Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Zonal Officer II
New Zonal office building, Kamarajar Salai, Chennai - 600068
Namakku Namme Thittam - Construction of compound wall and caretaker room at nedunchezhiyan street (200 feet road) in Division - 18, unit - 5, Zone 2
2026_CoC_712430_1
Z.O.II.C.No.E1/750467/2026
Open Tender
Civil Works
Works
90 days
Manali
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹12,500
10 Oct 2026
10 Oct 2026
27 Oct 2026
10 Oct 2026
26 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical... Footing Depth (including Refilling charges) | 23 | CUM | 368.55 | ₹8,476.65 |
| 2 | Supplying and filling in foundation, basement, etc... and as directed by the departmental officers. | 5 | CUM | 391.95 | ₹1,959.75 |
| 3 | Cement Concrete 1:3:6 (One Cement, Three crushed sleast 1 metre height)-Mixing by mechanical means | 5 | CUM | 6,916.1 | ₹34,580.5 |
| 4 | Supplying and filling in foundation, basement tion and as directed by the departmental officers | 17 | CUM | 252.32 | ₹4,289.44 |
| 5 | Supplying, fabricating and placing in position Ribnt and binding wire) Uplo plinth/ Basement level M | 1,841 | KGS | 96.53 | ₹1,77,711.73 |
| 6 | Supplying and erecting steel centering including nl be given after the concrete is laid). FOUNDATION | 22 | SQM | 756.34 | ₹16,639.48 |
| 7 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid). SLAB | 45 | SQM | 1,011.91 | ₹45,535.95 |
| 8 | Supplying and erecting centering for plane surface... | 66 | SQM | 1,069.07 | ₹70,558.62 |
| 9 | Providing and laying in position, Standardised Con the Department for the excess usage of materials) | 25 | CUM | 8,197.92 | ₹2,04,948 |
| 10 | Brick work in following Cement Mortar using best qExecutive Engineer in charge, In Cement Morter 1:5 | 17 | CUM | 7,935.89 | ₹1,34,910.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
750467.pdf
Tender Documents • 1.32 MB
BOQ_855797.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .