| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-AOC | ₹31.5 L | L1 | Accepted-AOC SRI DILIP KUMAR SETHY C CLASS CONTRACTOR WAS DECLARED THE SUCCESSFUL BIDDER L1 FOR EXECUTION OF THE SAID WORK |
| 2 | L2₹29.6 LRejected-Finance | ₹29.6 L | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | L3₹29.7 LRejected-Finance | ₹29.7 L | L3 | Rejected-Finance NOT QUALIFIED |
| 4 | L3₹29.7 LRejected-Finance AT PARIKUL PO BUANL PS SADAR BALASORE DIST BALASORE ODISHA 756027 | BALASORE | BALASORE | ODISHA | 756027 | ₹29.7 L | L3 | Rejected-Finance NOT QUALIFIED |
Tender Value
₹35.0 L
EMD Value
₹34,987
Closing Date
29 Jan 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER
RANGEILUNDA BLOCK
BUILDING WORK
2026_PRBRU_124308_1
03/2025-26
Open Tender
Civil Works - Bridges
180 days
RANGEILUNDA BLOCK
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹34,987
Yes
7 Apr 2026
8 Jan 2026
30 Jan 2026
8 Jan 2026
29 Jan 2026
8 Jan 2026
R.C.C. work of M-30 grade with 20mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying (First Floor)
Straightening, cutting, bending , binding tor steel rods , cranking , hooking , tying the grills in proper position for R.C.C. work including cost of binding wires of 18 to 20 gauge, cost , conveyance , taxes of steel and all other materials , cost of all labour with T&P required for the work etc. complete . ( First Floor)
Providing and removing after casting rigid and smooth centering and shuttering for R.C.C. works including false work and dismentaling them after casting including cost, conveyance, royality and taxes of all materials required for the work complete in all respects as per specification and direction of the Engineer-in-charge. ( First Floor)
i) R.C.C. beams, column, grider and bressmer, etc.
ii) R.C.C. Lintels (A/R 2006-Page No-54 item-10)
iii) R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas upto 4.3m height
2.5 cm. thick grading concrete (1:2:2) on roof slab with 6mm. size hard granite chips on new work.( First Floor)
Brick work with Fiy Ash Bricks 23cm. X 11cm. X 8cm. Size in C.M. (1:6) in Foundation and Plinth including cost of materials, required etc. complete in all respect including cost, conveyance, royality and other taxes of all materials with supply of labour and T & P required in all respect as directed by the Engineer - In - Charge. ( First Floor)
06mm. Thick Cement Plaster in C.M. (1:4) for RCC Surfaces including all cost, conveyance, labour, T&P etc., required for the work complete as directed by the E.I.C. ( First Floor )
12mm. Thick Cement Plaster in C.M. (1:6) for brick masonry including all cost, conveyance, labour, T&P etc., required for the work complete as directed by the E.I.C.( First Floor)
16mm. Thick Cement Plaster in C.M. (1:6) for brick masonry including all cost, conveyance, labour, T&P etc., required for the work complete as directed by the E.I.C. ( First Floor)
Supplying, fitting & fixing of 10 mm thick & size of 600x600 mm Glazed Vitrified floor tiles (GVT) of matt finish(WOODEN FINISH/RUSTIC FINISH) with veilcraft (VC ) shield( Scratch free/stain free) with water absorption limit between 0.08% to 3% and conforming to IS : 15622:2006 (Group B Ib). laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge (for New Work only )( First Floor)
Supplying, fitting & fixing of External Digital tiles in dadoes, skirting and risers of steps laid on 12 mm thick cement mortar (1:3) (1 cement : 3 course sand) jointed with slurry mixed with pigment to match the shades of the tiles etc. complete including cost of all materials, labour T&P etc. required for the work all complete as per direction of the Engineer-in-charge ( First Floor)
Supplying and Fixing of M.S. Grills, M.S.Doors, M.S. Gate etc including cost,conveyance of all materials,priming,and labour for fitting fixing etc.complete as per the instruction of Engineer-in-Charge ( First Floor)
Supplying Fitting, fixing up fully glazed aluminium framed window (sliding type) made up aluminium section 9778 as window frame, section 4095, 4096 and 9777, 3994 as shutter frame with 5mm black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of all materials, all taxes, labour, T&P excluding cost of glass etc. complete as per direction of the Engineer-in-charge ( First Floor)
Providing & fixing of Swing door of approved make to be fabricated from roll formed sections made of pre -painted steel (base steel as per IS-513 of 0.60 mm thick "D" qualiyu, galvanised as per IS-277 with zinc of 120 gm/sqm)with total coated thickness of 0.55 mm slide guide section should be made of o.5 mm stainless steel of 430 grade with paint specification being with primer of 5-7 microns thick & finished paint with polyster paint(Black/Pearlwhite/Chocolate brown) of 12-16 microns along with the alkyd backer at the back of 5-7 microns & sections for external frame bottom 33x57 mm and shutter being 46x52 mm, and 46x46 mm and lock rail should be of 23x130mm .Accessories/gaskets are to be used as per the manufacturer's supply & specifiction like gasket will be made of EPDM . All corner brackets for internal & external are to be made of glass filled nylon. The sections are to be cut to length, joined & assembled by means of corner bracket &frames are fixed to the concrete/ masonry walls by means of self expanding screws & glass to be used of 6mm clear with all taxes complete.( First Floor)
Provision of readymade PVC doors in toilet,etc. to be paid as per E.P.M. Rate
Priming 1 coat with any approved primer including cost of all materials, leads & lifts , labours, T & P , etc. complete as per direction of the Engineer-In-Charge. (First Floor )
Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials labour T & P etc. as per direction of Engineer -In -charge( First Floor)
Wall Painting two coat with Plastic Emulsion Paint of approved shade on new work to give on even shade including cost of Paint ( First Floor )
Wall Painting two coat with Weather Coat of approved shade on new work to give on even shade including cost of Paint ( First Floor )
Painting two coats with any approved enamel paint over one coat of primer on M.S Door, Window etc. including cost of paint , primer & labour .(First Floor )
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_574821.pdf
finsummary_574821.pdf
aoc.pdf
finance_574821.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
ACRGOPALPUR.pdf
Tender Documents • 23.27 MB
BOQ_574821.xls
BOQ • 0.39 MB