| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC ADD O MONI NEK PUR NEAR SHIV HOSPITAL CIVIL LINES BUDAUN UP | BUDAUN | BUDAUN | UP | L1 | Accepted-AOC L1 | |
| 2 | L2₹21.2 L+₹153.52 (<0.01%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹22.9 L+₹1.7 L (8.23%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹23.0 L+₹1.8 L (8.49%)Rejected-AOC A 4 GALI NO 1 ANANDPURI MATHURA | MATHURA | MATHURA | UTTAR PRADESH | L4 | Rejected-AOC L4 |
Tender Value
₹26.2 L
EMD Value
₹53,000
Closing Date
15 Feb 2021, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
L.M.B.D.G.C., MATHURA
RECONSTRUCTION OF V.R.B. AT KM 117.800 OF MANT BRANCH.
2021_UPIDC_547444_50
10/EE/Lower Mat/2020-21
Open Tender
Civil Works - Canal
Item Rate
30 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹53,000
10 Mar 2021
8 Feb 2021
15 Feb 2021
8 Feb 2021
15 Feb 2021
8 Feb 2021
90 days
Amount
Dismantlling of old Bricks work in cement mortar including stacking of material with in 60m.
Earth work in excavation in foundation with saturated soils including all lead and lift up to 1.5m including dressing and making profile etc.complete.
Providing and laying Cement concrete (1:4:8) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and T&P etc.complete.
Brick work in 1:4 cement mortar with cement , coarse sand , and M-150 bricks . including cost of all material, labour and T&P etc.complete.
Centering & Shuttering for R.C.C. work with all cost of material, labour & T.& P. etc. complete.
supplyig of steel bars with bendig, binding, cutting and placing of reinforcement including cost of wire including all material, labour and T&P etc. complete.
Laying R.C.C (1:1.5:3) with cement, course sand and stone grit 10-20 mm including all cost of material, labour, T & P etc. complete.
Providing and laying Cement concrete (1:6:12) cement, coarse sand , and 10 to 20mm with all cost of all material, labour and T&P etc.complete.
Providing and laying Cement concrete (1:1.5:3) with cement, coarse sand , and 10mm to 20mm stone ballast including cost of all material, labour and T&P etc.complete.
Struck deep pointing in 1:2 on brick masonry, cement, coarse send including cost of all material, labour and T&P etc. complete.
Earth work in filling strengthening of bank in all types of soil including lead up to 500 m and lift up to 1.50 m with dressing and manual compaction all cost of labour and T&P etc. complete.
Supplying & fixing Drainage Pipe 75 mm dia with all cost of material,labour and T.& P. etc. complete.
one coat Priming & one coat Distempering with dry distemper of approved brand and required shade on undecorated wall surface to give an evan surface including supply of all materials, labour and T & P etc.
Supply and Fixing Sign board at site including all completion of works
Supplying & fixing wheel guard size 150x150x900 mm with all cost of material, labour and T.& P. etc. complete.
Dewatering with Diesel pump set of 7.5 H.P. including with all cost of material, labour and T&P etc.complete.
B.S. CONTRACTOR AND SUPPLIERS
M/S GANPATI CONTRACTORS AND SUPPLIERS
M/S PRADEEP ASSOCIATES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .