Loading…
Loading…
Tender Value
₹15.0 L
EMD Value
₹1.3 L
Closing Date
31 Aug 2026, 3:00 pm3d left
Chief Engineer
Nagar Nigam Firozabad
Construction of RCC drain and CC road from Imran house to Jaikishan house in Ward No. 62, Moh. Hasmat Nagar.
2026_DOLBU_1178365_41
10/Nirman/2026-27
Open Tender
Civil Works
Percentage
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,534
Municipal Corporation
₹1.3 L
22 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
31 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth filling work with 10km cartage ............... .............. including all complete. | 294 | cum | 374 | ₹1,09,956 |
| 3 | Grandular Sub-base with well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis) | 67.2 | cum | 3,234 | ₹2,17,324.8 |
| 4 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 ) | 14 | cum | 8,100 | ₹1,13,400 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23 chapter-5, Item No. 5.3) | 16.8 | Cum | 8,300 | ₹1,39,440 |
| 6 | CEMENT CONCRETE PAVEMENT(C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in ...........Technical Specification Clause 1501 (approved Quarri grit) (PWD SOR 2022-23, Chepter-20, SI N0 23 Item No New Item) | 67.2 | cum | 7,700 | ₹5,17,440 |
| 7 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 ) | 0.24 | Cum | 7,650 | ₹1,836 |
| 8 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the supply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. .(As per Analysis) | 19.49 | Qtl | 7,800 | ₹1,52,022 |
| 9 | M.S Speciefication Board including painting & writing | 1 | job | 4,635 | ₹4,635 |
| 10 | P/F of Inogration Granite stone including writing and | 1 | job | 10,980 | ₹10,980 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.22 MB
BOQ_2216007.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].