| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.5 LAdmitted-Finance | -3.51% | ₹58.5 L | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 3 | Not Admitted-Fee/PreQual/Technical 1 SADHANA SOCIETY DEV BAUG DEVBAUG BHAVNAGAR GUJARAT 364001 | BHAVNAGAR | GUJARAT | 364001 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| Sl No | Description | Qty | Unit | TILU CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for spreading of available 20 to 63 mm nominal size hand/ crusher broken stone aggregates in uniform layer of 100 mm thickness in yard of any substations (charged/ uncharged GSS) with manual / Mechanical means, as permitted by engineer In charge with due care, as per safety norms of substations, complete in all respect with all lead and lift. (Payment shall be done as per stack measurement, after deduction of voids, as per norms). | 150 | Cum | 580 ₹87,000 Lowest |
| 2.00 | Labour charges for collecting existing gravel from charged yard during day hours with the help of wooden basket, screening the same and stacking as per standard specification of screened gravel/ rubbish received after screening. The cost of work includes spreading the screened gravel in 100mm thick layer with due care against any accident. The work is to be done as per direction of Engineer in charge. | 348 | Cum | 180 ₹62,640 Lowest |
Tender Value
₹72.7 L
EMD Value
₹1.5 L
Closing Date
5 Aug 2026, 5:00 pmClosed
SE Civil RRVPNL Bikaner
66 KV GSS Sangalpura , Jaipur road , Bikaner
Construction of cooling bank foundation and misc civil works for 160 MVA Tr At 220 KV GSS Ratangarh
2026_RRVPN_578605_2
NIT 09 (2026-27) SE CIVIL BIKANER
Open Tender
Civil Works
Percentage
180 days
220 KV GSS Ratangarh
As per Agreement
2 documents required · 2 mandatory
₹2,950
AO( T and C) RRVPNL
₹1.5 L
Yes
8 Aug 2026
31 Jul 2026
6 Aug 2026
31 Jul 2026
5 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils B/1.8 | 37 | P.Cum | 178 | ₹6,586 |
| 2 | Providing and laying in position cement concrete including
curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).( B- 3.1.6 ) | 3 | P.Cum | 3,962 | ₹11,886 |
| 3 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix B/4.1 | 16 | P.Cum | 5,921 | ₹94,736 |
| 4 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. ( B / 4.9 ) | 92 | P.Sqm | 173 | ₹15,916 |
| 5 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. Thermo-mechanically Treated bars (Conforming of relevent IS code)
( B/4.13.3 ) | 1,005 | P.Kg. | 82 | ₹82,410 |
| 6 | Earth work in surface excavation not exceeding 30cm. in depth but exceeding 1.5 meter in width as well as10 Sqm on plan including disposal of excavated earth up to 50 Mtr. and lift up to 1.5 Mtr. disposed soil to be levelled and neatly dressed: All kinds of soil
B/1.1 | 5,465 | sqm | 35 | ₹1,91,275 |
| 7 | B-/11.38.1 Providing and laying of paver block as per IS 15658 : 2006 (Indian standard for precast concrete block for pavingspecification) and IRC : SP:63-2004 (guidelines for the use of interlocking concrete block pavement) M-30, 60 mm thick to be used in non traffic areas like building premises, monument premises, land scapes, public gardens/ park, domestic drives, paths and patios, Embankment slopes, sand stabilization Area etc.( As per table 1 of IS 15658:2006 (A) Category A Denated units to key into each other on four faces zigzag shape as per IRC SP 63:2004 | 5,465 | Sqm. | 898 | ₹49,07,570 |
| 8 | Chapter G-3 , Stone Aggregate (Single size) : 40 mm nominal size G 4.1 Add extra for lead of 70 km from lodhsar quarry (1109+271+400) | 150 | Cum | 1,780 | ₹2,67,000 |
| 9 | Repairs to plaster of thickness 12mm to 20mm in patches of area 2.5
sq. metres and under including cutting the patch in proper shape,
raking out joints and preparing and plastering the surface of the walls
complete including disposal of rubbish to the dumping ground within
50 m lead : With cement mortar 1 :4 ( 1 cement : 4 coarse sand) (B/13.1 ) | 376 | P Sqm | 259 | ₹97,384 |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting (height upto 10 m) , fixing in position and applying a priming coat of approved steel primer all complete: B/9.2 | 810 | P.Kg. | 93 | ₹75,330 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
biddocwithnewagreement.pdf
Tender Documents • 2.34 MB
BOQ_1028277.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .