| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.2 LAdmitted-Finance PLOT NO 46 P T COLONY TRIMULGHERRY HYDERABAD TELANGANA 500015 | HYDERABAD | TELANGANA | 500015 | ₹35.2 L | L1 | Admitted-Finance |
| 2 | L2₹36.0 L+₹77,933.58 (2.21%)Admitted-Finance | ₹36.0 L+₹77,933.58 (2.21%) | L2 | Admitted-Finance |
| 3 | L3₹39.7 L+₹4.5 L (12.7%)Admitted-Finance | ₹39.7 L+₹4.5 L (12.7%) | L3 | Admitted-Finance |
| 4 | L4₹52.6 L+₹17.3 L (49.3%)Admitted-Finance PLOT NO 28 SANTOSHIMA COLONY WEST MARREDPALLY SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | ₹52.6 L+₹17.3 L (49.3%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S DIVIJA BUILDERS L3 | PARDEEP AND CO L1 | Universal refrigeration and Engineering Company L4 | Vara Enterprises L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | De-sludging and cleaning of septic tank, manhole, sludge chamber etc by manual digging out and lifting of concerntrated sludge including dewatering and cleaning, removing silt, sludge , sludge water and any other foreign materials and depositing the same into excavated pits exceeding 1.5m depth at places ( n exc 100m) as directed by the Engr-in-Charge returining and filling in excavated earth after depositing sludge including sludge water and sprinkiling bleaching powder over surrounding area and removing surplus excavated soil nearby areas complete all as specified and directed.
(Note : Measurement shall be made for sludge incl sludge water). | 25 | Cum | 360 ₹9,000 | 300 ₹7,500 Lowest | 600 ₹15,000 | 400 ₹10,000 |
| 2.00 | Cleaning of all blockages of any type of sewage line ie branch sewer line, main sewer line etc, manholes of any size, section and depth, any situation by way of cleaning/desludging manholes by using any type either manually, mechanically or by way of any other suitable means including foreign materials as well as rodding of sewer lines and between successive from block manholes where required and ordered by Engineer-in-charge and keeping the sewage line functional duly cleaning trap, water closet, soil water/vent pipe, gully traps upto final drop free flow in to out let,septic tanks or central sewage system treatmenting in other adjoining Zone/Area or into sewage well (working in foul condition with taking precautionary measures) equipment as required or applicable and removing the sludge/material and depositing outside the MOD land and sprinkal of bleaching powder in adequate amount complete all as specified and directed.
NOTE:- Approximate quantity required to clean per month in Zone 'D' area as under: (a) 100 mm dia sewage line - 120 Metre (b) 150 mm dia sewage line 1100 Metre (c) 200 mm dia sewage line - 900 Metre (d) Manholes 1.0 x 1.0 Metre size - 150 Nos (e) Manholes 1.20 x 1.20m size 80 Nos (f) EWC/IWC, Nahani trap, gully trap, floor traps - 160 Nos. | 9 | Each Job | 60,000 ₹5,40,000 | 20,000 ₹1,80,000 | 80,000 ₹7,20,000 | 550 ₹4,950 Lowest |
| 3.00 | Cleaning of chocked sewer line of any description by mechanically driven vechile system and flushing with water complete all as specified for 150mm/200mm dia size of pipe.complete all as specified and directed.
Note:-Payment shall be done based on actual ground measurement taken while cleaning blokage of sewage line. | 900 | RM | 75 ₹67,500 | 45 ₹40,500 Lowest | 100 ₹90,000 | 90 ₹81,000 |
| 4.00 | Mechanically pumping out sewage water from Septic tanks/sump well where required and as directed with taking precautionary measurers including tools & plants as required and removing to place out side MOD land from the site sprinkal of bleaching powder in adequate amount complete (working in foul condition) complete all as specified and as directed.
Note:-Payment shall be done based on actual ground measurement taken while cleaning blokage of septic tank/ sump | 15 | Kilo Litre | 360 ₹5,400 | 200 ₹3,000 | 500 ₹7,500 | 110 ₹1,650 Lowest |
| 5.00 | Excavation in trenches by mechanical means (Hydraulic excavator) n.exc. 1.5m wide and n.exc. 1.5m in depth for taking up/laying sewer lines and getting out in any kind of soil complete all as specified and directed. | 150 | Cum | 306 ₹45,900 | 280 ₹42,000 Lowest | 400 ₹60,000 | 400 ₹60,000 |
| 6.00 | All as per item No.05 above but exc. 1.5m and n.exc. 3.0m deep complete all as specified and directed. | 15 | Cum | 325 ₹4,875 Lowest | 400 ₹6,000 | 380 ₹5,700 | 420 ₹6,300 |
| 7.00 | Returning, filling in soil including spreading, levelling, watering and well ramming in layers n.exc. 25cm complete all as specified and directed. | 377.03 | Cum | 100 ₹37,703 Lowest | 100 ₹37,703 Lowest | 150 ₹56,554.5 | 250 ₹94,257.5 |
| 8.00 | Removing of excavated soil to a distance n.exc 50m and depositing where directed at alevel n.exc 1.5m above starting point complete all as specified and directed. | 244.01 | Cum | 150 ₹36,601.5 | 200 ₹48,802 | 250 ₹61,002.5 | 110 ₹26,841.1 Lowest |
| 9.00 | Demolition and breaking up drain pipes 100mm dia ( Salt Glazed ware, AC or reinforced concrete) set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and directed. | 150 | RM | 10 ₹1,500 Lowest | 50 ₹7,500 | 10 ₹1,500 Lowest | 70 ₹10,500 |
| 10.00 | All as per item No.9 above but 150mm dia complete all as specified and directed. | 730 | RM | 11 ₹8,030 Lowest | 50 ₹36,500 | 20 ₹14,600 | 95 ₹69,350 |
Tender Value
₹49.4 L
EMD Value
₹99,000
Closing Date
29 Aug 2026, 6:00 pmClosed
RAMESH CHANDRA MEENA
GARRISON ENGINEER (SOUTH), MUDFORT, SECUNDERABAD
REP/MAINT OF SEWAGE LINE, SEPTIC TANK,MANHOLES , FILTER BED AND REP TO DRAIN,BOUNDARY WALL,FENCING, PLINTH PROTECTION, HARDSTANDING,PATHWAYS, ETC CERTAIN UNIT,DAD MD ACCN,CDA OFFICE,PAO (OR) (AOC,EME) AT UNDER AGE B/R (S) NO.I,II OF GE (S) SECBAD.
2026_MES_781122_1
GE(S)/SEC/TOKEN-71 OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE SOUTH, MUDFORT, SECUNDERABAD
For Enlisted contractors class D and above category a (ii) and for unenlisted contractors meeting the eligibility criteria of above class and category for along eligible class with EMD
6 documents required · 6 mandatory
₹500
GARRISON ENGINEER (SOUTH), MUDFORT, SECUNDERABAD
₹99,000
Yes
18 Sept 2026
27 Jul 2026
31 Aug 2026
27 Jul 2026
29 Aug 2026
11 Aug 2026
27 Jul 2026 - 10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-sludging and cleaning of septic tank, manhole, sludge chamber etc by manual digging out and lifting of concerntrated sludge including dewatering and cleaning, removing silt, sludge , sludge water and any other foreign materials and depositing the same into excavated pits exceeding 1.5m depth at places ( n exc 100m) as directed by the Engr-in-Charge returining and filling in excavated earth after depositing sludge including sludge water and sprinkiling bleaching powder over surrounding area and removing surplus excavated soil nearby areas complete all as specified and directed.
(Note : Measurement shall be made for sludge incl sludge water). | 25 | Cum | - | - |
| 2 | Cleaning of all blockages of any type of sewage line ie branch sewer line, main sewer line etc, manholes of any size, section and depth, any situation by way of cleaning/desludging manholes by using any type either manually, mechanically or by way of any other suitable means including foreign materials as well as rodding of sewer lines and between successive from block manholes where required and ordered by Engineer-in-charge and keeping the sewage line functional duly cleaning trap, water closet, soil water/vent pipe, gully traps upto final drop free flow in to out let,septic tanks or central sewage system treatmenting in other adjoining Zone/Area or into sewage well (working in foul condition with taking precautionary measures) equipment as required or applicable and removing the sludge/material and depositing outside the MOD land and sprinkal of bleaching powder in adequate amount complete all as specified and directed.
NOTE:- Approximate quantity required to clean per month in Zone 'D' area as under: (a) 100 mm dia sewage line - 120 Metre (b) 150 mm dia sewage line 1100 Metre (c) 200 mm dia sewage line - 900 Metre (d) Manholes 1.0 x 1.0 Metre size - 150 Nos (e) Manholes 1.20 x 1.20m size 80 Nos (f) EWC/IWC, Nahani trap, gully trap, floor traps - 160 Nos. | 9 | Each Job | - | - |
| 3 | Cleaning of chocked sewer line of any description by mechanically driven vechile system and flushing with water complete all as specified for 150mm/200mm dia size of pipe.complete all as specified and directed.
Note:-Payment shall be done based on actual ground measurement taken while cleaning blokage of sewage line. | 900 | RM | - | - |
| 4 | Mechanically pumping out sewage water from Septic tanks/sump well where required and as directed with taking precautionary measurers including tools & plants as required and removing to place out side MOD land from the site sprinkal of bleaching powder in adequate amount complete (working in foul condition) complete all as specified and as directed.
Note:-Payment shall be done based on actual ground measurement taken while cleaning blokage of septic tank/ sump | 15 | Kilo Litre | - | - |
| 5 | Excavation in trenches by mechanical means (Hydraulic excavator) n.exc. 1.5m wide and n.exc. 1.5m in depth for taking up/laying sewer lines and getting out in any kind of soil complete all as specified and directed. | 150 | Cum | - | - |
| 6 | All as per item No.05 above but exc. 1.5m and n.exc. 3.0m deep complete all as specified and directed. | 15 | Cum | - | - |
| 7 | Returning, filling in soil including spreading, levelling, watering and well ramming in layers n.exc. 25cm complete all as specified and directed. | 377.03 | Cum | - | - |
| 8 | Removing of excavated soil to a distance n.exc 50m and depositing where directed at alevel n.exc 1.5m above starting point complete all as specified and directed. | 244.01 | Cum | - | - |
| 9 | Demolition and breaking up drain pipes 100mm dia ( Salt Glazed ware, AC or reinforced concrete) set in cement mortar including PCC bed and haunching and removal of debris outside the MD land complete all as specified and directed. | 150 | RM | - | - |
| 10 | All as per item No.9 above but 150mm dia complete all as specified and directed. | 730 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
8002tenderdocuments.pdf
Tender Documents • 2.55 MB
BOQ_875025.xls
BOQ • 0.35 MB
8002amendmenno1.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .