Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.3 LAccepted-AOC | ₹11.3 L Quoted ₹13.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹13.4 LRejected-AOC | ₹13.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | BHARATHI ENTERPRISES L1 | SELVA MEENA ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for welding works MS/CS for emergency Breakdown for running Mtr. | 24 | Mtr | 1,43,160 ₹1.7 L | 1,45,464 ₹1.7 L |
| 2.00 | Charges for welding works MS/CS pipes upto 25mm dia. | 40 | Nos | 43,960 ₹51,872.80 | 44,640 ₹52,675.20 |
| 3.00 | Charges for welding pipe 50/65 mm dia | 50 | Nos | 69,900 ₹82,482 | 71,000 ₹83,780 |
| 4.00 | Charges for welding pipe 80/100 mm dia | 40 | Nos | 74,360 ₹87,744.80 | 75,560 ₹89,160.80 |
| 5.00 | Charges for welding pipe 150/200 mm dia. | 50 | Nos | 1,22,850 ₹1.4 L | 1,24,800 ₹1.5 L |
| 6.00 | Oil level checking and oil topping up in 3Nos hydrazine dozing pump, 3Nos Morpholine dozing pump, attending any water leakage from service water line, attending any emergencies during odd hours & Removal of oil seepages and dust from dozing pumps and tanks in Unit IV & V . | 340 | Nos | 5,15,100 ₹6.1 L | 5,23,600 ₹6.2 L |
| 7.00 | Choke releasing work of suction and discharge valves of Hydrazine and Morpholine dozing pumps. | 40 | Nos | 67,200 ₹79,296 | 68,280 ₹80,570.40 |
| 8.00 | Attending flange leak in Ferrous sulphate dozing from Unit II to Unit V (4mtr elevation) | 30 | Nos | 50,580 ₹59,684.40 | 51,420 ₹60,675.60 |
| 9.00 | Breakdown/Overhauling of hydrazine dozing pump PR 5 / PR 10 | 4 | Nos | 59,376 ₹70,063.68 | 60,328 ₹71,187.04 |
| 10.00 | Breakdown/ Overhauling of Morpholine dozing pump PR 15 | 2 | No | 29,688 ₹35,031.84 | 30,164 ₹35,593.52 |
Tender Value
Refer Docs
EMD Value
₹9,300
Closing Date
31 Dec 2025, 2:00 pmClosed
CE/TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin 628004.
TTPS Mech II TM II Breakdown Maintenance of dozing pump system dewatering pump sump pump Service water lines of Units IV V for the period from 01 04 2026 to 31 03 2027
2025_EB_632510_1
CE/TTPS/SE/M-II/No.26/2026-27
Open Tender
Miscellaneous Works
365 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹9,300
Yes
23 Mar 2026
15 Dec 2025
2 Jan 2026
15 Dec 2025
31 Dec 2025
15 Dec 2025
Charges for welding works MS/CS for emergency Breakdown for running Mtr.
Charges for welding works MS/CS pipes upto 25mm dia.
Charges for welding pipe 50/65 mm dia
Charges for welding pipe 80/100 mm dia
Charges for welding pipe 150/200 mm dia.
Oil level checking and oil topping up in 3Nos hydrazine dozing pump, 3Nos Morpholine dozing pump, attending any water leakage from service water line, attending any emergencies during odd hours & Removal of oil seepages and dust from dozing pumps and tanks in Unit IV & V .
Choke releasing work of suction and discharge valves of Hydrazine and Morpholine dozing pumps.
Attending flange leak in Ferrous sulphate dozing from Unit II to Unit V (4mtr elevation)
Breakdown/Overhauling of hydrazine dozing pump PR 5 / PR 10
Breakdown/ Overhauling of Morpholine dozing pump PR 15
Breakdown Maintenance of dewatering pump and its allied lines.
Choke releasing work of suction line and foot valve of dewatering pumps.
Breakdown / Overhauling of Vertical sump pump in unit IV & V
Renewal of worn out ½ '' / 1 '' valves (SS 316) by new one in hydrazine and Morpholine dozing pumps by cutting and welding with SS electrodes
SELVA MEENA ENTERPRISES (BID ID -1542972)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_756686.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid