Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹38.7 L
EMD Value
₹77,420
Closing Date
17 Oct 2026, 4:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
PWD RnB Division Bhaderwah
Construction of Steel Foot Bridge at Binkund Nallah Near Danda Gharat Bhalla (Under SDRF Capex (Flood Relief Measures) during Financial Year 2026-27)
2026_PWDJK_327714_1
e-NIT No. 98 of 2026-27 Dt. 10-10-2026
Open Tender
Civil Works
Percentage
45 days
Bhaderwah
These documents are to be submitted as non-sensitive document from my document area of bidder
3 documents required · 3 mandatory
₹600
Executive Engineer
₹77,420
10 Oct 2026
10 Oct 2026
19 Oct 2026
10 Oct 2026
17 Oct 2026
10 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labour for Dismantling of old bridge Carpenter 1st Class | 30 | Days | 806 | ₹24,180 |
| 2 | Engagement of labour for Dismantling of old bridge Helper | 75 | Days | 553 | ₹41,475 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement | 10.16 | Cum | 9,395.7 | ₹95,460.31 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars | 944.8 | Kg | 123.2 | ₹1,16,399.36 |
| 5 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete Riveted and bolted | 23,676.59 | Kg | 142.9 | ₹33,83,384.71 |
| 6 | Providing and fixing bolts including nuts and washers complete. | 485 | Kg | 131.2 | ₹63,632 |
| 7 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube | 660.8 | Kg | 161.05 | ₹1,06,421.84 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work | 156.07 | Sqm | 131.85 | ₹20,577.83 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc | 7.84 | Sqm | 628.95 | ₹4,930.97 |
| 10 | Carriage of Sand and Aggregate for an Avg. distance of 30 Kms by MT and 500 Mtr. By HL | 13.11 | Cum | 1,114.14 | ₹14,606.38 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_1108968.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .