Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-AOC 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.9 L+₹4.9 L (19.6%)Rejected-Finance G 58 KIRAN GARDEN UTTAM NAGAR NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹34.9 L+₹9.9 L (39.6%)Rejected-Finance N A | L3 | Rejected-Finance Other than L1 |
Tender Value
₹50 L
EMD Value
₹1 L
Closing Date
28 Dec 2024, 6:00 pmClosed
CWE
HQ CWE NO 2 DELHI CANTT-10
COMPREHENSIVE MAINTENANCE INCLUDING REPLACEMENT OF PARTS OF FIRE DETECTION AND ALARM SYSTEM INSTALLED AT MBC RESTRICTED AREA UNDER GE SOUTH WEST NEW DELHI
2024_MES_687527_1
CWE/SW/TOKEN-21/2024-25
Limited
Electrical and Maintenance Works
Item Rate
RESTRICTED AREA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE SOUTH WEST NEW DELHI
₹1 L
27 Jan 2025
7 Dec 2024
30 Dec 2024
7 Dec 2024
28 Dec 2024
21 Dec 2024
Amount
Comprehensive maintenance, checking, servicing, preventive/periodical, routine & corrective (Break down) maintenance, cleaning, inspection, testing and operation in and including repair/ replacement of defective components /parts /accessories/devices of UL listed devices/control wiring harness all as specified below and as directed, of microprocessor based Fire Detection and Alarm system installed in the Main Building Complex D,E & F Block, Auditorium, Main Reception, New CRF including all Basements at Cabinet Sectt through M/S Kooper Fire and Safety (OEM) or authorized dealer of OEM (as per MOU) round the clock including Saturday, Sunday & Holidays by deploying minimum 01 Nos of trained and qualified manpower of OEM or authorized dealer of OEM. Details of Equipment & devices to be operated is as under : - (i) Microprocessor based Fire Alarm control panels Make: Kooper- 05 Nos (NBC -04 Nos and CRF -01 No) (ii) Fire Alarm repeater panels- 5 Nos (iii) Fire fighting Central communication telephone jack panel - 01 No (iv) Jack plate with telephone hand set unit - 48 Nos (v) LED multisensor optical smoke/heat/beam detectors - 2237 Nos (vi) Control/monitor Modules - 04 Nos (vii) Manual call point/pull station - 105 Nos (viii) Response Indicators - 460 Nos (ix) Unidirectional condenser microphone powered by amplifier - 209 Nos (x) PA system for announcing with pageing matrix and multitop speakers - 78 Nos (xi) Sounder cum strobe / hooters - 60 Nos (xii) Fire Exit doors and panel bars - 10 Nos
(xiii) Battery Bank with batteries, 24 Volt - 16 Nos (xiv) Master Amplifier controler - 01 No (xv) Amplifier 480 Watt - 04 No (xvi) Wall/ceiling mounted speeker - 310 (xvii)Telephone handset with telephone jack - 44 Nos (xviii) Emergency fire fighting Telephone panel - 01 No (xix) Siren - 03 Nos (xxi) Beam Detactor - 04 Nos (xxi) All connecting/control wiring for above devices Special Note: (a) All those items related with Fire detection & Alarm system installed at site but not specified in the above list are also included in the comprehensive maintenance.
(b) The contractor shall visit site and inspect complete Fire detection & Alarm system alongwith PA system including all connected devices before quoting the tender. No representation/claim will be accepted against Fire detection & Alarm system alongwith PA system including all connected devices during execution of work at site. (c) Cost of Inspection by respective state agency and retifiaction of defacts including materials deemed to be including in quoted rate by the contractor.
NOTES: -
Any fault warning recorded under system, the operation should be recorded in the logbook and should be intimated to concern JE or EIC as well as contractor and contractor should confirm that fault is attended within reasonable time as directed by EIC otherwise a sum of Rs. 500/- per hour shall be deducted from the contractor dues on account of retification of fault.
MOU between OEM (M/S Kooper) or or authorized dealer and the contractor will be obtained and submitted to Accepting officer for his approval before commencement of the work at site.
Comprehensive maintenance, checking, servicing, preventive/periodical, routine & corrective (Break down) maintenance, cleaning, inspection and testing in and including repair/ replacement of defective components /parts /accessories/devices of UL listed/control wiring harness will be done by the authorised peronnel of OEM and rate of above deemed to be including in quoted rate by the contractor..
Regular Maintenance of the system: The contractor must maintain the system as per the maintenance activities mentioned below and responsible for 100% functional of the fire detection and alarm system including the PA system supporting the fire alarm system.
System component will be cleaned, recalibrate and retested if necessary to ensure continued performance and reduce the risk of component or system failure.
Replacement of any devices/accessories/parts should be original components manufactured by the OEM or other compatible components are used in order to preserve Underwriters Laboratories (U.L.) Listings and meet NFPA requirements
Contractor shall be solely responsible to keep the system serviceable at all the time and provide sufficient technicians / manpower round the clock including Sunday & Holiday tem and condition apply.
Any fault indicated in system and replacement of any devices/accessories/control wiring harness should be recorded in the logbook and produce with running/final bills.
All relevant Tool & plant and stationery such as Attendance Register, Periodical Maintenance Register, log book etcrequired to operate, repair, servicing and maintain the system shall be arranged by the contractor at no extra cost to Department.
All consumable items, such as fuses, resistance, cleaning material, battery acid, distilled water, battery thimbles clamp, grease, copper conductor PVC insulated Fire alarm cable of required size, thimbles & ferrules of all sizes, PVC insulation tape, nuts bolts, screws, etc. shall be provided by contractor at no extra cost to department.
All complaints/Breakdown shall be attended/rectified by the Contractor within 08 Hours. Failing which a recovery of Rs 2000/- per complaint per day shall be made from contractor's dues subject to a maximum of 10 days.
In case of any break down/inspection, any additional manpower required shall be arranged by the contractor without any extra cost to the Govt.
The regular and periodical cleaning/ routine checking/ testing and adjusting the detectors shall be carried out by the Contractor in planned and systematic manner for efficient and smooth functioning of system.
All regular/ periodic inspection, testing and commissioning including preventive maintenance shall be carried out by the Contractor as per IS 2189 : 2008 with latest amendments and as recommended by the manufacturers.
Repair/ Servicing /Replacing of the equipments/shifting devices & other items related with fire alarm system shall be carried out by the staff deployed by the contractor at without any extra cost to department.
The contractor shall be responsible for handing over the complete Fire detection & Alarm system alongwith all devices/accessories/control wiring harness in serviceable condition in the time of completion of works duly inspected by OE, Garrison Engineer, Fire authority alongwith official of user's and rep of contractor jointly and inspection report of serviceabilty state of Fire detection & Alarm system alongwith PA system duly signed shall be submitted to Accepting officer.
During comprehensive maintenance period if any device any type / any model / capacity unserviceable then contractor should replace the same with new one without extra cost. All work should executed through OEM.
The contractor should visit site for survey of complete Fire detection & Alarm system installations alongwith OEM before quoting of rate and after acceptance of contract all defects should rectified and made functional as per OEM standard.
Sumit Enterprises (BID ID -3196448)
SKYLIGHT INNOVATIONS (BID ID -3199901)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .