Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L2₹6.3 L+₹3,350 (0.54%)Qualified Item Categories: Solar Street Lighting System (NTPC) 7 1 302 45 4 3RD FLOOR SADGURU NIVAS BK GUDA BALKAMPET HYDERABAD TELANGANA 500038 | HYDERABAD | TELANGANA | 500038 | Item Categories: Solar Street Lighting System (NTPC) | L2 | Qualified MII | |
| 2 | L3₹7.1 L+₹83,700 (13.4%)Qualified Item Categories: Solar Street Lighting System (NTPC) U R GARG SOLAR SOLUTIONS GALI NO 6F JEEVAN VIHAR EXTN SONIPAT SONIPAT HARYANA 131001 | SONIPAT | HARYANA | 131001 | Item Categories: Solar Street Lighting System (NTPC) | L3 | Qualified MII | |
| 3 | L5₹7.3 L+₹1.0 L (16.2%)Qualified Item Categories: Solar Street Lighting System (NTPC) PLOT NO 6 19 2ND FLOOR KATTORI MILL G T ROAD MOHAN NAGAR GHAZIABAD UTTAR PRADESH 201007 | GHAZIABAD | UTTAR PRADESH | 201007 | Item Categories: Solar Street Lighting System (NTPC) | L5 | Qualified MSE, Category: OBC | |
| 4 | L6₹8.4 L+₹2.2 L (35.1%)Qualified Item Categories: Solar Street Lighting System (NTPC) NEAR KIRAN WINE BAR YAVATMAL ROAD WANI CHIKHALGAON YAVATMAL MAHARASHTRA 445304 UDYAM MH 36 0016615 | YAVATMAL | MAHARASHTRA | 445304 | Item Categories: Solar Street Lighting System (NTPC) | L6 | Qualified MII | |
| 5 | L7₹12.2 L+₹5.9 L (94.8%)Qualified Item Categories: Solar Street Lighting System (NTPC) CCI INDUSTRIAL PARK CCI INDUSTRIAL PARK TAURU ROAD TAURU ROAD BILASPUR GURGAON HARYANA 122413 | GURUGRAM | HARYANA | 122413 | Item Categories: Solar Street Lighting System (NTPC) | L7 | Qualified MII |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
15 Sept 2025, 2:00 pmClosed
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6612103 Dated : 02-09-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : REGIONAL DIRECTOR
NRBPSU NRB Purchase & Stores Unit
6th Floor
South Wing
Vikram Sarabhai Bhavan (VSB)
Anushaktinagar
Mumbai - 400 094 (Ref. no. DPS/NRBPSU/12/N1/1676) (A.k. Jha) Splitting
8269995
GEM/2025/B/6612103
Single Packet Bid
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
45 days
401502, BARC TARAPUR COMPLEX, PO GHIVALI, BOISAR WEST DISTRICT PALGHAR MAHARSHTRA PIN
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
15 Sept 2025
2 Sept 2025
15 Sept 2025
Solar Street Lighting System (NTPC) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6612103 Dated : 02-09-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 16 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : REGIONAL DIRECTOR
NRBPSU NRB Purchase & Stores Unit
Vikram Sarabhai Bhavan (VSB)
Mumbai - 400 094 (Ref. no. DPS/NRBPSU/12/N1/1676) (A.k. Jha) Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8269995.pdf
GEM_BID
Forms_a9379627-fb56-49f2-94e21756198929204_apon1.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .