Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 LAccepted-AOC VILLAGE SANARSA P O KARTOT TEHSIL RAMPUR DISTT SHIMLA H P | RAMPUR | SHIMLA | HIMACHAL PRADESH | 1 | Accepted-AOC 1st lowest | |
| 2 | 2₹9.7 L+₹18,462.81 (1.93%)Rejected-Finance VILLAGE RAHNU P O KARERI TEHSIL RAMPUR DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 2 | Rejected-Finance L2 |
Tender Value
₹9.3 L
EMD Value
₹19,000
Closing Date
19 Feb 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
C.O ambulance road to Ward No. 1 Kandi to Dugiriuni, MC Rampur Bsr. Km. 0.000 to 1.215, 0.000 to 0.525 and 0.000 to 0.600
2026_PWD_128452_1
PW/RMP/TA/2025-12087 dated 06.02.2026
Open Tender
Civil Works - Roads
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
11 documents required · 11 mandatory
₹350
Yes
₹19,000
Yes
11 May 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
13 Feb 2026 - 19 Feb 2026
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_189849.xls
BOQ • 2.06 MB
SBD.pdf
Tender Documents • 2.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .