Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.6 LAccepted-Finance 11 3 SAINT KABIR NAGAR UJJAIN M P | UJJAIN | MADHYA PRADESH | 456001 | L1 | Accepted-Finance L1 Bidder | |
| 2 | L2₹49.9 L+₹1.3 L (2.72%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹57.4 L+₹8.7 L (18.0%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹73.1 L
EMD Value
₹73,138
Closing Date
6 Apr 2026, 5:30 pmClosed
Executive Engineer PHED Ujjain
Executive Engineer PHED Ujjain
Revised work of Design, Construction and Retrofitting of Piped Water Supply Scheme under Jal Jeevan Mission at Village - 1. Piplu andKamanpura Block Badnagar Distt. Ujjain
2026_PHED_493609_1
NIT No 41/72025-26/PHED/EE/Water Supply Scheme Block Badnagar
Open Tender
Civil Works - Water Works
Percentage
90 days
Badnagar
Please Refer Tender Document
8 documents required · 8 mandatory
₹10,000
₹73,138
10 Apr 2026
24 Mar 2026
8 Apr 2026
25 Mar 2026
6 Apr 2026
26 Mar 2026
25 Mar 2026 - 25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Cement Concrete Pavment by mechanical means using pneumatic tools, cutter breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. PHE USOR. Item.no.16.15.3-P.no.209 | 10 | Cum | - | - |
| 2 | Earth work in Excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be leveled and neatly dressed. All Kind of Soil. PHE USOR. Item.no. 16.4 -P.no.207 | 75 | Cum | - | - |
| 3 | Earth work in Excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be leveled and neatly dressed.In ordinary or Soft rock with or without blasting or bituminous pavement / cement concrete road. PHE USOR. Item.no. 16.3 -P.no.207 | 45 | Cum | - | - |
| 4 | Providing, Laying, Jointing & field testing of PE pipes made from 100% virgin material (Earlier know as HighDensity Polyethylene pipes, PE 100 ) confirming to IS 4984/l4l5l/12786/13488 with necessary jointing material like mechanical connector of jointing pipes by heating to the ends of pipes with the help of Tellon coated electric mirror/ heater to the required temperature and then mechanically pressing the ends together against each other to form a monolithic & leak proof joint by thermosetting process. It may be required to be done with Jack/Hydraulic Jacks/ Butt fusion machine. (50 mm & above fusion jointed &below 50mm mechanical iointed) ) 90mm dia HDPE 6 Kg/cm² PHE USOR ammend 6th dt. 07.01.2022.Item.no. 9.1 -P.no.9 | 3,500 | Mtr | - | - |
| 5 | Providing, Laying, Jointing & field testing of PE pipes made from 100% virgin material (Earlier know as HighDensity Polyethylene pipes, PE 100 ) confirming to IS 4984/l4l5l/12786/13488 with necessary jointing material like mechanical connector of jointing pipes by heating to the ends of pipes with the help of Tellon coated electric mirror/ heater to the required temperature and then mechanically pressing the ends together against each other to form a monolithic & leak proof joint by thermosetting process. It may be required to be done with Jack/Hydraulic Jacks/ Butt fusion machine. (50 mm & above fusion jointed &below 50mm mechanical iointed) 110 mm dia HDPE 6 Kg/cm² PHE USOR mmend 6th dt. 07.01.2022..Item.no. 9.1 -P.no.9 | 1,500 | Mtr | - | - |
| 6 | Providing, Laying, Jointing & field testing of PE pipes made from 100% virgin material (Earlier know as HighDensity Polyethylene pipes, PE 100 ) confirming to IS 4984/l4l5l/12786/13488 with necessary jointing material like mechanical connector of jointing pipes by heating to the ends of pipes with the help of Tellon coated electric mirror/ heater to the required temperature and then mechanically pressing the ends together against each other to form a monolithic & leak proof joint by thermosetting process. It may be required to be done with Jack/Hydraulic Jacks/ Butt fusion machine. (50 mm & above fusion jointed &below 50mm mechanical iointed) 90 mm dia HDPE 10 Kg/cm² PHE SOR mmend 6th dt. 07.01.2022..Item.no. 9.1 -P.no.9 | 600 | Mtr | - | - |
| 7 | Installation of HDPE pipe by Horizontal Direction Drilling Method including preparing and setting up the plant and equipment , making string of new pipe material, installing new pipe string and making the system ready for commissioning by HDD operation including drilling, stringing,reaming and pulling back the new pipe on the designed bore path alignment , proper disposal of drilling fluid, as per code of practice for horizontal direction drilling technique suiting Indian conditions. Required pipes/specials and other civil work shall be paid separately - In all types of soils. HDPE pipes of any class 90 mm outer dia.(PHE USOR No 16.3 page 207) | 1,900 | Mtr | - | - |
| 8 | Installation of HDPE pipe by Horizontal Direction Drilling Method including preparing and setting up the plant and equipment , making string of new pipe material, installing new pipe string and making the system ready for commissioning by HDD operation including drilling, stringing,reaming and pulling back the new pipe on the designed bore path alignment , proper disposal of drilling fluid, as per code of practice for horizontal direction drilling technique suiting Indian conditions. Required pipes/specials and other civil work shall be paid separately - In all types of soils. HDPE pipes of any class 110 mm outer dia.(PHE USOR No 16.3 page 207) | 200 | Mtr | - | - |
| 9 | Providing and laying including testing HDPE Bend 90º confirming to IS specifications. 90 mm - 6 Kg / cm² PHE USOR mmend 6th dt. 07.01.2022..Item.no.9.2 -P.no.9 | 8 | Each | - | - |
| 10 | Providing and laying including testing HDPE Bend 90º confirming to IS specifications. 110 mm - 6 Kg / cm² HE USOR mmend 6th dt. 07.01.2022..Item.no.9.2 -P.no.9 | 9 | Each | - | - |
stage.html
html • 0.05 MB
technical_585852.pdf
techsummary_585852.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 0.19 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
Dnit.pdf
Tender Documents • 2.23 MB
BOQ_585852.xls
BOQ • 0.33 MB
Nit4000.pdf
PDF • 1.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .