| Sl No | Description | Qty | Unit | S R CONDRACT PROP S S RAJU L2 | ARUMUGAM . K L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Construction of Cement Concrete Road with Drain at K.Mettupalayam KAS Nagar. H/O Koshanam. | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 170.77 | Cum | 264 ₹45,083.28 | 263.78 ₹45,045.71 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications. | 53.01 | Cum | 5,594 ₹3.0 L | 5,592.2 ₹3.0 L |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for column, column footing, plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc complete | 468.06 | Sqm | 550 ₹2.6 L | 547.5 ₹2.6 L |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 24.41 | Cum | 6,892 ₹1.7 L | 6,889.21 ₹1.7 L |
| 6.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 54.22 | Cum | 6,348 ₹3.4 L | 6,345.23 ₹3.4 L |
| 7.00 | Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 90.45 | Sqm | 584 ₹52,822.80 | 581.83 ₹52,626.52 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.1 | Mt | 91,898 ₹9,189.80 | 91,895.3 ₹9,189.53 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.32 | Cum | 9,325 ₹12,309 | 9,323.79 ₹12,307.40 |
| 10.00 | Supply and fixing of Bitumen expension joints including all labour charges | 4.73 | Sqm | 237 ₹1,121.01 | 234.3 ₹1,108.24 |
Tender Value
₹14.2 L
EMD Value
₹28,400
Closing Date
6 Feb 2026, 3:00 pmClosed
S.Senthilkumar BDO(BP), Nambiyur
Block Development Office, Nambiyur
Construction of Cement Concrete Road with Drain at K.Mettupalayam KAS Nagar H/O Koshanam - General Fund (DP)-2025-2026
2026_RDTN_648718_1
Roc No.90/2026/A2 Dated.28.01.2026
Open Tender
Civil Works - Others
Block Development Office, Nambiyur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹28,400
Yes
13 Mar 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for column, column footing, plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc complete
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply and fixing of Bitumen expension joints including all labour charges
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_777718.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_777718.xls
BOQ • 0.31 MB
techbid.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid