Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.1 L
EMD Value
₹4,000
Closing Date
11 Nov 2022, 3:00 pmClosed
The Block Development Officer(VP)
Block Development Office, Nallampalli
Providing Green Net with Fencing 144m With Extention of Pipe Line with water tub Arrangements to new Additional Nursary at Laligam
2022_RDTN_258969_1
Roc.No.4295/2021/E1, Dt. 27.10.2022
Open Tender
Civil Works
Works
60 days
Block Development Office, Nallampalli
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹4,000
Yes
Block Development Office, Nallampalli
16 Nov 2022
29 Oct 2022
11 Nov 2022
29 Oct 2022
11 Nov 2022
1 Nov 2022
1 Nov 2022
Amount
Providing Green Net with Fencing 144m With Extention of Pipe Line with water tub Arrangements to new Additional Nursary at Laligam
Construction of KIOSK Pedestal for housing the Panel board of size: 1.2 x 0.45 X 0.75m ....(Vide Separate Estimate)...
Earth work excavation and depositing for on bank with in intial lead lift in Hg Soil for foundation etc, complete.
Plain Cement concrete 1:4:8 mix conveyance of all materials to site and all labour charges using 40mm ISS metal including all cost and etc complete.
Brick work CM 1:5 mix using of all materials to site and all labour good country bricks including cost and conveyance charges etc complete.
Plastering with cement 1:5-12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Supply, delivery and fixing of MS KIOSK of size: 0.75mx0.75mx0.75m for fixing of Meter Board, Switch Board and MS Door with Lock & Key, including loading, Junloading, transportation charges etc., complete.
Painting two coats with over Iron work with approved quality paint for MS Kiosk etc., complete
Painting two coat of approved cement paint over the one coat of primer 7 coat over plastered surface including cost and all other charges etc.,
Supply, delivery, erection and commissioning of wet type 100mm dia Single phase Submersible pumpset including cost of cable, PVC & GI Pipes and Specials etc. complete. HP :2.0, Duty: 20 lpm x 150m Head ..(Vide Separate Estimate)........
Supply and delivery of 100mm dia single phase Submersible Pumpset including tax charges. (Pumpset: 2.00HP, Duty: 20 lpm x 150 m)
single phase panel board with two level guard and Set auto starter including tax charges.
40mm UPVC Pipe
40mm GI pipe (Medium - B Class)
40mm GI Elbow
40mm GI Union
40mm MS Clamp Set
40mm GM Non Return Valve
2.5 Sq.mm Copper Submersible Cable
7/20 copper wire for Service Connection
20mm GI Pipe for encasing
25mm GI Pipe for Service Connection
20 mm GI Bend
25 mm GI Bend
Labour charges for erection, testing and commissioning of the submersible pumpsets in the bore well including fixing and jointing the submersible cable with proper clamps up to the starter to the required depth using erection of clamps, valves, Panel Board
Supply, delivery, laying, jointing and testing of PVC HDPE pipes specials including earthwork excavation refilling etc........(Vide Separate Estimate)........
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 208
Supply of 63mm to site and all HDPE Pipes including cost and conveyance of all materials labour charges etc., completed
Labour charges for laying and joining 40mm HDPE Pipes including all labour 3 charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete.
Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete. (Pipeline, D/F Pipe)
Construction of Pedestal with 1000 litres capacity of HDPE Tank (Vide Separate Estimate).......
Earth work excavation and depositing on bank with initial lead of 10m and lift of 2.00m in Hard stiff clay, Stiff Black Cotton soil, Hard red earth, Shaless, Murrams and earth mixed with small size boulders etc, as per SS 208.
Plain Cement Concrete 1:4:8 (one cement four sand and eight aggregate) using 40mm HBS for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Brick work in CM 1:6 (one cement six sand) using country bricks of size 83/4" x 44" x 2" including curing etc. complete.
Plastering with CM 1:5, (one cement and five sand) 12mm thick over brick work including finishing curing etc. complete.
Supply, delivery and fixing of HDPE Tank including loading, unloading, 5 transportation, fixing and necessary GI Pipes and specials for Pipe connection works including cutting, threading and fixing charges etc. complete.
Painting two coats with approved Exterior Emulsion over one coat of priming over the cement plastered exposed surface of the brick work including cleaning, preparing the surface and curing etc. complete.
Supply and deliver of following GI Pipes and Specials conforming to IS 554/86 for GI Pipes IS 1239-1990 part 1 required for Tab connection
32 mm GI Elbow
32 mm GI Bend
20 mm Waste Not Tap
20 mm GI Elbow
20 mm GI Pipe
Deposit to TNEB for service connection
Fenching Arrangements
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be 1 directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary as per SS 20 B
Cement concrete 1:4:8 mix using 40mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
Centering Charges inclusive of all material and labour charges etc., complete as per standard specification.
Cement concrete 1:2:4 mix using 20mm size HBG metal including cost and conveyance of all materials to site labour charges for laying consolidation curing etc.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supply and Fixing of Barbed Wire including alll Cost and Conveyance atc all complete
Providing for Erecting Charges for Precast RCC vertical Post including all etc Complete
Provision for Tieing the Vertical Post including all labour Charges
Provision for Grill gate including all Cost and all labour Charges
Green Net Arrangements
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .