Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹71,100
Closing Date
19 Oct 2026, 3:30 pm
CE(EHT-Maint.)
Block no. 3, 3rd Floor, Shakti Bhawan, Rampur, Jabalpur
Construction of RR masonry/ RCC revetment wall/ hume pipe culvert at various tower 06 no. tower loc. of various 05 no. 220/132 kV EHV lines through work contract under EHT-Maint., Division, Itarsi and Bina
2026_MPPTC_533391_1
CE_EHT_M_Tender_MT_287_2026
Open Tender
Miscellaneous Works
Percentage
180 days
Jabalpur
As per Tender Document
12 documents required · 12 mandatory
₹2,360
₹71,100
Yes
3 Sept 2026
3 Sept 2026
21 Oct 2026
3 Sept 2026
19 Oct 2026
1 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Volume of excavation in Dry soil | 114.49 | CuM | 210 | ₹24,043.74 |
| 2 | Volume of excavation in Wet/BC soil | 346.64 | CuM | 240 | ₹83,193.12 |
| 3 | Volume of Base padding of Ratio 1:3:6 by 40 mm metal | 97.71 | CuM | 8,360 | ₹8,16,855.6 |
| 4 | Volume of R/R massonary wall jointing by mortor ratio 1:5 including pointing by ratio 1:3 | 671.24 | CuM | 6,600 | ₹44,30,164.2 |
| 5 | Volume of Top padding of ratio 1:2:4 by 20 mm metal | 8.19 | CuM | 8,690 | ₹71,153.72 |
| 6 | Cost of M15 Concreting (1:2:4), including centering/ shuttering, backfilling, muffing, coaping & curing, including cost of material (cement, metal, sand, etc.) | 13.85 | CuM | 9,020 | ₹1,24,927 |
| 7 | "Providing and laying in position Reinforced Cement Concrete NP 3 Class/prestressed concrete hume pipe for cluverts on first class bedding of granular material in single or double row including fixing collar with cement mortar 1:2 but exclucing excavation, protection works backfilling, concrete & masonary works in headwalls, parapets, abutments, etc. but including coast of pipes collars, cement mortar for jointing, placing in position, labour transportation, tec complete as poer direction of Engineer-in-charge. (c) Pipe Diameter 1000mm". | 35 | M | 3,937 | ₹1,37,795 |
| 8 | Cost of laying reinforcement steel including cost of material (steel, binding wire etc) | 0.87 | MT | 77,330 | ₹67,431.76 |
| 9 | Volume of Back Filling in soft rock including watering and ramming | 553.74 | CuM | 340 | ₹1,88,272.62 |
| 10 | Providing and fixing 100 mm dia AC pipe for weep holes (Average lengh of per pipe 1.0 Mtr.) | 404 | RM | 200 | ₹80,800 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_642137.xls
BOQ • 0.26 MB
TenderDocumentMT287.pdf
Tender Documents • 1.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .