Tender Value
₹84.8 L
EMD Value
₹84,800
Closing Date
3 Aug 2020, 3:00 pmClosed
Project Director, DRDA
DRDA, Collectorate, Vengikkal, Tiruvannamalai
Implementation of JJM to provide Functional Household Tap connection 1728 Nos to Rural Households in Padur, Ramasamudram, Srirangarajapuram and Theyyar Village Panchayat of Thellar Panchayat Union under Package No.151 in Tiruvannamalai District
2020_RDTN_173489_1
Rc.No. A13/2794/2020, dt.03.07.2020 151
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Lump-sum
180 days
Thellar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹84,800
13 Aug 2020
27 Jul 2020
3 Aug 2020
27 Jul 2020
3 Aug 2020
27 Jul 2020
Amount
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 165 Nos in Padur colony Habitation in Padur Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Pumpset estimate - Supply and delivery of vertical wet type submersible pumpset (.....HP) capable of discharging any of the following pumpage in lpm against noted head in m suitable for erection into the bore well/Inf. well / open well with stainless steel shaft, bronze impeller and starter. - Supply, delivery and erection of Submersible Pumpset of 75 LPMX 175 Head as per SOR TWAD - Page 88
Supply and delivery of 3 phase Panel Board D.O.L with two level guard and auto start confirming to IS specification for 1 HP pumpset. TWAD SOR Page 101
Supply, delivery of 1.1 KV Grade,PVC insulated and sheathed 3 core flat copper submersible cable with ISI marking conforming of IS 694/1990 of reputed make for submersible motor erected in borewell. - 4.0 Sq.mm Copper cable page 109 II slno 2
Supply and Delivery of 1.1 KV grade 3 core Aluminum conductor U.G. cable conforming to IS 1554/part I and with ISI marking of reputed make for submersible motor erected in the Bore well/Open well page 109 ……..Sq.mm Armoured Aluminum conductor cable
Laying of …….Sqmm Armoured Aluminum conductor cable in trenches inside the pump room or in air etc., complet
Laying of …….Sqmm Armoured Aluminum conductor cable intrenches inside the pump room etc., complet
Supply and delivery of GI medium class pipes and specials as per relevant IS as listed below. - 50mm UPVC COLUMN PIPE
50mm GI Flangeset Heavy page 29
40mm MS Clampset Heavy page 29
50mm GM Non Return Valve page 30
50 x 40mm GI reducer heavy page 26
63m PVC T.Coupler
40mm Ball Valve/ GM Gate Valve page 30
40W box type tube light - 1 No.
100W bulb with angle holder
100W bulk head fittings
5 AMPS 3 pin socket with switch
5 Amps switches for light(Flush type)
Providing lighting wiring using MS conduit pipes and specials with 2 runs 1.5 sqmm PVC copper wire and 1 run 12 swg GI wire for earthing for light, fans and 5A plug points etc.,
(i) Aerial fuse board of size 15 x 10 x 6cm with 32 A aerial fuse carrier(3 Nos.)
(iii)Wall mounting type MS cubical EB meter box with fuse carrier (3 Nos) of 32 A capacity at EB supply point.This box is also to accommodate TNEB energy meter with proper ventilation as approved by TNEB.
(ii) Supply and laying of 7/20 size PVC insulator copper conductor cable from Aerial fuse to EB supply point etc., complete as per I.E Rules.
25mm dia GI pipe for service point
25mm dia elbow
GI wire for earth
Stay wire 7/20
20mm GI pipe for twin earthing and cableencasing
4 way neytral link
TW panel board
Labour charges for erection of submersible pump set including fixing and jointing the submersible cable with clamps to the required depth, valves and errection panel board control room twin earthing as per I.E Rules including cost of civil works - Upto 5 HP
Construction of Bore pit arrangements complete ect.
PUMP ROOM Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers
Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers.
Brick work in CM 1:5 using country briks for Foundation and basement
For super structure
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by TWAD Board Officers.
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) excluding cost of steel fabrication,fixing in position and centring charges but including mixing,lifting and vibrating for SUNSHADE 75mm thick at wall face and 50mm thick at free end projecting 45cm from wall face moulded along with lintel etc. as directed by TWAD Board Officers.
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers.
Special ceiling plastering for RCC Slab with C.M.1:3(One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by TWAD Board Officers.
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by TWAD Board Officers.
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.6 x 0.45 m
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departm
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by TWAD Board Officers.
Weathering Coarse over RCC roof including fixing one coarse of pressed tiles etc., complete.
Provision of lock and key for pump room and OHT ladder
Pumping Main - Supply,delivery, laying and jointing of 90mm OD PVC 6Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
b 90mm PVC Threaded coupler
New Borewell :Charges for Conducting Geo Physical Survey
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the TWAD Board Officers) including construction of mud pit. 0m to 18m depth
18m to 120m depth
Supply & delivery of 150mm Dia PVC Plain Casing pipe as per IS 12818 / 2010
Supply & delivery of 150mm Dia PVC end cap as per IS 12818 / 2010
Distribution Main - Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
63mm x 50mm PVC Threaded Coupler Page 10 SOR
63mm x 50mm PVC Tee IS 7834/1987 page 10
63mm End cap page 12 sl.no
Provision for gate valve 80mm
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 33 Nos in Pavazhanthangal Habitation in Padur Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 133 Nos in Padur Habitation in Padur Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Pumpset estimate - Supply and delivery of vertical wet type submersible pumpset (.....HP) capable of discharging any of the following pumpage in lpm against noted head in m suitable for erection into the bore well/Inf. well / open well with stainless steel shaft, bronze impeller and starter. - Supply, delivery and erection of Submersible Pumpset of 75 LPMX 175 Head as per SOR TWAD - Page 88
Supply and delivery of 3 phase Panel Board D.O.L with two level guard and auto start confirming to IS specification for 1 HP pumpset. TWAD SOR Page 101
Supply, delivery of 1.1 KV Grade,PVC insulated and sheathed 3 core flat copper submersible cable with ISI marking conforming of IS 694/1990 of reputed make for submersible motor erected in borewell. - 4.0 Sq.mm Copper cable page 109 II slno 2
Supply and Delivery of 1.1 KV grade 3 core Aluminum conductor U.G. cable conforming to IS 1554/part I and with ISI marking of reputed make for submersible motor erected in the Bore well/Open well page 109 ……..Sq.mm Armoured Aluminum conductor cable
Laying of …….Sqmm Armoured Aluminum conductor cable in trenches inside the pump room or in air etc., complet
Laying of …….Sqmm Armoured Aluminum conductor cable intrenches inside the pump room etc., complet
Supply and delivery of GI medium class pipes and specials as per relevant IS as listed below. - 50mm UPVC COLUMN PIPE
50mm GI Flangeset Heavy page 29
40mm MS Clampset Heavy page 29
50mm GM Non Return Valve page 30
50 x 40mm GI reducer heavy page 26
63m PVC T.Coupler
40mm Ball Valve/ GM Gate Valve page 30
40W box type tube light - 1 No.
100W bulb with angle holder
100W bulk head fittings
5 AMPS 3 pin socket with switch
5 Amps switches for light(Flush type)
Providing lighting wiring using MS conduit pipes and specials with 2 runs 1.5 sqmm PVC copper wire and 1 run 12 swg GI wire for earthing for light, fans and 5A plug points etc.,
(i) Aerial fuse board of size 15 x 10 x 6cm with 32 A aerial fuse carrier(3 Nos.)
(iii)Wall mounting type MS cubical EB meter box with fuse carrier (3 Nos) of 32 A capacity at EB supply point.This box is also to accommodate TNEB energy meter with proper ventilation as approved by TNEB.
(ii) Supply and laying of 7/20 size PVC insulator copper conductor cable from Aerial fuse to EB supply point etc., complete as per I.E Rules.
25mm dia GI pipe for service point
25mm dia elbow
GI wire for earth
Stay wire 7/20
20mm GI pipe for twin earthing and cableencasing
4 way neytral link
TW panel board
Labour charges for erection of submersible pump set including fixing and jointing the submersible cable with clamps to the required depth, valves and errection panel board control room twin earthing as per I.E Rules including cost of civil works - Upto 5 HP
Construction of Bore pit arrangements complete ect.
PUMP ROOM Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers
Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers.
Brick work in CM 1:5 using country briks for Foundation and basement
For super structure
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by TWAD Board Officers.
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) excluding cost of steel fabrication,fixing in position and centring charges but including mixing,lifting and vibrating for SUNSHADE 75mm thick at wall face and 50mm thick at free end projecting 45cm from wall face moulded along with lintel etc. as directed by TWAD Board Officers.
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers.
Special ceiling plastering for RCC Slab with C.M.1:3(One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by TWAD Board Officers.
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by TWAD Board Officers.
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.6 x 0.45 m
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departm
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by TWAD Board Officers.
Weathering Coarse over RCC roof including fixing one coarse of pressed tiles etc., complete.
Provision of lock and key for pump room and OHT ladder
Pumping Main - Supply,delivery, laying and jointing of 90mm OD PVC 6Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
b 90mm PVC Threaded coupler
New Borewell :Charges for Conducting Geo Physical Survey
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the TWAD Board Officers) including construction of mud pit. 0m to 18m depth
18m to 120m depth
Supply & delivery of 150mm Dia PVC Plain Casing pipe as per IS 12818 / 2010
Supply & delivery of 150mm Dia PVC end cap as per IS 12818 / 2010
Distribution Main - Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
63mm x 50mm PVC Threaded Coupler Page 10 SOR
63mm x 50mm PVC Tee IS 7834/1987 page 10
63mm End cap page 12 sl.no
Provision for gate valve 80mm
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 67 Nos in Koot road Habitation in Ramasamuthiram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 76 Nos in Mudalur Habitation in Ramasamuthiram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 174 Nos in Ramasamuthiram Habitation in Ramasamuthiram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Pumpset estimate - Supply and delivery of vertical wet type submersible pumpset (.....HP) capable of discharging any of the following pumpage in lpm against noted head in m suitable for erection into the bore well/Inf. well / open well with stainless steel shaft, bronze impeller and starter. - Supply, delivery and erection of Submersible Pumpset of 75 LPMX 175 Head as per SOR TWAD - Page 88
Supply and delivery of 3 phase Panel Board D.O.L with two level guard and auto start confirming to IS specification for 1 HP pumpset. TWAD SOR Page 101
Supply, delivery of 1.1 KV Grade,PVC insulated and sheathed 3 core flat copper submersible cable with ISI marking conforming of IS 694/1990 of reputed make for submersible motor erected in borewell. - 4.0 Sq.mm Copper cable page 109 II slno 2
Supply and Delivery of 1.1 KV grade 3 core Aluminum conductor U.G. cable conforming to IS 1554/part I and with ISI marking of reputed make for submersible motor erected in the Bore well/Open well page 109 ……..Sq.mm Armoured Aluminum conductor cable
Laying of …….Sqmm Armoured Aluminum conductor cable in trenches inside the pump room or in air etc., complet
Laying of …….Sqmm Armoured Aluminum conductor cable intrenches inside the pump room etc., complet
Supply and delivery of GI medium class pipes and specials as per relevant IS as listed below. - 50mm UPVC COLUMN PIPE
50mm GI Flangeset Heavy page 29
40mm MS Clampset Heavy page 29
50mm GM Non Return Valve page 30
50 x 40mm GI reducer heavy page 26
63m PVC T.Coupler
40mm Ball Valve/ GM Gate Valve page 30
40W box type tube light - 1 No.
100W bulb with angle holder
100W bulk head fittings
5 AMPS 3 pin socket with switch
5 Amps switches for light(Flush type)
Providing lighting wiring using MS conduit pipes and specials with 2 runs 1.5 sqmm PVC copper wire and 1 run 12 swg GI wire for earthing for light, fans and 5A plug points etc.,
(i) Aerial fuse board of size 15 x 10 x 6cm with 32 A aerial fuse carrier(3 Nos.)
(iii)Wall mounting type MS cubical EB meter box with fuse carrier (3 Nos) of 32 A capacity at EB supply point.This box is also to accommodate TNEB energy meter with proper ventilation as approved by TNEB.
(ii) Supply and laying of 7/20 size PVC insulator copper conductor cable from Aerial fuse to EB supply point etc., complete as per I.E Rules.
25mm dia GI pipe for service point
25mm dia elbow
GI wire for earth
Stay wire 7/20
20mm GI pipe for twin earthing and cableencasing
4 way neytral link
TW panel board
Labour charges for erection of submersible pump set including fixing and jointing the submersible cable with clamps to the required depth, valves and errection panel board control room twin earthing as per I.E Rules including cost of civil works - Upto 5 HP
Construction of Bore pit arrangements complete ect.
PUMP ROOM Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers
Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers.
Brick work in CM 1:5 using country briks for Foundation and basement
For super structure
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by TWAD Board Officers.
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) excluding cost of steel fabrication,fixing in position and centring charges but including mixing,lifting and vibrating for SUNSHADE 75mm thick at wall face and 50mm thick at free end projecting 45cm from wall face moulded along with lintel etc. as directed by TWAD Board Officers.
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers.
Special ceiling plastering for RCC Slab with C.M.1:3(One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by TWAD Board Officers.
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by TWAD Board Officers.
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.6 x 0.45 m
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departm
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by TWAD Board Officers.
Weathering Coarse over RCC roof including fixing one coarse of pressed tiles etc., complete.
Provision of lock and key for pump room and OHT ladder
Pumping Main - Supply,delivery, laying and jointing of 90mm OD PVC 6Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
b 90mm PVC Threaded coupler
New Borewell :Charges for Conducting Geo Physical Survey
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the TWAD Board Officers) including construction of mud pit. 0m to 18m depth
18m to 120m depth
Supply & delivery of 150mm Dia PVC Plain Casing pipe as per IS 12818 / 2010
Supply & delivery of 150mm Dia PVC end cap as per IS 12818 / 2010
Distribution Main - Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
63mm x 50mm PVC Threaded Coupler Page 10 SOR
63mm x 50mm PVC Tee IS 7834/1987 page 10
63mm End cap page 12 sl.no
Provision for gate valve 80mm
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 156 Nos in Ramadsamuthiram colony Habitation in Ramadsamuthiram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 20 Nos in Kandayanallur Habitation in Srirangarajapuram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 57 Nos in Kandayanallur colony Habitation in Srirangarajapuram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 29 Nos in Melpuradai Habitation in Srirangarajapuram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 9 Nos in Parpanankadu Habitation in Srirangarajapuram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 31 Nos in Parpanankadu colony Habitation in Srirangarajapuram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 5 Nos in Valluvar colony Habitation in Srirangarajapuram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 184 Nos in Srirangarajapuram Habitation in Srirangarajapuram Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Pumpset estimate - Supply and delivery of vertical wet type submersible pumpset (.....HP) capable of discharging any of the following pumpage in lpm against noted head in m suitable for erection into the bore well/Inf. well / open well with stainless steel shaft, bronze impeller and starter. - Supply, delivery and erection of Submersible Pumpset of 75 LPMX 175 Head as per SOR TWAD - Page 88
Supply and delivery of 3 phase Panel Board D.O.L with two level guard and auto start confirming to IS specification for 1 HP pumpset. TWAD SOR Page 101
Supply, delivery of 1.1 KV Grade,PVC insulated and sheathed 3 core flat copper submersible cable with ISI marking conforming of IS 694/1990 of reputed make for submersible motor erected in borewell. - 4.0 Sq.mm Copper cable page 109 II slno 2
Supply and Delivery of 1.1 KV grade 3 core Aluminum conductor U.G. cable conforming to IS 1554/part I and with ISI marking of reputed make for submersible motor erected in the Bore well/Open well page 109 ……..Sq.mm Armoured Aluminum conductor cable
Laying of …….Sqmm Armoured Aluminum conductor cable in trenches inside the pump room or in air etc., complet
Laying of …….Sqmm Armoured Aluminum conductor cable intrenches inside the pump room etc., complet
Supply and delivery of GI medium class pipes and specials as per relevant IS as listed below. - 50mm UPVC COLUMN PIPE
50mm GI Flangeset Heavy page 29
40mm MS Clampset Heavy page 29
50mm GM Non Return Valve page 30
50 x 40mm GI reducer heavy page 26
63m PVC T.Coupler
40mm Ball Valve/ GM Gate Valve page 30
40W box type tube light - 1 No.
100W bulb with angle holder
100W bulk head fittings
5 AMPS 3 pin socket with switch
5 Amps switches for light(Flush type)
Providing lighting wiring using MS conduit pipes and specials with 2 runs 1.5 sqmm PVC copper wire and 1 run 12 swg GI wire for earthing for light, fans and 5A plug points etc.,
(i) Aerial fuse board of size 15 x 10 x 6cm with 32 A aerial fuse carrier(3 Nos.)
(iii)Wall mounting type MS cubical EB meter box with fuse carrier (3 Nos) of 32 A capacity at EB supply point.This box is also to accommodate TNEB energy meter with proper ventilation as approved by TNEB.
(ii) Supply and laying of 7/20 size PVC insulator copper conductor cable from Aerial fuse to EB supply point etc., complete as per I.E Rules.
25mm dia GI pipe for service point
25mm dia elbow
GI wire for earth
Stay wire 7/20
20mm GI pipe for twin earthing and cableencasing
4 way neytral link
TW panel board
Labour charges for erection of submersible pump set including fixing and jointing the submersible cable with clamps to the required depth, valves and errection panel board control room twin earthing as per I.E Rules including cost of civil works - Upto 5 HP
Construction of Bore pit arrangements complete ect.
PUMP ROOM Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers
Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers.
Brick work in CM 1:5 using country briks for Foundation and basement
For super structure
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by TWAD Board Officers.
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) excluding cost of steel fabrication,fixing in position and centring charges but including mixing,lifting and vibrating for SUNSHADE 75mm thick at wall face and 50mm thick at free end projecting 45cm from wall face moulded along with lintel etc. as directed by TWAD Board Officers.
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers.
Special ceiling plastering for RCC Slab with C.M.1:3(One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by TWAD Board Officers.
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by TWAD Board Officers.
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.6 x 0.45 m
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departm
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by TWAD Board Officers.
Weathering Coarse over RCC roof including fixing one coarse of pressed tiles etc., complete.
Provision of lock and key for pump room and OHT ladder
Pumping Main - Supply,delivery, laying and jointing of 90mm OD PVC 6Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
b 90mm PVC Threaded coupler
New Borewell :Charges for Conducting Geo Physical Survey
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the TWAD Board Officers) including construction of mud pit. 0m to 18m depth
18m to 120m depth
Supply & delivery of 150mm Dia PVC Plain Casing pipe as per IS 12818 / 2010
Supply & delivery of 150mm Dia PVC end cap as per IS 12818 / 2010
Distribution Main - Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
63mm x 50mm PVC Threaded Coupler Page 10 SOR
63mm x 50mm PVC Tee IS 7834/1987 page 10
63mm End cap page 12 sl.no
Provision for gate valve 80mm
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 88 Nos in Theyyar colony Habitation in Theyyar Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 91 Nos in Vadacherri colony Habitation in Theyyar Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Implementation of Jal Jeevan Mission to provide Functional Household Tap connection to Rural Households 410 Nos in Theyyar Habitation in Theyyar Panchayat
Providing cost and supply of 75mm x 20mm dia PVC saddle piece with bolt and nut with rubber bush -1,15mm dia PVC male threaded adaptor -2 nos,15mm dia PVC Female threaded adaptor - 1 no, 20mm dia PVC coupler - 4 Nos, 20mm dia PVC bend - 4 Nos, 20mm dia PVC pipe - 8m,Earthwork Excavation for 20mm PVC pipe laying work including cost of Refilling work as per Standard Specifications 20B ( size 8.0m x 0.60 x 0.9),Labour Charges for Laying & Jointing 20 mm pipe - 8m,Supply & Laying & Jointing 20 mm PVC Elbow-1no,Labour Charges for Laying & Jointing 20 mm pipe-1no, Supply & jointing 20mm SS tap - 1 no,PVC ball valve with one side compression end and other side female end 20mm dia - 1 no, Labour charges for drilling, cutting and fixing ferrule in distribution line - 1no, Ms Clamp - 3 nos, Cutting MDPE pipes and specials true axis and finishing the end - 6 nos , Flow Control valve -1no
Provision for Name board
Pumpset estimate - Supply and delivery of vertical wet type submersible pumpset (.....HP) capable of discharging any of the following pumpage in lpm against noted head in m suitable for erection into the bore well/Inf. well / open well with stainless steel shaft, bronze impeller and starter. - Supply, delivery and erection of Submersible Pumpset of 75 LPMX 175 Head as per SOR TWAD - Page 88
Supply and delivery of 3 phase Panel Board D.O.L with two level guard and auto start confirming to IS specification for 1 HP pumpset. TWAD SOR Page 101
Supply, delivery of 1.1 KV Grade,PVC insulated and sheathed 3 core flat copper submersible cable with ISI marking conforming of IS 694/1990 of reputed make for submersible motor erected in borewell. - 4.0 Sq.mm Copper cable page 109 II slno 2
Supply and Delivery of 1.1 KV grade 3 core Aluminum conductor U.G. cable conforming to IS 1554/part I and with ISI marking of reputed make for submersible motor erected in the Bore well/Open well page 109 ……..Sq.mm Armoured Aluminum conductor cable
Laying of …….Sqmm Armoured Aluminum conductor cable in trenches inside the pump room or in air etc., complet
Laying of …….Sqmm Armoured Aluminum conductor cable intrenches inside the pump room etc., complet
Supply and delivery of GI medium class pipes and specials as per relevant IS as listed below. - 50mm UPVC COLUMN PIPE
50mm GI Flangeset Heavy page 29
40mm MS Clampset Heavy page 29
50mm GM Non Return Valve page 30
50 x 40mm GI reducer heavy page 26
63m PVC T.Coupler
40mm Ball Valve/ GM Gate Valve page 30
40W box type tube light - 1 No.
100W bulb with angle holder
100W bulk head fittings
5 AMPS 3 pin socket with switch
5 Amps switches for light(Flush type)
Providing lighting wiring using MS conduit pipes and specials with 2 runs 1.5 sqmm PVC copper wire and 1 run 12 swg GI wire for earthing for light, fans and 5A plug points etc.,
(i) Aerial fuse board of size 15 x 10 x 6cm with 32 A aerial fuse carrier(3 Nos.)
(iii)Wall mounting type MS cubical EB meter box with fuse carrier (3 Nos) of 32 A capacity at EB supply point.This box is also to accommodate TNEB energy meter with proper ventilation as approved by TNEB.
(ii) Supply and laying of 7/20 size PVC insulator copper conductor cable from Aerial fuse to EB supply point etc., complete as per I.E Rules.
25mm dia GI pipe for service point
25mm dia elbow
GI wire for earth
Stay wire 7/20
20mm GI pipe for twin earthing and cableencasing
4 way neytral link
TW panel board
Labour charges for erection of submersible pump set including fixing and jointing the submersible cable with clamps to the required depth, valves and errection panel board control room twin earthing as per I.E Rules including cost of civil works - Upto 5 HP
Construction of Bore pit arrangements complete ect.
PUMP ROOM Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers
Levelling course with P.C.C 1:4:8 (one cement, four sand and eigth course aggregate) using 40 mm H.B.G stone including mixing concrete, laying, curing and compacting of concrete etc., complete and as directed by the TWAD Board Officers.
Earth filling in basement & sides of foundation with excavated earth including ramming and consolidation etc., complete
Supply and filling the foundation and basement with clear river sand in layers complying with standard specification including consolidation and watering etc. complete and as directed by TWAD Board Officers.
Brick work in CM 1:5 using country briks for Foundation and basement
For super structure
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) for the following members.The rate to excludethe cost of steel for reinforcement,centering,shuttering, strutting but includingcost of mixing of concrete,placing,vibrating with Mechanical Vibrator, finishing and curing etc. complete and as directed by TWAD Board Officers.
Reinforced cement concrete 1 : 1 1/2: 3(one cement,oneand half sand and three coarse aggregate)using 20mm size hard broken stone jelly(machine crushed) excluding cost of steel fabrication,fixing in position and centring charges but including mixing,lifting and vibrating for SUNSHADE 75mm thick at wall face and 50mm thick at free end projecting 45cm from wall face moulded along with lintel etc. as directed by TWAD Board Officers.
Steel centering for soffits of RCC members including shuttering,strutting to the centring and providing supports etc.complete for the following members using MS Sheets of size 90cm x 60cm and BG 10 Gaugesstiffened with welded MS angles of size 25 x 25 x3mm laid over Silver Oak(country wood) joists of size 10 x 6.5 cm (spaced at about 90cm C/C) and supported by Casurania props of 10 cm to 13 cm dia. spaced at 75 cm C/C and as directed by TWAD Board Officers.The centring materials should be supplied and should be removed after the specified stripping time of the concrete as per IS 456/1978.
Plastering with C.M. 1:5(One part of cement and Five parts of sand) with 12mm thick over brickwork portion including labour charges for mixing finishing and curing etc., complete and as directed by TWAD Board Officers.
Special ceiling plastering for RCC Slab with C.M.1:3(One part of cement and Three parts of sand) 10mm thickover RCC surface including labour charges for mixing finishingand curing etc., complete as directed by TWAD Board Officers.
Flooring in C C 1:4:8 (one cement ,four sand and eight HBS) 10 cm thick using 40mm HBS metal and top finished with Cement mortar 1:3 (one cement and three sand) 12 mm thick including labour charges for mixing,finishing and curing etc. complete and as directed by TWAD Board Officers.
Supply and fixing of MS door (Single leaf) of sizes 1.00 x 2.00m in MS angle 50 x 50 x 4mm and MS flat 35 x 6mm with MS sheet of 18 gauge including ventilating arrangements using 20mm square MS rods with locing arrangements including two coats of approved enamel painting over one coat of primer
Supply, fabricating and fixing in position of RTS rods including cost of steel and binding wire etc., complete.
Supply and fixing of RCC box type jolly of size 0.6 x 0.45 m
Painting two coats with approved cement paint over one priming coat of white cement over cement plastered wall surface and ceiling including cleaning preparing the surface and curing etc., complete (using cement paint of colour as approved by the Departm
White washing two coats using fine screened shell lime for the new plastered surface for inner and outer side of the room including the cost of materials labour charges etc., complete and as directed by TWAD Board Officers.
Weathering Coarse over RCC roof including fixing one coarse of pressed tiles etc., complete.
Provision of lock and key for pump room and OHT ladder
Pumping Main - Supply,delivery, laying and jointing of 90mm OD PVC 6Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
b 90mm PVC Threaded coupler
New Borewell :Charges for Conducting Geo Physical Survey
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site ( Site will be shown by the TWAD Board Officers) including construction of mud pit. 0m to 18m depth
18m to 120m depth
Supply & delivery of 150mm Dia PVC Plain Casing pipe as per IS 12818 / 2010
Supply & delivery of 150mm Dia PVC end cap as per IS 12818 / 2010
Distribution Main - Supply,delivery, laying and jointing of 63mm OD PVC 4Ksc pipe inlcuding earth work excavation in all strata soil, refilling and hydraulic testing, adopting standard specification and as directed by TWAD Board Officer.
Supply of PVC specials as per BIS 10124/1988 Part 1 to 13 &BIS 7834/1975 with ISI Marks to site of works - a.90mm PVC Bend
63mm x 50mm PVC Threaded Coupler Page 10 SOR
63mm x 50mm PVC Tee IS 7834/1987 page 10
63mm End cap page 12 sl.no
Provision for gate valve 80mm
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sri Venkateswara Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .