Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.0 LAccepted-Finance | L1 | Accepted-Finance Admitted | |
| 2 | L2₹81.8 L+₹84,175.34 (1.04%)Accepted-Finance | L2 | Accepted-Finance Admitted |
Tender Value
₹81.7 L
EMD Value
₹82,000
Closing Date
30 Sept 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA Krishnagiri
Krishnagiri DT - TNRRIS 2020-21- Hosur Block - Upgradation of 1 Road - TN-04-KRI-290
2020_RDTN_180535_1
Roc_no_4640_2020_R3_07_09_20
Open Tender
Civil Works - Roads
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹82,000
DRDA Krishnagiri
1 Oct 2020
19 Sept 2020
30 Sept 2020
19 Sept 2020
30 Sept 2020
19 Sept 2020
22 Sept 2020
90 days
Amount
1. Upgradation of road from Alasapalli road to Batavarapalli road KM 0/0-1/415 H/o. Alasapalli (R-243) Rs. 81.74 /- lakhs
Clearing and grubbing (Scrub Jungle) road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Construction of Granular Sub base by providing well graded material(63mm to 26.5mm @35%,26.5mm to 4.75 @45% and 4.75 mm below @ 20%)& spreading in uniform layers with tractor with grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per (Mix -in - place method) .
Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm)IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm
Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Construction of 1.50 M span Culvert at CH 30M
Dismantling of Existing RR Masonry structures like Cluverts as per standard specification
Dismantling of Existing RCC structures like Cluverts as per standard specification
Earth work excavation for Foundation in all class of soils Except hard rock requiring blasting including cost and conveyance of all Etc., Complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc
Cement concrete 1:3:6 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
foundation
Deck slab
Cement concrete 1:2:4 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and fabrication amd placing in position MS steel or Ribbed tor steel for all reinforced cement concrete works asper the design including cost of steel and binding wire in all floors etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal for all RCC item of works excluding curing providing fixtures like fan clamps in the RCC floor
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete.
Construction of 1.50 M span Culvert at CH 370 M
Earth work excavation for Foundation in all class of soils Except hard rock requiring blasting including cost and conveyance of all Etc., Complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc
Cement concrete 1:3:6 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
foundation
Deck slab
Cement concrete 1:2:4 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and fabrication amd placing in position MS steel or Ribbed tor steel for all reinforced cement concrete works asper the design including cost of steel and binding wire in all floors etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal for all RCC item of works excluding curing providing fixtures like fan clamps in the RCC floor
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete.
Construction of 1.50 M span Culvert at CH 640 M
Earth work excavation for Foundation in all class of soils Except hard rock requiring blasting including cost and conveyance of all Etc., Complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc
Cement concrete 1:3:6 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
foundation
Deck slab
Cement concrete 1:2:4 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and fabrication amd placing in position MS steel or Ribbed tor steel for all reinforced cement concrete works asper the design including cost of steel and binding wire in all floors etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal for all RCC item of works excluding curing providing fixtures like fan clamps in the RCC floor
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete.
Construction of 1.50 M span Culvert at CH 750 M
Earth work excavation for Foundation in all class of soils Except hard rock requiring blasting including cost and conveyance of all Etc., Complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc
Cement concrete 1:3:6 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
foundation
Deck slab
Cement concrete 1:2:4 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and fabrication amd placing in position MS steel or Ribbed tor steel for all reinforced cement concrete works asper the design including cost of steel and binding wire in all floors etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal for all RCC item of works excluding curing providing fixtures like fan clamps in the RCC floor
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete.
Construction of 1.50 M span Culvert at CH 1030 M
Earth work excavation for Foundation in all class of soils Except hard rock requiring blasting including cost and conveyance of all Etc., Complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc
Cement concrete 1:3:6 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
foundation
Deck slab
Cement concrete 1:2:4 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and fabrication amd placing in position MS steel or Ribbed tor steel for all reinforced cement concrete works asper the design including cost of steel and binding wire in all floors etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal for all RCC item of works excluding curing providing fixtures like fan clamps in the RCC floor
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete.
Construction of 1.50 M span Culvert at CH 1230 M
Earth work excavation for Foundation in all class of soils Except hard rock requiring blasting including cost and conveyance of all Etc., Complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc
Cement concrete 1:3:6 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
foundation
Deck slab
Cement concrete 1:2:4 mix using 40mm HBG metal For Foundation including Watering wherever necessary and laid in layers of not more then 15 cm thick .,compacting etc.,
Supplying and fabrication amd placing in position MS steel or Ribbed tor steel for all reinforced cement concrete works asper the design including cost of steel and binding wire in all floors etc.,
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS HBG metal for all RCC item of works excluding curing providing fixtures like fan clamps in the RCC floor
Collection and supply of well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc., complete.
Providing CC Pavement
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Supply and fixing of HM strone
Supply and fixing of KM strone
Providing Name Board
Providing Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K P GOVINDASAMY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .