Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.2 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹74.6 L+₹37,467.15 (0.50%)Accepted-Finance NO 5 KAJIYAR STREET MANCHANGULI B MUTLUR POST BUVANAGIRI TALUK CUDDALORE DISTRICT | MANCHANGULI | CUDDALORE | TAMIL NADU | L2 | Accepted-Finance L2 |
Tender Value
₹75.0 L
EMD Value
₹47,500
Closing Date
10 Jan 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
Executive Officer, Arulmigu Devanathaswamy Thirukoil, Thiruvanthipuram, Cuddalore Taluk and District - 607001.
Repairs and Renovation of All Sannathies in Arulmigu Devanathaswamy Thirukoil at Thiruvanthipuram Cuddalore Taluk and District
2023_HRCE_402474_1
99187/2023/G1
Open Tender
Civil Works
Works
270 days
Cuddalore
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹47,500
12 Jan 2024
22 Dec 2023
10 Jan 2024
22 Dec 2023
10 Jan 2024
22 Dec 2023
Amount
Clean removal of damaged cement plaster from the brcik surface and clearing the debris from the site including all labour charges etc complete
Dismantling of plain cement concrete 1:5:10, clearing the debris from the site including all labour charges etc complete
Removal of brick work in lime mortar and clearing the debris from the site including all labour charges etc complete
Clean removal of modern tiles in cement mortar and clearing the debris from the site including all labour charges etc complete
Providing scaffolding charges for Vimanam/Gopuram with steel posts non- flammable shade wherever necessary for main formwork and providing ladder arrangements, centering steel sheet for working inspection etc., complete as per standard specification. Hire charges for errection and maintenance and removing the same on completion of work upto various height
Vimanam 15' height
Vimanam 25' height
Providing vargapoochu over the core walls of vimanams/Gopurams,with lime mortar 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with lime mortar 1:1.5 and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area for kalkaram.
Vimanam 15' height
Vimanam 25' height
Plastering with lime mortar 1:1.5 (one of lime, one and half of sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams, including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft
Vimanam 15' height
Vimanam 25' height
Painting two coats of newly plastered wall surface with ready mixed water based emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing ornamental teak wood temple pattern door of following size with four leaves as per the drawing approved by the departmental officer. The outer frames are four horizontal and two vertical santling. Shutter frame are two scantling.The panel shall have 20mm thick best and approved quality teak wood plank. the shutter shall be equal planks. the rate including cost of the best quality teak wood, Brarees Hinges, Tower bolts, Air drops ornamental Handles. The door frame and Shutter gives two coat best quality synthetic enamel paint.
Door size 4'0''X7'0''
Door size 3'0''X6'0''
Supplying and fixing of teak wood rafters including cost and conveyance of all materials and all labour charges etc., complete as per the standard specification
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Herbal washing to existing cutstone masonry work with the combination of natural materials like venthayam powder 20%, siyakai powder 10%, Arapu powder 5%, Boonthi kottai powder 3%, Arugambul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, sembaruthi leaf powder 3%(total 100%) are used for the removal of lime wash on stone and other deposits like soot and enamel paints.
Pointing the stone joints with lime mortar 1:1.5 (one of lime, one and five of sand) after rackingout the stone joints including erection of scaffolding charges etc complete.
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Paving with cut stone flooring using cut stone of size600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges.
Clean removal of damaged pressed tiles and weathering course and clearing the debris from the site including all labour charges etc complete
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the cutstone slab in a single layer of required slope and finished by beating the lime concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime mortar 1:1.5 (One Lime, One and Half of Five Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Sub total
K BALAGURU
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_479041.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .