Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹2.0 L (1.17%)Rejected-Finance | ₹1.8 Cr+₹2.0 L (1.17%) | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹1.7 Cr
EMD Value
₹1.8 L
Closing Date
27 Oct 2023, 3:00 pmClosed
Project Director, DRDA, Sivagangai
DRDA, Sivagangai
Strengthening and Five year Maintenance of A.Thekkur - N.Pudur road to Vanjinipatti road in Thiruppathur Block of Sivagangai District under NABARD - RIDF - XXIX - 2023-24
2023_RDTN_378469_1
NABARD_XXIX_TPR_Pack_5
Open Tender
Civil Works - Roads
Item Rate
180 days
Sivagangai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.8 L
22 Dec 2023
12 Oct 2023
27 Oct 2023
12 Oct 2023
27 Oct 2023
12 Oct 2023
Amount
Strengthening Of the Road from A.Thekkur - s.Pudur road to Vanjinipatti road 0/0-2/3
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed javall respect as per 51 17 (2)
Picking the existing surface to 50mm to 100mm thick including labour and hire charges for picking tools and plants and all other incidental charges etc complete as per standard specifications.
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff 3 black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc. complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc. complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SSI for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS 1. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Provid and laying of Bituminous Macadam with hot mix plant using crushed aggregate of grading with bituminous binder, transported to site upto a lead of laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per technical specification
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and moxing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of 1.50m Span Deck Slab Culvert @ 5m 265m,375m,865m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all
Collection and filling of river M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Cement Concrete 1:2:4mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Reinforced Cement Concrete 1.1 1/2.3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance g of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 A for cutting side drain
Construction of 1.50m Span Deck Slab Culvert @ 1910m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all
Collection and filling of river M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Cement Concrete 1:2:4mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Reinforced Cement Concrete 1.1 1/2.3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance g of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 A for cutting side drain
Construction of 1.50m Span Deck Slab Culvert @ 2130m
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 208 including all
Collection and filling of river M.sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation
Providing Concrete for plain/reinforced concrete (1:4:8)in open foundations complete as per drawings and technical specification clause 802,803,1202&1203
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc.. complete.
Supplying and fabricating and placing inposition mild steel or Ribbed Tor steel for all reinforcedCement Concrete works as per the design given including cost of steel and binding wire in all floor etc., complete complying with std specification. The bind
Cement Concrete 1:2:4mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance of all materials to site for Deck Slab
Reinforced Cement Concrete 1.1 1/2.3 mix using 20mm ISS size hard granite broken metal from appd.quarry including cost and conveyance g of all materials to site for Deck Slab
collection and supply of gritty Gravel from approved quarry including cost and conveyance of gravel etc complete complying with std specification and as directed by the dept.officer
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 A for cutting side drain
provision for hectameter stone of size0.75mmx0.15mx0.10m
provision for kilometer stone of size1.65mmx0.35mx0.25m
road making
providing road furnitures
provision for NAME BOARD
PHOTO CHARGES
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under NABARD including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
G AROCKIASAMY CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .