Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.6 L+₹1.0 L (18.9%)Admitted-Fee/PreQual/Technical/Finance | ₹6.6 L+₹1.0 L (18.9%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.7 L+₹1.1 L (20.6%)Admitted-Fee/PreQual/Technical/Finance | ₹6.7 L+₹1.1 L (20.6%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.1 L+₹1.6 L (28.7%)Admitted-Fee/PreQual/Technical/Finance KRISHNAGIRI | TAMIL NADU | 635001 | ₹7.1 L+₹1.6 L (28.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹8.2 L+₹2.6 L (47.5%)Admitted-Fee/PreQual/Technical/Finance SAROJA CONTRACTOR SENJI TAMIL NADU TN | ₹8.2 L+₹2.6 L (47.5%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R RAJENDIRAN L4 | R ARUNMOZHIDEVAN L2 | DHARUMAN CONTRACTORS L3 | Saroja L5 | ABITHA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Reconstruction of Weir @Odaithangal Eri in V.Nayambadi Pt | ||||||||
| 1.01 | Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting | 71.53 | cum | 225.53 ₹16,132.3 | 208.39 ₹14,905.86 | 211 ₹15,092.83 | 258.5 ₹18,490.82 | 175.41 ₹12,547.08 Lowest |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 14.09 | cum | 4,891.41 ₹68,920 | 4,519.55 ₹63,680.47 | 4,579.6 ₹64,526.56 | 5,606.53 ₹78,996.02 | 3,804.43 ₹53,604.42 Lowest |
| 1.03 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 70.74 | cum | 6,000.36 ₹4,24,465.17 | 5,544.19 ₹3,92,195.89 | 5,618 ₹3,97,417.32 | 6,877.6 ₹4,86,521.48 | 4,666.94 ₹3,30,139.34 Lowest |
| 1.04Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm | ||||||||
| 1.05 | For Centering without strutting | 76.4 | m2 | 468.11 ₹35,763.8 | 432.52 ₹33,044.91 | 438.25 ₹33,482.3 | 536.55 ₹40,992.42 | 364.09 ₹27,816.48 Lowest |
| 1.06 | For Centering with strutting | 57.4 | m2 | 936.23 ₹53,739.32 | 865.05 ₹49,653.87 | 876.5 ₹50,311.1 | 1,073.1 ₹61,595.94 | 728.18 ₹41,797.53 Lowest |
| 1.07 | Provision for Name Board charges | 1 | Nos | 4,275 ₹4,275 | 3,555 ₹3,555 | 4,500 ₹4,500 | 4,900 ₹4,900 | 2,992.5 ₹2,992.5 Lowest |
| 1.08 | Provision for Photo charges | 1 | Nos | 427.5 ₹427.5 | 790 ₹790 | 500 ₹500 | 490 ₹490 | 332.5 ₹332.5 Lowest |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,08,670 ₹1,08,670 | 1,00,409 ₹1,00,409 | 1,01,849 ₹1,01,849 | 1,24,558 ₹1,24,558 | 84,461 ₹84,461 Lowest |
Tender Value
₹8.4 L
EMD Value
₹8,400
Closing Date
21 Sept 2026, 3:00 pmClosed
BDO BP
Block Development Office, Gingee
Reconstruction of Weir at Odaithangal Eri in V.Nayambadi Panchayat
2026_RDTN_704633_1
Gingee/15thCFC (BP) Savings and Interest Fund /2026-27
Open Tender
Civil Works
Works
30 days
Gingee
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,400
Yes
21 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Reconstruction of Weir @Odaithangal Eri in V.Nayambadi Pt | |||||
| 1.01 | Earthwork excavation for foundation in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil inclusive of shoring to full depth strutting | 71.53 | cum | 263.78 | ₹18,868.18 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 14.09 | cum | 5,720.95 | ₹80,608.19 |
| 1.03 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 70.74 | cum | 7,017.96 | ₹4,96,450.49 |
| 1.04 | Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm | - | - | - | - |
| 1.05 | For Centering without strutting | 76.4 | m2 | 547.5 | ₹41,829 |
| 1.06 | For Centering with strutting | 57.4 | m2 | 1,095 | ₹62,853 |
| 1.07 | Provision for Name Board charges | 1 | Nos | 4,500 | ₹4,500 |
| 1.08 | Provision for Photo charges | 1 | Nos | 1,000 | ₹1,000 |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_846981.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .