Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
19 Sept 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Purchase
Fire Equipment maintenance RBS
GEM/2022/B/2512315
GEM/2022/B/2512315
Open Tender
Two Bid
Unknown (Unspecified Location)
₹0
Exempted
19 Sept 2022
9 Sept 2022
19 Sept 2022
19 Sept 2022
8 Sept 2022 - 19 Sept 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | SERVICING OF FE,DCP,9KG | SERVICING OF FE,DCP,9KG — SERVICING OF 9 KG DCP TYPE FIRE EXTINGUISHERS AS PER OISD 117 AND OISD 142. | - | Each |
| 2 | SERVICING OF FE,DCP,75KG | SERVICING OF FE,DCP,75KG — SERVICING OF 75 KG DCP TYPE FIRE EXTINGUISHERS AS PER OISD 117 AND OISD 142 AND TERMS AND CONDITION ATTACHED IN TENDER. | - | Each |
| 3 | SERVICING OF FE,CO2,2KG | SERVICING OF FE,CO2,2KG — SERVICING OF 2 KG CO2 TYPE FIRE EXTINGUISHERS AS PER OISD 117 AND OISD 142. | - | Each |
| 4 | SERVICING OF FE, CO2,3.2KG | SERVICING OF FE, CO2,3.2KG — MONTHLY SERVICING OF CO2-3.2 KG. | - | Each |
| 5 | SERVICING OF FE,CO2,4.5KG | SERVICING OF FE,CO2,4.5KG — A) EXAMINE THE CYLINDER EXTERNALLY FOR ITS CONDITION OF PAINTING, RUST FORMATION, DENTS AND CRACKS ETC.B) THE CYLINDER SHOULD BE DETACHED AND WEIGHED ON THE WEIGHING SCALE. IF IT IS LESS THAN 90% OF THE GROSS WEIGHT MENTIONED ON THE CYLINDER, THE SAME S | - | Each |
| 6 | SERVICING OF FE,CO2,6.8KG | SERVICING OF FE,CO2,6.8KG — SERVICING OF 6.8 KG CO2 TYPE FIRE EXTINGUISHERS AS PER OISD 117 AND OISD 142. | - | Each |
| 7 | SERVICING OF 200 L FOAM | SERVICING OF 200 L FOAM — SERVICING OF 200 L FOAM TROLLEY, FOR UPKEEP AND FUNCTIONALITY AS PER APPLICABLE OISD NORMS. | - | Each |
| 8 | HYDROSTATIC TESTING FIRE | HYDROSTATIC TESTING FIRE — PRESSURE TESTING OF FIRE HOSED IN THE PIPELINE AREA AND FIRE TENDER AT AN INTERVAL OF 6 MONTHS AT A PRESSURE OF 7 KG/SQ.CM AND SUBMITTING CERTIFICATE TO THAT EFFECT. THE FIRE HOSES ARE TO BE KEPT BACK AT ITS PREVIOUS PLACE AFTER NECESSARY MAINTENANCE /SER | - | Each |
| 9 | HYDROTESTING OF | HYDROTESTING OF — HYDRO STATIC PRESSURE OF FIRE EXTINGUISHERS TO BE DONE AS AND WHEN REQUIRED AS PER IS: 2190. THE DCP EXTINGUISHERS TO BE TESTED ONCE IN 3 YEARS, CO2 EXTINGUISHER ONCE IN 5 YEARS. 1/3 RD OF TOTAL DCP EXTINGUISHERS SHALL BE HYDRO TESTED EVERY YEAR. TEST PRE | - | Each |
| 10 | HYDROTESTING AND UST 75 | HYDROTESTING AND UST 75 — HYDROTESTING AND UST 75 KG DCP: HYDROTESTING AND ULTRASONIC THICKNESS TESTING FOR 75 KG DCP TYPE FIRE EXTINGUISHER AS PER OISD-142. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000049-HB-11986.pdf
TENDER_DOCUMENT • 18.32 MB
112982.pdf
TENDER_DOCUMENT • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .