Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | L1 | Accepted-AOC LOWEST RATE FOUND | |
| 2 | L2₹20.0 L+₹5,418.33 (0.27%)Rejected-AOC | L2 | Rejected-AOC SECOND LOWEST RATE FOUND |
Tender Value
₹23.7 L
EMD Value
₹48,000
Closing Date
20 Feb 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex.Ex.R.E.D. Vikas Bhawan Mau
Ex.Ex.R.E.D. Vikas Bhawan Mau
Vikas Khand Mohammadabad Gohna ke Gram Sabha Pitokhar Malav me Racchan Singh ke Ghar se Babhanpura Sarhad Tak Interlocking Nirman Karya.
2026_REDUP_1115239_1
1746dt20.01.2026
Open Tender
Civil Works
Percentage
90 days
MAU
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,104
₹48,000
19 Mar 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
20 Feb 2026
12 Feb 2026
Dismantling of brick on edge soling including all as per required.
Earth work in cutting or embankment in ordinary soil excavation to be in form of regular pits not exceeding 0.50 metre depth and earth work in embankment to be in 20Cm (8") layers including ramming and dresing the surface to required level and slope but soil taken from 1 Km cartage & as per SI. No 253+231(a)
Brick on edge soling with S.O.B. bricks and dry including prepration of subgrade prescribed camber including supply of bricks , filling joints with local earth spreading a blinding coat of 1 cm depth of local earth over the intire surface including labour, T&P etc for proper completion of the work as per SI. N0. 785 (Only Labour Rate)
Excavation in foundation in ordinary soil (Loam clay, or sand ) including lift upto 1.5 m & lift up to 30.0 Mtr & including filling,watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundataion trenches or in to the plinth and removal & disposal of surplus earth as directed by the Engineer- In-Charge up to a distance of 30.0 Mtr from the foundation trenches as per SI. N0. 251.
Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement in proportion of 12:6:1 in foundation and under floors, including supply of all materials, labour and T&P etc. required for proper completion of the work.as per SI. N0. 273
First class brick work in 1:4 cement and coarse sand above 2.25 F.M. mortar in foundation and plinth including supply of all materials,labour and t&p etc required for proper completion of the work. as per SI. N0. 305(B).
Providing and laying of Rubber moulded reflective Zig Zag Interlocking Concrete Block Pavement having Thickness 80mm as per drawing snd technical specification Clause 1504
12 mm thick plaster over brick work with cement mortar consisting of one part cement & four parts of fine sand of 1.25 F.M. including supply of all material,labour and T&P etc required for proper completion of the work as per SI NO 584
2.5 cm thick 1:2:4 plain cement cement concrete floor with cement,approved coarse sand and 2 cm. gauge approved graded stone laid in panels finished with 3 mm floating coat of neat cement including supply of all material,labour and T&P etc required for proper completion of the workas per SI. N0.601(b) .
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
pitokhar.pdf
Tender Documents • 1.54 MB
BOQ_2068997.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .