Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹300.02 (0.20%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹1.5 L
EMD Value
₹4,500
Closing Date
17 Jul 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O LINK ROAD SUHANA FISH POINT TO LAND OF NISAR AHMED RAINA BLOCK KPORA
2026_RDPR_315376_32
ENIT58of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹4,500
20 Jul 2026
10 Jul 2026
18 Jul 2026
10 Jul 2026
17 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | EARTH WORK IN EXCAVATION BY MECHNICAL MEANS IN TRENCHES FOR FOUNDATIONS DRAINS PIPES CABLES ETC NOT EXCEEDING 1.5M WIDTH AND FOR SHAFTS WELLS CESSPITS AND THE LIKE NOT EXCEEDING 10SQM ON PLAN I/C DRESSING COMPLETE JOB | 22.7 | CUM | - | - |
| 0.0 | P/L OF STONE SOLING HAND PACKED INCL WATERING DRESSING AND RAMMING WITH ALL CARRIAGES LOADIND AND UNLOADING | 0.57 | CUM | - | - |
| 0.0 | P/L OF CEMENT CONCRETE 1:2:4 MIX WITH 20MM NS WITH ALL CARRIAGES AND LOADING AND UNLOADING AND STACKING COMPLETE JOB | 8.07 | CUM | - | - |
| 0.0 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.7 | CUM | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: for ABUTS | 15.89 | SQM | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for: for SLAB | 10.87 | SQM | - | - |
| 0.0 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level TMT | 165.8 | KG | - | - |
| 0.0 | P/L nallah muck fililing invcl dewatering,ramming,carriages etc complete | 4.08 | CUM | - | - |
| 0.0 | Supplying/stacking/laying nallah muck/rbm over road surface i/c carriage of 10 kms | 17.01 | CUM | - | - |
| 0.0 | CARRIAGE OF ALL MATERIAL I.E SAND/BAJRI CEMENT I/C CARRIAGE LEAD OF 20 KMS | 36.2 | CUM | 1 | ₹36.16 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1022769.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .