Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3 L
Closing Date
7 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
XEN REW UDHAMPUR
XEN REW UDHAMPUR
BOQ
2021_RDPR_150082_8
Fresh e-NIT No 218 REW Udh of 21-22 DT. 24-11-2021
Open Tender
Civil Works
Item Rate
90 days
UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
Yes
XEN REW UDHAMPUR
Exempted
8 Dec 2021
27 Nov 2021
8 Dec 2021
27 Nov 2021
7 Dec 2021
27 Nov 2021
120 days
Amount
Earth work in excavation by manual means in trenches for foundation, drains, pipes, cables etc (not exceeding 1.5 mtr in depth) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan depth upto 1.5 Mtr including disposal of excavated earth upto 1 mtr from urring edge, dispoded earth is to be levelled and neatly dressed. 100% All kinds of soil Including all leads, lift and carriage complete.
Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregates 40mm nominal size) Including all leads, lift and carriage complete.
Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregates 20mm nominal size) Including all leads, lift and carriage complete.
Providing and laying in position of cement concrete of specified grade excluding the cost of centring and shuttering - all work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregates 20mm nominal size) Including all leads, lift and carriage complete.
Dumping / filling of stones including cost of stones. In horizontal on level. Including all leads, lift and carriage complete. Including all leads, lift and carriage complete.
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. 50 mm thick with 20mm nominal size stone aggregate. complete Including all leads, lift and carriage complete.
STONE SOLING IN HORIZONTAL INCLUDING SUPPLY OF STONE Including all leads, lift and carriage complete.
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete WELDED
Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.50 mm thick with zinc coating not less than 275 gram/m2
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
ROMESH PAUL SHARMA
SUNIL SHARMA
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .