Tender Value
₹5.3 L
Closing Date
5 Jul 2022, 6:00 pmClosed
DFO Demarcation Forest Division Kashmir, Srinagar
Office of the Divisional Forest Officer Demarcation Forest Division Kashmir, Sheikh Bagh, Srinagar, Kashmir, Jammu and Kashmir
Construction of 96 No. Demarcation Boundary Pillars as per approved design along the Forest Demarcation line and as per latitude and longitude found out by GPS in Chamarwani Forest (Co.Rb2a) of Shopian Forest Division.
2022_FD_175155_6
e-NIT NO 02 OF 2022-23 DATED 20-06-2022
Open Tender
Civil Works
Item Rate
40 days
Chamarwani Forest of Shopian Forest Division.
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Government Treasury under Account Head 0406-Forest
Exempted
19 Jul 2022
21 Jun 2022
7 Jul 2022
21 Jun 2022
5 Jul 2022
24 Jun 2022
22 Jun 2022 - 23 Jun 2022
Amount
Earthwork in excavation by manual means in trenches for foundation drains etc (not exceeding 1.5 mt in width including dressing of sides and ramming of bottoms,lift up to 1.5mts & lead of 50 mts including getting out the execavated soil and disposal of surplus excavated soil as directed.
Providing & laying cement concrete 1:3:6 mix using 1 cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size of specificied grade excl cost of centering and shuttering .All works up to plinth level.
Reinforced cement concreate work in walls (any thinkness) pillars in 1:1.5:3 including attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutments,posts and struts upto floor five level including finishing and reinforcementcuring but excluding cost of centering shuttering.
Reinforecement for R.C.C work including straighening,cutting,bending,placing in position and bending all complete(TMT bars) including all carriages of materials from approved source upto site of work complete job.
Centering and shuttering including strutting,propping etc and removal of form work in walls,colums pillars abettments posts and struts.
12 mm cement plaster of mix 1:4 (1 cement :4 coarse sand) sides of pillar including all carriages of materials from approved source upto site of work complete job.
Filling available excavated earth (excluding rock) in trenches,plinth,sides of foundations etc in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering.
Finishing walls with textured exterior paint of required shade on new work ( two or more coasts applied @ 3.28 litre/10Sqm over and including base coat of water proofing cement paint applied @ 2.20kg/10sqm.
Providing and applying /fixing departmental LOGO on the front side in painting form with stencil Wood / Steel base on all boundary pillars with writing of Geo-cordinates.
BHAT CONSTRUCTION
NAZIR AHMAD BHAT
MUSHTAQ AHMAD SHAH
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .