jointing sandwich plaster in CM 1:3 and 6 mm thick jointing mortar in cement mortar (1:3) etc. including curing and all leads& lift of all construction materials complete in all respect
Bed | 100 | per sqm | 675 ₹67,500 |
| 8.00 | Side Slope | 570.97 | per sqm | 714 ₹4.1 L |
| 9.00 | Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. | 670.97 | per sqm | 63 ₹42,271.11 |
| 10.00 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | 6.86 | per cum | 5,450 ₹37,387 |
Tender Value
₹95 L
EMD Value
₹1.9 L
Closing Date
7 Apr 2026, 6:00 pmClosed
Project Director PMU(RWSRPD) and Chief Engineer
Office of the Project Director PMU(RWSRPD) and Chief Engineer Water Resources (North) Hanumangarh
Strengthening /up-gradation of infrastructure of HWMI Bikaner- IEC Lab and Mobilization of Field Visits for Farmers, repair old diggi and misc. items etc,Hydrology and Hydrometeorology Lab, GIS and remote sensing Lab,Providing /Supplying (P-463)
2026_WRDAS_547177_2
PMU_NIB_20_2025-26
Open Tender
Civil Construction Goods
90 days
Bikaner
As per bid documents
2 documents required · 2 mandatory
₹1,000
Executive Engineer Water Resource Division
₹1.9 L
Yes
Hanumangarh
13 Apr 2026
19 Mar 2026
8 Apr 2026
19 Mar 2026
7 Apr 2026
19 Mar 2026
19 Mar 2026 - 25 Mar 2026
25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the areacleared. | |||||
| 2Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in Soft/Loose soil | |||||
| 3Hard soil mixed with Kankar / boulders, Morrum | |||||
| 4Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required | |||||
| 5Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for Bed | |||||
| 6Side Slope | |||||
| 7Canal lining with hydraulic compressed pre-cast slab of cement concrete M15 tiles of size 300 x 150 x 40 mm laid over 12 mm (av.) thick subgrade cement plaster in CM (1:6) , 16 mm thick jointing sandwich plaster in CM 1:3 and 6 mm thick jointing mortar in cement mortar (1:3) etc. including curing and all leads& lift of all construction materials complete in all respect Bed | |||||
| 8Side Slope | |||||
| 9Supplying, laying & spreading of LDPE film of 250 micron on bed and sides including jointing etc. complete as per specifications including cost of LDPE film, overlapping, adhesive tape etc. with transportation charges upto work site complete. | |||||
| 10Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm | |||||
stage.html
html • 0.03 MB
technical_975680.pdf
techsummary_975680.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BidP463V1FINAL.pdf
Tender Documents • 3.66 MB
BOQ_975680.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid