| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹65.7 L+₹8.8 L (15.5%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹73.8 L+₹16.9 L (29.6%)Rejected-AOC 584 BASANTPUR GEETA PRESS GORAKHPUR 273005 | GORAKHPUR | GORAKHPUR | UTTAR PRADESH | 273005 | L3 | Rejected-AOC L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical AS PER UPLOADED |
Tender Value
₹82 L
EMD Value
₹1.6 L
Closing Date
28 Aug 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Superintending Engineer, Rapti Nahar Nirman Mandal-2 Basti U.P.
Construction of V.R.B. (Box Calvert) at Km. 3.500 of Farenda Dy.
2021_UPIDC_612876_1
02/SE/2021-22
Open Tender
Civil Works
Item Wise
90 days
Maharajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.6 L
Yes
23 Feb 2022
21 Aug 2021
28 Aug 2021
23 Aug 2021
28 Aug 2021
23 Aug 2021
90 days
Amount
E/W in excavation of foundation in all type of soil including initial lead up to 30m & lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper completion of work including cost of all T&P,Labour etc.
Laying C.C, A-40, M-15 in foundation with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and crushed hard stone ballast (20-40mm size) including lead up 60m lift up to 3m mechanical mixing & mechanical vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc.
Laying R.C.C, A-20, M-25 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.0 and crushed hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Centering & Shuttering for C.C And R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc
Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire with required for proper completion of work including cost of all material, labour, T&P etc
S/F Draiange spout pipe 100mm dia in R.C.C slab for proper completion of work including cost of all material, labour, T&P etc
Laying and fixing joint filler board 18mm thick as specied location in different position required for proper complection of work i/c cost of all material, labour and T&P etc
E/W in making Diversion in all type of soil including lead up to 30.00 lift up to 1.50m with manual compaction and dressing required for proper completion of work
1st class Brick on edge soling on approch Road/Diversion with preparation of sub grade and filling joints with local earth, required for proper completion of work including cost of all material labour T&P etc
Dewatering with all cost of power/POL machines,pump well,paint system & operator etc with assembling and dismantling of equipment required for completion of work, labour, T&P etc.
P/L 75 mm dia PVC pipe for weep holes including cost of all material labour t&p etc
E/W in making canal section U/S and D/S of VRB/DRB i/c cost of all lead lift , drassing and mannual campaction etc.
E/W in filling between slab and parapet i/c lead lift and cost of all material, labour and T&P etc.
P/L GSB Grading-I, Grading-II and Grading-III with consolidation i/c cost of all material laber and T&P and complection of work.
P/L seal coat Type-A sealing the voids in a bituminous surface with crushed stone chipping of 6.7mm size defined as passing 9.50mm sieve and retained on 2.36mm. Sieve applied @0.09cum per 10sqm and bituminous surface laid to the specified levels, grade and crodd fall using type-A (Inclouding cost bitumen grit.
M/S BHOLU CONSTRUCTION COMPANY
SHREEASHOK
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .