Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹10.1 L+₹1.4 L (15.5%)Rejected-Finance | L2 | Rejected-Finance Higher than Lowest | |
| 3 | L2₹10.1 L+₹1.4 L (15.5%)Rejected-Finance | L2 | Rejected-Finance Higher than Lowest | |
| 4 | L3₹11.0 L+₹2.3 L (25.8%)Rejected-Finance | L3 | Rejected-Finance Higher than Lowest | |
| 5 | L4₹11.5 L+₹2.8 L (31.4%)Rejected-Finance | L4 | Rejected-Finance Higher than Lowest |
Tender Value
₹15.0 L
EMD Value
₹15,000
Closing Date
12 Oct 2026, 12:00 pmClosed
Divisional Engineer(H),C and M,Vridhachalam
Office of the Divisional Engineer(H),Construction and Maintenance,Vridhachalam
Maintenance works for the Government Roads of Vridhachalam (H) C and M Sub Division upto March 2027
2026_HWAY_706152_1
TN.No.03/2026-27/DO/15.09.2026
Open Tender
Civil Works
Percentage
180 days
Vridhachalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
Yes
13 Oct 2026
24 Sept 2026
12 Oct 2026
24 Sept 2026
12 Oct 2026
24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm and 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | |||||
| 1.1 | Road C | 20 | Cubic metre | 2,693.15 | ₹53,863 |
| 2Collection and Supply of 13.20mm IRC size HBG metal from approved Quarry including cost and conveyance and stacking at Veppur Section store to departmental gauge for premeasurement as directed by departmental officer etc., | |||||
| - | Road A | 30 | Cubic metre | 2,243.72 | ₹67,311.6 |
| - | Road B | 20 | Cubic metre | 2,243.72 | ₹44,874.4 |
| - | Road C | 20 | Cubic metre | 2,243.72 | ₹44,874.4 |
| 3Collection and Supply of 12.00mm IRC size HBG metal from approved Quarry including cost and conveyance and stacking at Veppur Section store to departmental gauge for premeasurement as directed by departmental officer etc., | |||||
| - | Road A | 25 | Cubic metre | 1,926.22 | ₹48,155.5 |
| - | Road B | 20 | Cubic metre | 1,926.22 | ₹38,524.4 |
| - | Road C | 30 | Cubic metre | 1,926.22 | ₹57,786.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_848727.xls
BOQ • 0.37 MB
BidDocumentVDM.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .