Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹22,377
Closing Date
27 Jul 2026, 6:00 pmDue tomorrow
UNIT HEAD
RIICO Ind. Area Kherda Sawai Madhopur
Construction of RCC drain at missing link at industrial area Kherda
2026_RIICO_575076_2
RIICO/SWM/2026-2027/NIT NO- 24
Open Tender
Civil Works
Percentage
90 days
ind. area Kherda
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
NEFT/RTGS
₹22,377
Yes
16 Jul 2026
16 Jul 2026
28 Jul 2026
16 Jul 2026
27 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | - | Cum | 175 | - |
| 2 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level., 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | Cum | 3,302 | - |
| 3 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | - | Cum | 4,934 | - |
| 4 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | - | Sqm | 157 | - |
| 5 | Providing and fabricating reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding (including cost of binding wire) all complete up to floor five level. ('Original producers' who manufacture billet directly from iron ores and roll the bilets to produce steel conforming to IS:1786) Thermo-mechanically Treated bars (Conforming of relevent IS code) | - | Kg | 77 | - |
| 6 | Earth, Sand, Lime, Morrum manure or sludge For 1 Km. | - | Cum | 80 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
RCCDRAINMISSINGKHERDA.pdf
Tender Documents • 0.19 MB
BOQ_1022795.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].