Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | L1 | Accepted-AOC Quoted Lowest Rate | |
| 2 | L2₹9.0 L+₹9,440.69 (1.06%)Rejected-Finance | L2 | Rejected-Finance Quoted Higher Rate | |
| 3 | L3₹9.1 L+₹13,396.80 (1.50%)Rejected-Finance | L3 | Rejected-Finance Quoted Highest Rate |
Tender Value
₹9.0 L
EMD Value
₹17,982
Closing Date
17 Feb 2026, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, PRDD, GTA
PANCHAYAT AND RURAL DEVELOPMENT DEPARTMENT, LUICES JUBLEE COMPLEX, DARJEELING.
Repair of DWS scheme at Chamoong Maletiney, Pokhariabong-I GP, Jorebonglow-Sukhiapokhari Dev. Block GTA.
2026_GTA_1002633_11
16(NIeT)/PRDD (15CFC)/ZP/T/UtF)/GTA/2025-26
Open Tender
CIVIL WORKS
Percentage
90 days
Jorebunglow Sukhiapokhri Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹17,982
3 Mar 2026
10 Feb 2026
19 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. . | |||||
| 1.01 | (a) Depth of excavation not exceeding 1.500 mm. | 10.6 | Cu.M | 119.27 | ₹1,264.26 |
| 2 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. | 17.67 | Sq.M | 50 | ₹883.5 |
| 3 | Cost of stone boulder 150 mm size delivered ans stacked at site. | 2.65 | Cu.M | 1,526.4 | ₹4,044.96 |
| 4(I) Cement concrete with graded stone ballast (40 mm size) excluding shuttering.In ground floor. | |||||
| 4.01 | (B) With N.B variety stone metal. | - | - | - | - |
| 4.02 | (a) 1:3:6 proportion. | 1.49 | Cu.M | 5,971.2 | ₹8,897.09 |
| 5Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | |||||
| 5.01 | (i) (1:3:6) proportion. | 17.45 | Cu.M | 3,964.8 | ₹69,185.76 |
| 6Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_2457480.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .