Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.3 L+₹1.1 L (52.1%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹3.4 L+₹1.2 L (53.2%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹3.4 L
EMD Value
₹6,800
Closing Date
10 Aug 2026, 10:00 amClosed
XEN REW JAMMU
XEN REW JAMMU
Constt.of Lane near H/0 Ex Sarpanch Pallavi Verma and others w no.1 Pyt Bhlwal Lower scheme CDF YEAR 2026-27(2nd call)
2026_RDPR_319094_2
e-NIT No. 338 REW J of 2026-27 dated 31-07-2026
Open Tender
Civil Works
Percentage
XEN REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH 0515
₹6,800
18 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | labour engaged for prepration of site 3 lab for 1 day | 3 | no. | 553 | ₹1,659 |
| 2 | Earthwork in excavation by manual means in trenches for found drains etc | 2.97 | cum | 479.3 | ₹1,423.52 |
| 3 | Demolishing/dismentalling of cement concrete manually/mechanically including disposal | 2.42 | cum | 1,725.2 | ₹4,174.98 |
| 4 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level 1:5:10 (1 Cement:5 coarse sand:10 Graded stone aggregate 40mm nominal size) | 15.95 | cum | 4,826.5 | ₹76,982.68 |
| 5 | providing and laying 60 mm thick factory made interlocking pavour blocks m30 grade laid over 50 mm bed of fine sand | 193.9 | sqm | 816.15 | ₹1,58,251.49 |
| 6 | Providing and Laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering all work upto plinth level 1:3:6 (1 Cement:3 coarse sand:6 Graded stone aggregate 20mm nominal size) | 6.09 | cum | 5,733.6 | ₹34,917.62 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level(1:1.5:3)mix | 0.7 | cum | 9,821.85 | ₹6,875.3 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | 30 | cum | 123.2 | ₹3,696 |
| 9 | Steel work welded in built up sections/framed work, including cutting,
hoisting, fixing in position and applying a priming coat of approved steel
primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates | 150 | kg | 181.6 | ₹27,240 |
| 10 | providing formwork for shuttering and removal of formbase | 27.65 | sqm | 286.35 | ₹7,917.58 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1055414.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .