Tender Value
₹35.8 L
EMD Value
₹3.6 L
Closing Date
29 Sept 2026, 12:00 pm6d left
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
Janpad Siddharthnagar Me Uska Sohas Marg Ke KM 3 se Bhaluha Sampark Marg Par 3X2X2 m Span Ka RCC Box culvert ka Nirman Karya
2026_CEUBZ_1186799_2
5097/4E-NIVIDA-BASTI CIRCLE/2026 DATED-07-09-2026
Open Tender
Civil Works - Bridges
Percentage
150 days
BASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹3.6 L
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
29 Sept 2026
17 Sept 2026
29 Sept 2026
17 Sept 2026
29 Sept 2026
17 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box Culvert work: Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(lead 1 km) Complete in all aspects (Rates are Excluding GST but Including of all other taxes, Labour Cess, Labour and T&P etc.) | 200 | Cum | 99 | ₹19,800 |
| 2 | Plain/Reinforced Cement Concrete M-15 grade in Open Foundation complete as per Drawing and Technical Specifications with curing. Complete in all aspects (Rates are Excluding GST but Including of all other taxes, Royalty, Material, Labour Cess, Labour and T&P etc.) | 25 | Cum | 9,668 | ₹2,41,700 |
| 3 | RCC Grade M25 using batching plant transit mixer & manual placing with curing. Complete in all aspects(Rates are Excluding GST but Including of all other taxes, Royalty, Material, Labour Cess, Labour and T&P etc.) | 120 | Cum | 10,557 | ₹12,66,840 |
| 4 | M-30 Reinforced Cement Concrete in box culvert complete as per Drawing and Technical Specification with curing. Complete in all aspects (Rates are Excluding GST but Including of all other taxes, Royalty, Material, Labour Cess, Labour and T&P etc.) | 7 | Cum | 10,594 | ₹74,158 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. Complete in all aspects (Rates are Excluding GST but Including of all other taxes, Material, Labour Cess, Labour and T&P etc.) | 12 | MT | 67,723 | ₹8,12,676 |
| 6 | PCC Grade M20 using batching plant transit mixer & manual placing with curing. Complete in all aspects (Rates are Excluding GST but Including of all other taxes, Royalty, Material, Labour Cess, Labour and T&P etc.) | 20 | Cum | 10,131 | ₹2,02,620 |
| 7 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications Complete in all aspects (Rate are Excluding GST but Including of all other taxes, Material, Labour Cess, Labour and T&P etc.) | 60 | Nos | 140 | ₹8,400 |
| 8 | Lettering & Painting of RCC Box Culvert.Complete in all aspects (Rate are Excluding GST but Including of all other taxes,Material, Labour Cess, Labour and T&P etc.) | 1 | Job | 940 | ₹940 |
| 9 | Protection work: Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Complete in all aspects (Rate are Excluding GST but Including of all other taxes, Royalty, Material, Labour Cess, Labour and T&P etc.) | 10 | Cum | 4,644 | ₹46,440 |
| 10 | Stone boulder pitching in apron including cost of materials, Labour T&P etc required proper complition of work. Complete in all aspects (Rate are Excluding GST but Including of all other taxes, Royalty, Material, Labour Cess, Labour and T&P etc.) | 55 | Cum | 5,326 | ₹2,92,930 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
2.pdf
Tender Documents • 3.03 MB
BOQ_2234066.xls
BOQ • 0.40 MB
50971.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .